Skip to content.Skip to side navigation. Quick Navigation: Skip to content.Skip to side navigation.
GPO Access Home Page.
Jump to selected topic.
Navigation Bar
About.Help. A-Z Resource List. Locate a Federal Depository Library. Buy Publications. Legislative. Executive. Judicial.
National Archives and Records Administration logo.
Database Features.
Browse
Simple Search
Advanced Search
* Boolean
  * Proximity
Search History
Search Tips
Corrections

Latest Updates

User Info
FAQs
Agency List
Incorporation by Reference
e-CFR Main Page
Related Resources
Code of Federal Regulations
Federal Register
List of CFR
Sections Affected
Regulations.gov
Unified Agenda
All NARA Publications
About Government.
Ben's Guide Logo.
Get Adobe Reader

blue pill
e-CFR Data is current as of February 4, 2010


Title 40: Protection of Environment
PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES

Browse Next

Subpart A—General Provisions

§ 60.1   Applicability.

(a) Except as provided in subparts B and C, the provisions of this part apply to the owner or operator of any stationary source which contains an affected facility, the construction or modification of which is commenced after the date of publication in this part of any standard (or, if earlier, the date of publication of any proposed standard) applicable to that facility.

(b) Any new or revised standard of performance promulgated pursuant to section 111(b) of the Act shall apply to the owner or operator of any stationary source which contains an affected facility, the construction or modification of which is commenced after the date of publication in this part of such new or revised standard (or, if earlier, the date of publication of any proposed standard) applicable to that facility.

(c) In addition to complying with the provisions of this part, the owner or operator of an affected facility may be required to obtain an operating permit issued to stationary sources by an authorized State air pollution control agency or by the Administrator of the U.S. Environmental Protection Agency (EPA) pursuant to Title V of the Clean Air Act (Act) as amended November 15, 1990 (42 U.S.C. 7661). For more information about obtaining an operating permit see part 70 of this chapter.

(d) Site-specific standard for Merck & Co., Inc.'s Stonewall Plant in Elkton, Virginia. (1) This paragraph applies only to the pharmaceutical manufacturing facility, commonly referred to as the Stonewall Plant, located at Route 340 South, in Elkton, Virginia (“site”).

(2) Except for compliance with 40 CFR 60.49b(u), the site shall have the option of either complying directly with the requirements of this part, or reducing the site-wide emissions caps in accordance with the procedures set forth in a permit issued pursuant to 40 CFR 52.2454. If the site chooses the option of reducing the site-wide emissions caps in accordance with the procedures set forth in such permit, the requirements of such permit shall apply in lieu of the otherwise applicable requirements of this part.

(3) Notwithstanding the provisions of paragraph (d)(2) of this section, for any provisions of this part except for Subpart Kb, the owner/operator of the site shall comply with the applicable provisions of this part if the Administrator determines that compliance with the provisions of this part is necessary for achieving the objectives of the regulation and the Administrator notifies the site in accordance with the provisions of the permit issued pursuant to 40 CFR 52.2454.

[40 FR 53346, Nov. 17, 1975, as amended at 55 FR 51382, Dec. 13, 1990; 59 FR 12427, Mar. 16, 1994; 62 FR 52641, Oct. 8, 1997]

§ 60.2   Definitions.

The terms used in this part are defined in the Act or in this section as follows:

Act means the Clean Air Act (42 U.S.C. 7401 et seq. )

Administrator means the Administrator of the Environmental Protection Agency or his authorized representative.

Affected facility means, with reference to a stationary source, any apparatus to which a standard is applicable.

Alternative method means any method of sampling and analyzing for an air pollutant which is not a reference or equivalent method but which has been demonstrated to the Administrator's satisfaction to, in specific cases, produce results adequate for his determination of compliance.

Approved permit program means a State permit program approved by the Administrator as meeting the requirements of part 70 of this chapter or a Federal permit program established in this chapter pursuant to Title V of the Act (42 U.S.C. 7661).

Capital expenditure means an expenditure for a physical or operational change to an existing facility which exceeds the product of the applicable “annual asset guideline repair allowance percentage” specified in the latest edition of Internal Revenue Service (IRS) Publication 534 and the existing facility's basis, as defined by section 1012 of the Internal Revenue Code. However, the total expenditure for a physical or operational change to an existing facility must not be reduced by any “excluded additions” as defined in IRS Publication 534, as would be done for tax purposes.

Clean coal technology demonstration project means a project using funds appropriated under the heading ‘Department of Energy-Clean Coal Technology’, up to a total amount of $2,500,000,000 for commercial demonstrations of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency.

Commenced means, with respect to the definition of new source in section 111(a)(2) of the Act, that an owner or operator has undertaken a continuous program of construction or modification or that an owner or operator has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction or modification.

Construction means fabrication, erection, or installation of an affected facility.

Continuous monitoring system means the total equipment, required under the emission monitoring sections in applicable subparts, used to sample and condition (if applicable), to analyze, and to provide a permanent record of emissions or process parameters.

Electric utility steam generating unit means any steam electric generating unit that is constructed for the purpose of supplying more than one-third of its potential electric output capacity and more than 25 MW electrical output to any utility power distribution system for sale. Any steam supplied to a steam distribution system for the purpose of providing steam to a steam-electric generator that would produce electrical energy for sale is also considered in determining the electrical energy output capacity of the affected facility.

Equivalent method means any method of sampling and analyzing for an air pollutant which has been demonstrated to the Administrator's satisfaction to have a consistent and quantitatively known relationship to the reference method, under specified conditions.

Excess Emissions and Monitoring Systems Performance Report is a report that must be submitted periodically by a source in order to provide data on its compliance with stated emission limits and operating parameters, and on the performance of its monitoring systems.

Existing facility means, with reference to a stationary source, any apparatus of the type for which a standard is promulgated in this part, and the construction or modification of which was commenced before the date of proposal of that standard; or any apparatus which could be altered in such a way as to be of that type.

Force majeure means, for purposes of §60.8, an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents the owner or operator from complying with the regulatory requirement to conduct performance tests within the specified timeframe despite the affected facility's best efforts to fulfill the obligation. Examples of such events are acts of nature, acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility.

Isokinetic sampling means sampling in which the linear velocity of the gas entering the sampling nozzle is equal to that of the undisturbed gas stream at the sample point.

Issuance of a part 70 permit will occur, if the State is the permitting authority, in accordance with the requirements of part 70 of this chapter and the applicable, approved State permit program. When the EPA is the permitting authority, issuance of a Title V permit occurs immediately after the EPA takes final action on the final permit.

Malfunction means any sudden, infrequent, and not reasonably preventable failure of air pollution control equipment, process equipment, or a process to operate in a normal or usual manner. Failures that are caused in part by poor maintenance or careless operation are not malfunctions.

Modification means any physical change in, or change in the method of operation of, an existing facility which increases the amount of any air pollutant (to which a standard applies) emitted into the atmosphere by that facility or which results in the emission of any air pollutant (to which a standard applies) into the atmosphere not previously emitted.

Monitoring device means the total equipment, required under the monitoring of operations sections in applicable subparts, used to measure and record (if applicable) process parameters.

Nitrogen oxides means all oxides of nitrogen except nitrous oxide, as measured by test methods set forth in this part.

One-hour period means any 60-minute period commencing on the hour.

Opacity means the degree to which emissions reduce the transmission of light and obscure the view of an object in the background.

Owner or operator means any person who owns, leases, operates, controls, or supervises an affected facility or a stationary source of which an affected facility is a part.

Part 70 permit means any permit issued, renewed, or revised pursuant to part 70 of this chapter.

Particulate matter means any finely divided solid or liquid material, other than uncombined water, as measured by the reference methods specified under each applicable subpart, or an equivalent or alternative method.

Permit program means a comprehensive State operating permit system established pursuant to title V of the Act (42 U.S.C. 7661) and regulations codified in part 70 of this chapter and applicable State regulations, or a comprehensive Federal operating permit system established pursuant to title V of the Act and regulations codified in this chapter.

Permitting authority means:

(1) The State air pollution control agency, local agency, other State agency, or other agency authorized by the Administrator to carry out a permit program under part 70 of this chapter; or

(2) The Administrator, in the case of EPA-implemented permit programs under title V of the Act (42 U.S.C. 7661).

Proportional sampling means sampling at a rate that produces a constant ratio of sampling rate to stack gas flow rate.

Reactivation of a very clean coal-fired electric utility steam generating unit means any physical change or change in the method of operation associated with the commencement of commercial operations by a coal-fired utility unit after a period of discontinued operation where the unit:

(1) Has not been in operation for the two-year period prior to the enactment of the Clean Air Act Amendments of 1990, and the emissions from such unit continue to be carried in the permitting authority's emissions inventory at the time of enactment;

(2) Was equipped prior to shut-down with a continuous system of emissions control that achieves a removal efficiency for sulfur dioxide of no less than 85 percent and a removal efficiency for particulates of no less than 98 percent;

(3) Is equipped with low-NOXburners prior to the time of commencement of operations following reactivation; and

(4) Is otherwise in compliance with the requirements of the Clean Air Act.

Reference method means any method of sampling and analyzing for an air pollutant as specified in the applicable subpart.

Repowering means replacement of an existing coal-fired boiler with one of the following clean coal technologies: atmospheric or pressurized fluidized bed combustion, integrated gasification combined cycle, magnetohydrodynamics, direct and indirect coal-fired turbines, integrated gasification fuel cells, or as determined by the Administrator, in consultation with the Secretary of Energy, a derivative of one or more of these technologies, and any other technology capable of controlling multiple combustion emissions simultaneously with improved boiler or generation efficiency and with significantly greater waste reduction relative to the performance of technology in widespread commercial use as of November 15, 1990. Repowering shall also include any oil and/or gas-fired unit which has been awarded clean coal technology demonstration funding as of January 1, 1991, by the Department of Energy.

Run means the net period of time during which an emission sample is collected. Unless otherwise specified, a run may be either intermittent or continuous within the limits of good engineering practice.

Shutdown means the cessation of operation of an affected facility for any purpose.

Six-minute period means any one of the 10 equal parts of a one-hour period.

Standard means a standard of performance proposed or promulgated under this part.

Standard conditions means a temperature of 293 K (68F) and a pressure of 101.3 kilopascals (29.92 in Hg).

Startup means the setting in operation of an affected facility for any purpose.

State means all non-Federal authorities, including local agencies, interstate associations, and State-wide programs, that have delegated authority to implement: (1) The provisions of this part; and/or (2) the permit program established under part 70 of this chapter. The term State shall have its conventional meaning where clear from the context.

Stationary source means any building, structure, facility, or installation which emits or may emit any air pollutant.

Title V permit means any permit issued, renewed, or revised pursuant to Federal or State regulations established to implement title V of the Act (42 U.S.C. 7661). A title V permit issued by a State permitting authority is called a part 70 permit in this part.

Volatile Organic Compound means any organic compound which participates in atmospheric photochemical reactions; or which is measured by a reference method, an equivalent method, an alternative method, or which is determined by procedures specified under any subpart.

[44 FR 55173, Sept. 25, 1979, as amended at 45 FR 5617, Jan. 23, 1980; 45 FR 85415, Dec. 24, 1980; 54 FR 6662, Feb. 14, 1989; 55 FR 51382, Dec. 13, 1990; 57 FR 32338, July 21, 1992; 59 FR 12427, Mar. 16, 1994; 72 FR 27442, May 16, 2007]

§ 60.3   Units and abbreviations.

Used in this part are abbreviations and symbols of units of measure. These are defined as follows:

(a) System International (SI) units of measure:

A—ampere

g—gram

Hz—hertz

J—joule

K—degree Kelvin

kg—kilogram

m—meter

m3 —cubic meter

mg—milligram—10−3gram

mm—millimeter—10−3meter

Mg—megagram—106 gram

mol—mole

N—newton

ng—nanogram—10−9gram

nm—nanometer—10−9meter

Pa—pascal

s—second

V—volt

W—watt

Ω—ohm

µg—microgram—10−6gram

(b) Other units of measure:

Btu—British thermal unit

°C—degree Celsius (centigrade)

cal—calorie

cfm—cubic feet per minute

cu ft—cubic feet

dcf—dry cubic feet

dcm—dry cubic meter

dscf—dry cubic feet at standard conditions

dscm—dry cubic meter at standard conditions

eq—equivalent

°F—degree Fahrenheit

ft—feet

gal—gallon

gr—grain

g-eq—gram equivalent

hr—hour

in—inch

k—1,000

l—liter

lpm—liter per minute

lb—pound

meq—milliequivalent

min—minute

ml—milliliter

mol. wt.—molecular weight

ppb—parts per billion

ppm—parts per million

psia—pounds per square inch absolute

psig—pounds per square inch gage

°R—degree Rankine

scf—cubic feet at standard conditions

scfh—cubic feet per hour at standard conditions

scm—cubic meter at standard conditions

sec—second

sq ft—square feet

std—at standard conditions

(c) Chemical nomenclature:

CdS—cadmium sulfide

CO—carbon monoxide

CO2—carbon dioxide

HCl—hydrochloric acid

Hg—mercury

H2O—water

H2S—hydrogen sulfide

H2SO4—sulfuric acid

N2—nitrogen

NO—nitric oxide

NO2—nitrogen dioxide

NOX—nitrogen oxides

O2—oxygen

SO2—sulfur dioxide

SO3—sulfur trioxide

SOX—sulfur oxides

(d) Miscellaneous:

A.S.T.M.—American Society for Testing and Materials

[42 FR 37000, July 19, 1977; 42 FR 38178, July 27, 1977]

§ 60.4   Address.

(a) All requests, reports, applications, submittals, and other communications to the Administrator pursuant to this part shall be submitted in duplicate to the appropriate Regional Office of the U.S. Environmental Protection Agency to the attention of the Director of the Division indicated in the following list of EPA Regional Offices.

Region I (Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont), Director, Air Management Division, U.S. Environmental Protection Agency, John F. Kennedy Federal Building, Boston, MA 02203.

Region II (New Jersey, New York, Puerto Rico, Virgin Islands), Director, Air and Waste Management Division, U.S. Environmental Protection Agency, Federal Office Building, 26 Federal Plaza (Foley Square), New York, NY 10278.

Region III (Delaware, District of Columbia, Maryland, Pennsylvania, Virginia, West Virginia), Director, Air Protection Division, Mail Code 3AP00, 1650 Arch Street, Philadelphia, PA 19103–2029.

Region IV (Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, Tennessee), Director, Air and Waste Management Division, U.S. Environmental Protection Agency, 345 Courtland Street, NE., Atlanta, GA 30365.

Region V (Illinois, Indiana, Michigan, Minnesota, Ohio, Wisconsin), Director, Air and Radiation Division, U.S. Environmental Protection Agency, 77 West Jackson Boulevard, Chicago, IL 60604–3590.

Region VI (Arkansas, Louisiana, New Mexico, Oklahoma, Texas); Director; Air, Pesticides, and Toxics Division; U.S. Environmental Protection Agency, 1445 Ross Avenue, Dallas, TX 75202.

Region VII (Iowa, Kansas, Missouri, Nebraska), Director, Air, RCRA, and Toxics Division, U.S. Environmental Protection Agency, 901 N. 5th Street, Kansas City, KS 66101.

Region VIII (Colorado, Montana, North Dakota, South Dakota, Utah, Wyoming) Director, Air and Toxics Technical Enforcement Program, Office of Enforcement, Compliance and Environmental Justice, Mail Code 8ENF–AT, 1595 Wynkoop Street, Denver, CO 80202–1129.

Region IX (American Samoa, Arizona, California, Guam, Hawaii, Nevada, Northern Mariana Islands), Director, Air Division, U.S. Environmental Protection Agency, 75 Hawthorne Street, San Francisco, CA 94105.

Region X (Alaska, Oregon, Idaho, Washington), Director, Air and Waste Management Division, U.S. Environmental Protection Agency, 1200 Sixth Avenue, Seattle, WA 98101.

(b) Section 111(c) directs the Administrator to delegate to each State, when appropriate, the authority to implement and enforce standards of performance for new stationary sources located in such State. All information required to be submitted to EPA under paragraph (a) of this section, must also be submitted to the appropriate State Agency of any State to which this authority has been delegated (provided, that each specific delegation may except sources from a certain Federal or State reporting requirement). The appropriate mailing address for those States whose delegation request has been approved is as follows:

(A) [Reserved]

(B) State of Alabama: Alabama Department of Environmental Management, P.O. Box 301463, Montgomery, Alabama 36130–1463.

(C) State of Alaska, Department of Environmental Conservation, Pouch O, Juneau, AK 99811.

(D) Arizona:

Arizona Department of Environmental Quality, Office of Air Quality, P.O. Box 600, Phoenix, AZ 85001–0600.

Maricopa County Air Pollution Control, 2406 S. 24th Street, Suite E–214, Phoenix, AZ 85034.

Pima County Department of Environmental Quality, 130 West Congress Street, 3rd Floor, Tucson, AZ 85701–1317.

Pinal County Air Quality Control District, Building F, 31 North Pinal Street, Florence, AZ 85232.

Note: For tables listing the delegation status of agencies in Region IX, see paragraph (d) of this section.

(E) State of Arkansas: Chief, Division of Air Pollution Control, Arkansas Department of Pollution Control and Ecology, 8001 National Drive, P.O. Box 9583, Little Rock, AR 72209.

(F) California:

Amador County Air Pollution Control District, 500 Argonaut Lane, Jackson, CA 95642.

Antelope Valley Air Pollution Control District, 43301 Division Street, Suite 206, P.O. Box 4409, Lancaster, CA 93539–4409.

Bay Area Air Quality Management District, 939 Ellis Street, San Francisco, CA 94109.

Butte County Air Pollution Control District, 2525 Dominic Drive, Suite J, Chico, CA 95928–7184.

Calaveras County Air Pollution Control District, 891 Mountain Ranch Rd., San Andreas, CA 95249.

Colusa County Air Pollution Control District, 100 Sunrise Blvd., Suite F, Colusa, CA 95932–3246.

El Dorado County Air Pollution Control District, 2850 Fairlane Court, Bldg. C, Placerville, CA 95667–4100.

Feather River Air Quality Management District, 938 14th Street, Marysville, CA 95901–4149.

Glenn County Air Pollution Control District, 720 N. Colusa Street, P.O. Box 351, Willows, CA 95988–0351.

Great Basin Unified Air Pollution Control District, 157 Short Street, Suite 6, Bishop, CA 93514–3537.

Imperial County Air Pollution Control District, 150 South Ninth Street, El Centro, CA 92243–2801.

Kern County Air Pollution Control District (Southeast Desert), 2700 M. Street, Suite 302, Bakersfield, CA 93301–2370.

Lake County Air Quality Management District, 885 Lakeport Blvd., Lakeport, CA 95453–5405.

Lassen County Air Pollution Control District, 175 Russell Avenue, Susanville, CA 96130–4215.

Mariposa County Air Pollution Control District, P.O. Box 5, Mariposa, CA 95338.

Mendocino County Air Pollution Control District, 306 E. Gobbi Street, Ukiah, CA 95482–5511.

Modoc County Air Pollution Control District, 202 W. 4th Street, Alturas, CA 96101–3915.

Mojave Desert Air Quality Management District, 14306 Part Avenue, Victorville, CA 92392–2310.

Monterey Bay Unified Air Pollution Control District, 24580 Silver Cloud Ct., Monterey, CA 93940–6536.

North Coast Unified Air Pollution Control District, 2300 Myrtle Avenue, Eureka, CA 95501–3327.

Northern Sierra Air Quality Management District, 200 Litton Drive, P.O. Box 2509, Grass Valley, CA 95945–2509.

Northern Sonoma County Air Pollution Control District, 150 Matheson Street, Healdsburg, CA 95448–4908.

Placer County Air Pollution Control District, DeWitt Center, 11464 “B” Avenue, Auburn, CA 95603–2603.

Sacramento Metropolitan Air Quality Management District, 777 12th Street, Third Floor, Sacramento, CA 95814–1908.

San Diego County Air Pollution Control District, 9150 Chesapeake Drive, San Diego, CA 92123–1096.

San Joaquin Valley Unified Air Pollution Control District, 1999 Tuolumne Street, 1990 E. Gettysburg, Fresno, CA 93726.

San Luis Obispo County Air Pollution Control District, 3433 Roberto Court, San Luis Obispo, CA 93401–7126.

Santa Barbara County Air Pollution Control District, 26 Castilian Drive, B–23, Goleta, CA 93117–3027.

Shasta County Air Quality Management District, 1855 Placer Street, Suite 101, Redding, CA 96001–1759.

Siskiyou County Air Pollution Control District, 525 So. Foothill Drive, Yreka, CA 96097–3036.

South Coast Air Quality Management District, 21865 E. Copley Drive, Diamond Bar, CA 91765–4182.

Tehama County Air Pollution Control District, P.O. Box 38 (1750 Walnut Street), Red Bluff, CA 96080–0038.

Tuolumne County Air Pollution Control District, 2 South Green Street, Sonora, CA 95370–4618.

Ventura County Air Pollution Control District, 669 County Square Drive, Ventura, CA 93003–5417.

Yolo-Solano Air Quality Management District, 1947 Galileo Ct., Suite 103, Davis, CA 95616–4882.

Note: For tables listing the delegation status of agencies in Region IX, see paragraph (d) of this section.

(G) State of Colorado, Department of Public Health and Environment, 4300 Cherry Creek Drive South, Denver, CO 80222–1530.

Note: For a table listing Region VIII's NSPS delegation status, see paragraph (c) of this section.

(H) State of Connecticut, Bureau of Air Management, Department of Environmental Protection, State Office Building, 165 Capitol Avenue, Hartford, CT 06106.

(I) State of Delaware, Department of Natural Resources & Environmental Control, 89 Kings Highway, P.O. Box 1401, Dover, Delaware 19903.

(J) District of Columbia, Department of Public Health, Air Quality Division, 51 N Street, NE., Washington, DC 20002.

(K) State of Florida: Florida Department of Environmental Protection, Division of Air Resources Management, 2600 Blair Stone Road, MS 5500, Tallahassee, Florida 32399–2400.

(L) State of Georgia: Georgia Department of Natural Resources, Environmental Protection Division, 2 Martin Luther King Jr. Drive, SE., Suite 1152 East Floyd Tower, Atlanta, Georgia 30334–9000.

(M) Hawaii:

Hawaii State Agency, Clean Air Branch, 919 Ala Moana Blvd., 3rd Floor, Post Office Box 3378, Honolulu, HI 96814.

Note: For tables listing the delegation status of agencies in Region IX, see paragraph (d) of this section.

(N) State of Idaho, Department of Health and Welfare, Statehouse, Boise, ID 83701.

(O) State of Illinois, Bureau of Air, Division of Air Pollution Control, Illinois Environmental Protection Agency, 2200 Churchill Road, Springfield, IL 62794–9276.

(P) State of Indiana, Indiana Department of Environmental Management, 100 North Senate Avenue, P.O. Box 6015, Indianapolis, Indiana 46206–6015.

(Q) State of Iowa: Iowa Department of Natural Resources, Environmental Protection Division, Air Quality Bureau, 7900 Hickman Road, Suite 1, Urbandale, IA 50322.

(R) State of Kansas: Kansas Department of Health and Environment, Bureau of Air and Radiation, 1000 S.W. Jackson, Suite 310, Topeka, KS 66612–1366.

(S) Commonwealth of Kentucky: Commonwealth of Kentucky, Energy and Environment Cabinet, Department of Environmental Protection, Division for Air Quality, 200 Fair Oaks Lane, 1st Floor, Frankfort, Kentucky 40610–1403.

Louisville Metro Air Pollution Control District, 850 Barret Avenue, Louisville, Kentucky 40204.

(T) State of Louisiana: Louisiana Department of Environmental Quality, Office of Environmental Assessment, P.O. Box 4314, Baton Rouge, LA 70821–4314. For a list of delegated standards for Louisiana (excluding Indian country), see paragraph (e)(1) of this section.

(U) State of Maine, Bureau of Air Quality Control, Department of Environmental Protection, State House, Station No. 17, Augusta, ME 04333.

(V) State of Maryland, Department of the Environment, 1800 Washington Boulevard, Suite 705, Baltimore, Maryland 21230.

(W) Commonwealth of Massachusetts, Division of Air Quality Control, Department of Environmental Protection, One Winter Street, 7th floor, Boston, MA 02108.

(X) State of Michigan, Air Quality Division, Michigan Department of Environmental Quality, P.O. Box 30260, Lansing, Michigan 48909.

(Y) Minnesota Pollution Control Agency, Division of Air Quality, 520 Lafayette Road, St. Paul, MN 55155.

(Z) State of Mississippi: Mississippi Department of Environmental Quality, Office of Pollution Control, Air Division, 515 East Amite Street, Jackson, Mississippi 39201.

(AA) State of Missouri: Missouri Department of Natural Resources, Division of Environmental Quality, P.O. Box 176, Jefferson City, MO 65102.

(BB) State of Montana, Department of Environmental Quality, 1520 E. 6th Ave., PO Box 200901, Helena, MT 59620–0901.

Note: For a table listing Region VIII's NSPS delegation status, see paragraph (c) of this section.

(CC) State of Nebraska, Nebraska Department of Environmental Control, P.O. Box 94877, State House Station, Lincoln, NE 68509.

Lincoln-Lancaster County Health Department, Division of Environmental Health, 2200 St. Marys Avenue, Lincoln, NE 68502

(DD) Nevada:

Nevada State Agency, Air Pollution Control, Bureau of Air Quality/Division of Environmental Protection, 333 West Nye Lane, Carson City, NV 89710.

Clark County Department of Air Quality Management, 500 S. Grand Central Parkway, First floor, Las Vegas, NV 89155–1776.

Washoe County Air Pollution Control, Washoe County District Air Quality Management, P.O. Box 11130, 1001 E. Ninth Street, Reno, NV 89520.

Note: For tables listing the delegation status of agencies in Region IX, see paragraph (d) of this section.

(EE) State of New Hampshire, Air Resources Division, Department of Environmental Services, 64 North Main Street, Caller Box 2033, Concord, NH 03302–2033.

(FF) State of New Jersey: New Jersey Department of Environmental Protection, Division of Environmental Quality, Enforcement Element, John Fitch Plaza, CN–027, Trenton, NJ 08625.

(1) The following table lists the specific source and pollutant categories that have been delegated to the states in Region II. The (X) symbol is used to indicate each category that has been delegated.

  SubpartState
New JerseyNew YorkPuerto RicoVirgin Islands
DFossil-Fuel Fired Steam Generators for Which Construction Commenced After August 17, 1971 (Steam Generators and Lignite Fired Steam Generators)XXXX
DaElectric Utility Steam Generating Units for Which Construction Commenced After September 18, 1978XX
DbIndustrial-Commercial-Institutional Steam Generating UnitsXXXX
EIncineratorsXXXX
FPortland Cement PlantsXXXX
GNitric Acid PlantsXXXX
HSulfuric Acid PlantsXXXX
IAsphalt Concrete PlantsXXXX
JPetroleum Refineries—(All Categories)XXXX
KStorage Vessels for Petroleum Liquids Constructed After June 11, 1973, and prior to May 19, 1978XXXX
KaStorage Vessels for Petroleum Liquids Constructed After May 18, 1978XXX
LSecondary Lead SmeltersXXXX
MSecondary Brass and Bronze Ingot Production PlantsXXXX
NIron and Steel PlantsXXXX
OSewage Treatment PlantsXXXX
PPrimary Copper SmeltersXXXX
QPrimary Zinc SmeltersXXXX
RPrimary Lead SmeltersXXXX
SPrimary Aluminum Reduction PlantsXXXX
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid PlantsXXXX
UPhosphate Fertilizer Industry: Superphosphoric Acid PlantsXXXX
VPhosphate Fertilizer Industry: Diammonium Phosphate PlantsXXXX
WPhosphate Fertilizer Industry: Triple Superphosphate PlantsXXXX
XPhosphate Fertilizer Industry: Granular Triple SuperphosphateXXXX
YCoal Preparation PlantsXXXX
ZFerroally Production FacilitiesXXXX
AASteel Plants: Electric Arc FurnacesXXXX
AAaElectric Arc Furnaces and Argon-Oxygen Decarburization Vessels in Steel PlantsXXX
BBKraft Pulp MillsXXX
CCGlass Manufacturing PlantsXXX
DDGrain ElevatorsXXX
EESurface Coating of Metal FurnitureXXX
GGStationary Gas TurbinesXXX
HHLime PlantsXXX
KKLead Acid Battery Manufacturing PlantsXX
LLMetallic Mineral Processing PlantsXXX
MMAutomobile and Light-Duty Truck Surface Coating OperationsXX
NNPhosphate Rock PlantsXX
PPAmmonium Sulfate Manufacturing PlantsXX
QQGraphic Art Industry Publication Rotogravure PrintingXXXX
RRPressure Sensitive Tape and Label Surface Coating OperationsXXX
SSIndustrial Surface Coating: Large AppliancesXXX
TTMetal Coil Surface CoatingXXX
UUAsphalt Processing and Asphalt Roofing ManufactureXXX
VVEquipment Leaks of Volatile Organic Compounds in Synthetic Organic Chemical Manufacturing IndustryXX
WWBeverage Can Surface Coating IndustryXXX
XXBulk Gasoline TerminalsXXX
FFFFlexible Vinyl and Urethane Coating and PrintingXXX
GGGEquipment Leaks of VOC in Petroleum RefineriesXX
HHHSynthetic Fiber Production FacilitiesXX
JJJPetroleum Dry ClearnersXXX
KKKEquipment Leaks of VOC from Onshore Natural Gas Processing Plants
LLLOnshore Natural Gas Processing Plants; SO2EmissionsX
OOONonmetallic Mineral Processing PlantsXX
PPPWool Fiberglass Insulation Manufacturing PlantsXX

(GG) State of New Mexico: New Mexico Environment Department, 1190 St. Francis Drive, P.O. Box 26110, Santa Fe, New Mexico 87502. Note: For a list of delegated standards for New Mexico (excluding Bernalillo County and Indian country), see paragraph (e)(1) of this section.

(i) Albuquerque-Bernalillo County Air Quality Control Board, c/o Environmental Health Department, P.O. Box 1293, Albuquerque, New Mexico 87103.

(ii) [Reserved]

(HH) New York: New York State Department of Environmental Conservation, 50 Wolf Road Albany, New York 12233, attention: Division of Air Resources.

(II) State of North Carolina: North Carolina Department of Environment and Natural Resources, Division of Air Quality, 1641 Mail Service Center, Raleigh, North Carolina 27699–1641.

Forsyth County Environmental Affairs, 537 North Spruce Street, Winston-Salem, North Carolina 27101.

Mecklenburg County Air Quality, 700 N. Tryon St., Suite 205, Charlotte, North Carolina 28202–2236.

Western North Carolina Regional Air Quality Agency, 49 Mount Carmel Road, Asheville, North Carolina 28806.

(JJ) State of North Dakota, Division of Air Quality, North Dakota Department of Health, P.O. Box 5520, Bismarck, ND 58506–5520.

Note: For a table listing Region VIII's NSPS delegation status, see paragraph (c) of this section.

(KK) State of Ohio:

(i) Medina, Summit and Portage Counties; Director, Akron Regional Air Quality Management District, 177 South Broadway, Akron, OH 44308.

(ii) Stark County: Air Pollution Control Division, 420 Market Avenue North, Canton, Ohio 44702–3335.

(iii) Butler, Clermont, Hamilton, and Warren Counties: Air Program Manager, Hamilton County Department of Environmental Services, 1632 Central Parkway, Cincinnati, Ohio 45210.

(iv) Cuyahoga County: Commissioner, Department of Public Health & Welfare, Division of Air Pollution Control, 1925 Saint Clair, Cleveland, Ohio 44114.

(v) Belmont, Carroll, Columbiana, Harrison, Jefferson, and Monroe Counties: Director, North Ohio Valley Air Authority (NOVAA), 814 Adams Street, Steubenville, OH 43952.

(vi) Clark, Darke, Greene, Miami, Montgomery, and Preble Counties: Director, Regional Air Pollution Control Agency (RAPCA) 451 West Third Street, Dayton, Ohio 45402.

(vii) Lucas County and the City of Rossford (in Wood County): Director, Toledo Environmental Services Agency, 26 Main Street, Toledo, OH 43605.

(viii) Adams, Brown, Lawrence, and Scioto Counties; Engineer-Director, Air Division, Portsmouth City Health Department, 740 Second Street, Portsmouth, OH 45662.

(ix) Allen, Ashland, Auglaize, Crawford, Defiance, Erie, Fulton, Hancock, Hardin, Henry, Huron, Marion, Mercer, Ottawa, Paulding, Putnam, Richland, Sandusky, Seneca, Van Wert, Williams, Wood (except City of Rossford), and Wyandot Counties: Ohio Environmental Protection Agency, Northwest District Office, Air Pollution Control, 347 Dunbridge Rd., Bowling Green, Ohio 43402.

(x) Ashtabula, Holmes, Lorain, and Wayne Counties: Ohio Environmental Protection Agency, Northeast District Office, Air Pollution Unit, 2110 East Aurora Road, Twinsburg, OH 44087.

(xi) Athens, Coshocton, Gallia, Guernsey, Hocking, Jackson, Meigs, Morgan, Muskingum, Noble, Perry, Pike, Ross, Tuscarawas, Vinton, and Washington Counties: Ohio Environmental Protection Agency, Southeast District Office, Air Pollution Unit, 2195 Front Street, Logan, OH 43138.

(xii) Champaign, Clinton, Highland, Logan, and Shelby Counties: Ohio Environmental Protection Agency, Southwest District Office, Air Pollution Unit, 401 East Fifth Street, Dayton, Ohio 45402–2911.

(xiii) Delaware, Fairfield, Fayette, Franklin, Knox, Licking, Madison, Morrow, Pickaway, and Union Counties: Ohio Environmental Protection Agency, Central District Office, Air Pollution Control, 3232 Alum Creek Drive, Columbus, Ohio, 43207–3417.

(xiv) Geauga and Lake Counties: Lake County General Health District, Air Pollution Control, 105 Main Street, Painesville, OH 44077.

(xv) Mahoning and Trumbull Counties: Mahoning-Trumbull Air Pollution Control Agency, 9 West Front Street, Youngstown, OH 44503.

(LL) State of Oklahoma, Oklahoma State Department of Health, Air Quality Service, P.O. Box 53551, Oklahoma City, OK 73152.

(i) Oklahoma City and County: Director, Oklahoma City-County Health Department, 921 Northeast 23rd Street, Oklahoma City, OK 73105.

(ii) Tulsa County: Tulsa City-County Health Department, 4616 East Fifteenth Street, Tulsa, OK 74112.

(MM) State of Oregon. (i) Oregon Department of Environmental Quality (ODEQ), 811 SW Sixth Avenue, Portland, OR 97204–1390, http://www.deq.state.or.us.

(ii) Lane Regional Air Pollution Authority (LRAPA), 1010 Main Street, Springfield, Oregon 97477, http://www.lrapa.org.

(NN)(i) City of Philadelphia, Department of Public Health, Air Management Services, 321 University Avenue, Philadelphia, Pennsylvania 19104.

(ii) Commonwealth of Pennsylvania, Department of Environmental Protection, Bureau of Air Quality Control, P.O. Box 8468, 400 Market Street, Harrisburg, Pennsylvania 17105.

(iii) Allegheny County Health Department, Bureau of Environmental Quality, Division of Air Quality, 301 39th Street, Pittsburgh, Pennsylvania 15201.

(OO) State of Rhode Island, Division of Air and Hazardous Materials, Department of Environmental Management, 291 Promenade Street, Providence, RI 02908.

(PP) State of South Carolina: South Carolina Department of Health and Environmental Control, 2600 Bull Street, Columbia, South Carolina 29201.

(QQ) State of South Dakota, Air Quality Program, Department of Environment and Natural Resources, Joe Foss Building, 523 East Capitol, Pierre, SD 57501–3181.

Note: For a table listing Region VIII's NSPS delegation status, see paragragh (c) of this section.

(RR) State of Tennessee: Tennessee Department of Environment and Conservation, Division of Air Pollution Control, 401 Church Street, 9th Floor, L&C Annex, Nashville, Tennessee 37243–1531.

Knox County Air Quality Management—Department of Public Health, 140 Dameron Avenue, Knoxville, TN 37917.

Air Pollution Control Bureau, Metropolitan Health Department, 311 23rd Avenue North, Nashville, TN 37203.

Chattanooga-Hamilton County Air Pollution Control Bureau, 6125 Preservation Drive, Chattanooga, TN 37416.

Memphis-Shelby County Health Department—Air Pollution Control Program, 814 Jefferson Avenue, Memphis, TN 38105.

(SS) State of Texas, Texas Air Control Board, 6330 Highway 290 East, Austin, TX 78723.

(TT) State of Utah, Division of Air Quality, Department of Environmental Quality, P.O. Box 144820, Salt Lake City, UT 84114–4820.

Note: For a table listing Region VIII's NSPS delegation status, see paragraph (c) of this section.

(UU) State of Vermont, Air Pollution Control Division, Agency of Natural Resources, Building 3 South, 103 South Main Street, Waterbury, VT 05676.

(VV) Commonwealth of Virginia, Department of Environmental Quality, 629 East Main Street, Richmond, Virginia 23219.

(WW) State of Washington. (i) Washington State Department of Ecology (Ecology), P.O. Box 47600, Olympia, WA 98504–7600, http://www.ecy.wa.gov/

(ii) Benton Clean Air Authority (BCAA), 650 George Washington Way, Richland, WA 99352–4289, http://www.bcaa.net/

(iii) Northwest Air Pollution Control Authority (NWAPA), 1600 South Second St., Mount Vernon, WA 98273–5202, http://www.nwair.org/

(iv) Olympic Regional Clean Air Agency (ORCAA), 909 Sleater-Kinney Road S.E., Suite 1, Lacey, WA 98503–1128, http://www.orcaa.org/

(v) Puget Sound Clean Air Agency (PSCAA), 110 Union Street, Suite 500, Seattle, WA 98101–2038, http://www.pscleanair.org/

(vi) Spokane County Air Pollution Control Authority (SCAPCA), West 1101 College, Suite 403, Spokane, WA 99201, http://www.scapca.org/

(vii) Southwest Clean Air Agency (SWCAA), 1308 NE. 134th St., Vancouver, WA 98685–2747, http://www.swcleanair.org/

(viii) Yakima Regional Clean Air Authority (YRCAA), 6 South 2nd Street, Suite 1016, Yakima, WA 98901, http://co.yakima.wa.us/cleanair/default.htm

(ix) The following table lists the delegation status of the New Source Performance Standards for the State of Washington. An “X” indicates the subpart has been delegated, subject to all the conditions and limitations set forth in Federal law and the letters granting delegation. Some authorities cannot be delegated and are retained by EPA. Refer to the letters granting delegation for a discussion of these retained authorities. The dates noted at the end of the table indicate the effective dates of Federal rules that have been delegated. Authority for implementing and enforcing any amendments made to these rules after these effective dates are not delegated.

NSPS Subparts Delegated to Washington Air Agencies

Subpart1Washington
Ecology2BCAA3NWAPA4ORCAA5PSCAA6SCAPCA7SWCAA8YRCAA9
A  General ProvisionsXXXXXXXX
B  Adoption and Submittal of State Plans for Designated Facilities
C  Emission Guidelines and Compliance Times
Cb  Large Municipal Waste Combustors that are Constructed on or before September 20, 1994 (Emission Guidelines and Compliance Times)
Cc  Municipal Solid Waste Landfills (Emission Guidelines and Compliance Times)
Cd  Sulfuric Acid Production Units (Emission Guidelines and Compliance Times)
Ce  Hospital/Medical/Infectious Waste Incinerators (Emission Guidelines and Compliance Times)
D  Fossil-Fuel-Fired Steam Generators for which Construction is Commenced after August 17, 1971XXXXXXXX
Da  Electric Utility Steam Generating Units for which Construction is Commenced after September 18, 1978XXXXXXXX
Db  Industrial-Commercial-Institutional Steam Generating UnitsXXXXXXXX
Dc  Small Industrial-Commercial-Institutional Steam Generating UnitsXXXXXXXX
E  IncineratorsXXXXXXXX
Ea  Municipal Waste Combustors for which Construction is Commenced after December 20, 1989 and on or before September 20, 1994XXXXXXXX
Eb—Large Municipal Waste CombustorsXXXX
Ec—Hospital/Medical/Infectious Waste IncineratorsXXXXXX
F  Portland Cement PlantsXXXXXXXX
G  Nitric Acid PlantsXXXXXXXX
H  Sulfuric Acid PlantsXXXXXXXX
I  Hot Mix Asphalt FacilitiesXXXXXXXX
J  Petroleum RefineriesXXXXXXXX
K  Storage Vessels for Petroleum Liquids for which Construction, Reconstruction, or Modification Commenced after June 11, 1973 and prior to May 19, 1978XXXXXXXX
Ka  Storage Vessels for Petroleum Liquids for which Construction, Reconstruction, or Modification Commenced after May 18, 1978 and prior to July 23, 1984XXXXXXXX
Kb  VOC Liquid Storage Vessels (including Petroleum Liquid Storage Vessels) for which Construction, Reconstruction, or Modification Commenced after July 23, 1984XXXXXXXX
L  Secondary Lead SmeltersXXXXXXXX
M  Secondary Brass and Bronze Production PlantsXXXXXXXX
N  Primary Emissions from Basic Oxygen Process Furnaces for which Construction is Commenced after June 11, 1973XXXXXXXX
Na  Secondary Emissions from Basic Oxygen Process Steel-making Facilities for which Construction is Commenced after January 20, 1983XXXXXXXX
O  Sewage Treatment PlantsXXXXXXXX
P  Primary Copper SmeltersXXXXXXXX
Q  Primary Zinc SmeltersXXXXXXXX
R  Primary Lead SmeltersXXXXXXXX
S  Primary Aluminum Reduction Plants10X
T  Phosphate Fertilizer Industry: Wet Process Phosphoric Acid PlantsXXXXXXXX
U  Phosphate Fertilizer Industry: Superphosphoric Acid PlantsXXXXXXXX
V  Phosphate Fertilizer Industry: Diammonium Phosphate PlantsXXXXXXXX
W  Phosphate Fertilizer Industry: Triple Superphosphate PlantsXXXXXXXX
X  Phosphate Fertilizer Industry: Granular Triple Superphosphate Storage FacilitiesXXXXXXXX
Y  Coal Preparation PlantsXXXXXXXX
Z  Ferroalloy Production FacilitiesXXXXXXXX
AA  Steel Plants: Electric Arc Furnaces Constructed after October 21, 1974 and on or before August 17, 1983XXXXXXXX
AAa  Steel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed after August 7, 1983XXXXXXXX
BB  Kraft Pulp Mills11X
CC  Glass Manufacturing PlantsXXXXXXXX
DD  Grain ElevatorsXXXXXXXX
EE  Surface Coating of Metal FurnitureXXXXXXXX
GG  Stationary Gas TurbinesXXXXXXXX
HH  Lime Manufacturing PlantsXXXXXXXX
KK  Lead-Acid Battery Manufacturing PlantsXXXXXXXX
LL  Metallic Mineral Processing PlantsXXXXXXXX
MM  Automobile and Light Duty Truck Surface Coating OperationsXXXXXXXX
NN  Phosphate Rock PlantsXXXXXXXX
PP  Ammonium Sulfate ManufactureXXXXXXXX
QQ  Graphic Arts Industry: Publication Rotogravure PrintingXXXXXXXX
RR  Pressure Sensitive Tape and Label Surface Coating StandardsXXXXXXXX
SS  Industrial Surface Coating: Large AppliancesXXXXXXXX
TT  Metal Coil Surface CoatingXXXXXXXX
UU  Asphalt Processing and Asphalt Roof ManufactureXXXXXXXX
VV  Equipment Leaks of VOC in Synthetic Organic Chemical Manufacturing IndustryXXXXXXXX
WW  Beverage Can Surface Coating IndustryXXXXXXXX
XX  Bulk Gasoline TerminalsXXXXXXXX
AAA  New Residential Wood Heaters
BBB  Rubber Tire Manufacturing IndustryXXXXXXXX
DDD  VOC Emissions from Polymer Manufacturing IndustryXXXXXXXX
FFF  Flexible Vinyl and Urethane Coating and PrintingXXXXXXXX
GGG  Equipment Leaks of VOC in Petroleum RefineriesXXXXXXXX
HHH  Synthetic Fiber Production FacilitiesXXXXXXXX
III  VOC Emissions from Synthetic Organic Chemical Manufacturing Industry Air Oxidation Unit ProcessesXXXXXXXX
JJJ  Petroleum Dry CleanersXXXXXXXX
KKK  Equipment Leaks of VOC from Onshore Natural Gas Processing PlantsXXXXXXXX
LLL  Onshore Natural Gas Processing: SO2EmissionsXXXXXXXX
NNN  VOC Emissions from Synthetic Organic Chemical Manufacturing Industry Distillation OperationsXXXXXXXX
OOO  Nonmetallic Mineral Processing PlantsXXX
PPP  Wool Fiberglass Insulation Manufacturing PlantsXXXXXXXX
QQQ  VOC Emissions from Petroleum Refinery Wastewater SystemsXXXXXXXX
RRR  VOCs from Synthetic Organic Chemical Manufacturing Industry Reactor ProcessesXXXXXXXX
SSS  Magnetic Tape Coating FacilitiesXXXXXXXX
TTT  Industrial Surface Coating: Surface Coating of Plastic Parts for Business MachinesXXXXXXXX
UUU  Calciners and Dryers in Mineral IndustriesXXXXXXXX
VVV  Polymeric Coating of Supporting Substrates FacilitiesXXXXXXXX
WWW  Municipal Solid Waste LandfillsXXXXXXXX
AAAA  Small Municipal Waste Combustion Units for which Construction is Commenced after August 30, 1999 or for which Modification or Reconstruction is Commenced after June 6, 2001XXXXXX
BBBB  Small Municipal Waste Combustion Units Constructed on or before August 30, 1999 (Emission Guidelines and Compliance Times)
CCCC  Commercial and Industrial Solid Waste Incineration Units for which Construction is Commenced after November, 30, 1999 or for which Modification or Reconstruction is Commenced on or after June 1, 2001XXXXXX
DDDD  Commercial and Industrial Solid Waste Incineration Units that Commenced Construction on or before November 30, 1999 (Emission Guidelines and Compliance Times)

1Any authority within any subpart of this part that is not delegable, is not delegated. Please refer to Attachment B to the delegation letters for a listing of the NSPS authorities excluded from delegation.

2Washington State Department of Ecology, for 40 CFR 60.17(h)(1), (h)(2), (h)(3) and 40 CFR part 60, subpart AAAA, as in effect on June 6, 2001; for 40 CFR part 60, subpart CCCC, as in effect on June 1, 2001; and for all other NSPS delegated, as in effect February 20, 2001.

3Benton Clean Air Authority, for 40 CFR 60.17(h)(1), (h)(2), (h)(3) and 40 CFR part 60, subpart AAAA, as in effect on June 6, 2001; for 40 CFR part 60, subpart CCCC, as in effect on June 1, 2001; and for all other NSPS delegated, as in effect February 20, 2001.

4Northwest Air Pollution Authority, for all NSPS delegated, as in effect on July 1, 2000.

5Olympic Regional Clean Air Authority, for 40 CFR 60.17(h)(1), (h)(2), (h)(3) and 40 CFR part 60, subpart AAAA, as in effect on June 6, 2001; for 40 CFR part 60, subpart CCCC, as in effect on June 1, 2001; and for all other NSPS delegated, as in effect February 20, 2001.

6Puget Sound Clean Air Authority, for all NSPS delegated, as in effect on July 1, 2002.

7Spokane County Air Pollution Control Authority, for 40 CFR 60.17(h)(1), (h)(2), (h)(3) and 40 CFR part 60, subpart AAAA, as in effect on June 6, 2001; for 40 CFR part 60, subpart CCCC, as in effect on June 1, 2001; and for all other NSPS delegated, as in effect February 20, 2001.

8Southwest Clean Air Agency, for all NSPS delegated, as in effect on July 1, 2000.

9Yakima Regional Clean Air Authority, for 40 CFR 60.17(h)(1), (h)(2), (h)(3) and 40 CFR part 60, subpart AAAA, as in effect on June 6, 2001; for 40 CFR part 60, subpart CCCC, as in effect on June 1, 2001; and for all other NSPS delegated, as in effect February 20, 2001.

10Subpart S of this part is not delegated to local agencies in Washington because the Washington State Department of Ecology retains sole authority to regulate Primary Aluminum Plants, pursuant to Washington Administrative Code 173–415–010.

11Subpart BB of this part is not delegated to local agencies in Washington because the Washington State Department of Ecology retains sole authority to regulate Kraft and Sulfite Pulping Mills, pursuant to Washington State Administrative Code 173–405–012 and 173–410–012.

(XX) State of West Virginia, Department of Environmental Protection, Division of Air Quality, 601 57th Street, SE., Charleston, West Virginia 25304.

(YY) Wisconsin—Wisconsin Department of Natural Resources, P.O. Box 7921, Madison, WI 53707.

(ZZ) State of Wyoming, Department of Environmental Quality, Air Quality Division, Herschler Building, 122 West 25th Street, Cheyenne, WY 82002.

Note: For a table listing Region VIII's NSPS delegation status, see paragraph (c) of this section.

(AAA) Territory of Guam: Guam Environmental Protection Agency, Post Office Box 2999, Agana, Guam 96910.

Note: For tables listing the delegation status of agencies in Region IX, see paragraph (d) of this section.

(BBB) Commonwealth of Puerto Rico: Commonwealth of Puerto Rico Environmental Quality Board, P.O. Box 11488, Santurce, PR 00910, Attention: Air Quality Area Director (see table under §60.4(b)(FF)(1)).

(CCC) U.S. Virgin Islands: U.S. Virgin Islands Department of Conservation and Cultural Affairs, P.O. Box 578, Charlotte Amalie, St. Thomas, VI 00801.

(DDD) American Samoa Environmental Protection Agency, Pago Pago, American Samoa 96799.

Note: For tables listing the delegation status of agencies in Region IX, see paragraph (d) of this section.

(EEE) Commonwealth of the Northern Mariana Islands, Division of Environmental Quality, P.O. Box 1304, Saipan, MP 96950.

Note: For tables listing the delegation status of agencies in Region IX, see paragraph (d) of this section.

(c) The following is a table indicating the delegation status of New Source Performance Standards for Region VIII.

Delegation Status of New Source Performance Standards

[(NSPS) for Region VIII]

SubpartCOMTNDSDUTWY
A—General Provisions(*)(*)(*)(*)(*)(*)
D—Fossil Fuel Fired Steam Generators(*)(*)(*)(*)(*)(*)
Da—Electric Utility Steam Generators(*)(*)(*)(*)(*)(*)
Db—Industrial-Commercial—Institutional Steam Generators(*)(*)(*)(*)(*)(*)
Dc—Industrial–Commercial–Institutional Steam Generators(*)(*)(*)(*)(*)(*)
E—Incinerators(*)(*)(*)(*)(*)(*)
Ea—Municipal Waste Combustors(*)(*)(*)(*)(*)(*)
Eb—Large Municipal Waste Combustors  (*)  (*)(*)(*)
Ec—Hospital/Medical/Infectious Waste Incinerators(*)(*)(*)(*)(*)(*)
F—Portland Cement Plants(*)(*)(*)(*)(*)(*)
G—Nitric Acid Plants(*)(*)(*)(*)(*)
H—Sulfuric Acid Plants(*)(*)(*)(*)(*)
I—Asphalt Concrete Plants(*)(*)(*)(*)(*)(*)
J—Petroleum Refineries(*)(*)(*)(*)(*)
K—Petroleum Storage Vessels (after 6/11/73 & prior to
  5/19/78)
(*)(*)(*)(*)(*)(*)
Ka—Petroleum Storage Vessels (after 5/18/78 & prior to
  7/23/84)
(*)(*)(*)(*)(*)(*)
Kb—Petroleum Storage Vessels (after 7/23/84)(*)(*)(*)(*)(*)(*)
L—Secondary Lead Smelters(*)(*)(*)(*)
M—Secondary Brass and Bronze Production
Plants(*)(*)(*)(*)
N—Primary Emissions from Basic Oxygen Process Furnaces (after 6/11/73)(*)(*)(*)(*)
Na—Secondary Emissions from Basic Oxygen Process Furnaces (after 1/20/83)(*)(*)(*)(*)
O—Sewage Treatment Plants(*)(*)(*)(*)(*)(*)
P—Primary Copper Smelters(*)(*)(*)(*)
Q—Primary Zinc Smelters(*)(*)(*)(*)
R—Primary Lead Smelters(*)(*)(*)(*)
S—Primary Aluminum Reduction Plants(*)(*)(*)(*)
T—Phosphate Fertilizer Industry: Wet Process Phosphoric Plants(*)(*)(*)(*)(*)
U—Phosphate Fertilizer Industry: Superphosphoric Acid Plants(*)(*)(*)(*)(*)
V—Phosphate Fertilizer Industry: Diammonium Phosphate Plants(*)(*)(*)(*)(*)
W—Phosphate Fertilizer Industry: Triple Superphosphate Plants(*)(*)(*)(*)(*)
X—Phosphate Fertilizer Industry: Granular Triple Superphosphate Storage Facilities(*)(*)(*)(*)(*)
Y—Coal Preparation Plants(*)(*)(*)(*)(*)(*)
Z—Ferroalloy Production Facilities(*)(*)(*)(*)(*)
AA—Steel Plants: Electric Arc Furnaces (10/21/74–8/17/83)(*)(*)(*)(*)(*)
AAa—Steel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels (after 8/7/83)(*)(*)(*)(*)(*)
BB—Kraft Pulp Mills(*)(*)(*)(*)
CC—Glass Manufacturing Plants(*)(*)(*)(*)(*)
DD—Grain Elevator(*)(*)(*)(*)(*)(*)
EE—Surface Coating of Metal Furniture(*)(*)(*)(*)(*)
GG—Stationary Gas Turbines(*)(*)(*)(*)(*)(*)
HH—Lime Manufacturing Plants(*)(*)(*)(*)(*)(*)
KK—Lead-Acid Battery Manufacturing Plants(*)(*)(*)(*)(*)
LL—Metallic Mineral Processing Plants(*)(*)(*)(*)(*)(*)
MM—Automobile & Light Duty Truck Surface Coating Operations(*)(*)(*)(*)(*)
NN—Phosphate Rock Plants(*)(*)(*)(*)(*)
PP—Ammonium Sulfate Manufacturing(*)(*)(*)(*)(*)
QQ—Graphic Arts Industry: Publication Rotogravure Printing(*)(*)(*)(*)(*)(*)
RR—Pressure Sensitive Tape & Label Surface Coating(*)(*)(*)(*)(*)(*)
SS—Industrial Surface Coating: Large Applications(*)(*)(*)(*)(*)
TT—Metal Coil Surface Coating(*)(*)(*)(*)(*)
UU—Asphalt Processing & Asphalt Roofing Manufacture(*)(*)(*)(*)(*)
VV—Synthetic Organic Chemicals Manufacturing: Equipment Leaks of VOC(*)(*)(*)(*)(*)(*)
WW—Beverage Can Surface Coating Industry(*)(*)(*)(*)(*)
XX—Bulk Gasoline Terminals(*)(*)(*)(*)(*)(*)
AAA—Residential Wood Heaters(*)(*)(*)(*)(*)(*)
BBB—Rubber Tires(*)(*)(*)(*)(*)
DDD—VOC Emissions from Polymer Manufacturing Industry(*)(*)(*)(*)(*)
FFF—Flexible Vinyl & Urethane Coating & Printing(*)(*)(*)(*)(*)
GGG—Equipment Leaks of VOC in Petroleum Refineries(*)(*)(*)(*)(*)
HHH—Synthetic Fiber Production(*)(*)(*)(*)(*)
III—VOC Emissions from the Synthetic Organic Chemical Manufacturing Industry Air Oxidation Unit Processes(*)(*)(*)(*)
JJJ—Petroleum Dry Cleaners(*)(*)(*)(*)(*)(*)
KKK—Equipment Leaks of VOC from Onshore Natural Gas Processing Plants(*)(*)(*)(*)(*)
LLL—Onshore Natural Gas Processing: SO2Emissions(*)(*)(*)(*)(*)
NNN—VOC Emissions from the Synthetic Organic Chemical Manufacturing Industry Distillation Operations(*)(*)(*)(*)(*)(*)
OOO—Nonmetallic Mineral Processing Plants(*)(*)(*)(*)(*)(*)
PPP—Wool Fiberglass Insulation Manufacturing Plants(*)(*)(*)(*)(*)
QQQ—VOC Emissions from Petroleum Refinery Wastewater Systems(*)(*)(*)(*)(*)
RRR—VOC Emissions from Synthetic Organic Chemistry Manufacturing Industry (SOCMI) Reactor Processes(*)(*)(*)(*)(*)(*)
SSS—Magnetic Tape Industry(*)(*)(*)(*)(*)(*)
TTT—Plastic Parts for Business Machine Coatings(*)(*)(*)  (*)(*)
UUU—Calciners and Dryers in Mineral Industries(*)(*)(*)(*)(*)(*)
VVV—Polymeric Coating of Supporting Substrates(*)(*)(*)  (*)(*)
WWW—Municipal Solid Waste Landfills(*)(*)(*)(*)(*)(*)
AAAA-Small Municipal Waste Combustors(*)(*)(*)(*)
CCCC-Commercial and Industrial Solid Waste Incineration Units(*)(*)(*)(*)
EEEE—Other Solid Waste Incineration Units for Which Construction is Commenced After December 9, 2004, or for Which Modification or Reconstruction is Commenced On or After June 16, 2006(*)

(*) Indicates approval of State regulation.

(d) The following tables list the specific part 60 standards that have been delegated unchanged to the air pollution control agencies in Region IX. The (X) symbol is used to indicate each standard that has been delegated. The following provisions of this subpart are not delegated: §§60.4(b), 60.8(b), 60.9, 60.11(b), 60.11(e), 60.13(a), 60.13(d)(2), 60.13(g), 60.13(i).

(1) Arizona. The following table identifies delegations for Arizona:

Delegation Status for New Source Performance Standards for Arizona

  SubpartAir Pollution Control Agency
Arizona DEQMaricopa CountyPima
County
Pinal
County
AGeneral ProvisionsXXXX
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971XXXX
DaElectric Utility Steam Generating Units Constructed After September 18, 1978XXXX
DbIndustrial-Commercial-Institutional Steam Generating UnitsXXXX
DcSmall Industrial Steam Generating UnitsXXXX
EIncineratorsXXXX
EaMunicipal Waste Combustors Constructed After December 20, 1989 and On or Before September 20, 1994XXXX
EbMunicipal Waste Combustors Constructed After September 20, 1994XXX
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996XXX
FPortland Cement PlantsXXXX
GNitric Acid PlantsXXXX
HSulfuric Acid PlantXXXX
IHot Mix Asphalt FacilitiesXXXX
JPetroleum RefineriesXXXX
JaPetroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 2007
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978XXXX
KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984XXXX
KbVolatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984XXXX
LSecondary Lead SmeltersXXXX
MSecondary Brass and Bronze Production PlantsXXXX
NPrimary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973XXXX
NaSecondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983XXXX
OSewage Treatment PlantsXXXX
PPrimary Copper SmeltersXXXX
QPrimary Zinc SmeltersXXXX
RPrimary Lead SmeltersXXXX
SPrimary Aluminum Reduction PlantsXXXX
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid PlantsXXXX
UPhosphate Fertilizer Industry: Superphosphoric Acid PlantsXXXX
VPhosphate Fertilizer Industry: Diammonium Phosphate PlantsXXXX
WPhosphate Fertilizer Industry: Triple Superphosphate PlantsXXXX
XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage FacilitiesXXXX
YCoal Preparation PlantsXXXX
ZFerroalloy Production FacilitiesXXXX
AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974 and On or Before August 17, 1983XXXX
AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 7, 1983XXXX
BBKraft Pulp MillsXXXX
CCGlass Manufacturing PlantsXXXX
DDGrain ElevatorsXXXX
EESurface Coating of Metal FurnitureXXXX
FF(Reserved)
GGStationary Gas TurbinesXXXX
HHLime Manufacturing PlantsXXXX
KKLead-Acid Battery Manufacturing PlantsXXXX
LLMetallic Mineral Processing PlantsXXXX
MMAutomobile and Light Duty Trucks Surface Coating OperationsXXXX
NNPhosphate Rock PlantsXXXX
PPAmmonium Sulfate ManufactureXXXX
QQGraphic Arts Industry: Publication Rotogravure PrintingXXXX
RRPressure Sensitive Tape and Label Surface Coating OperationsXXXX
SSIndustrial Surface Coating: Large AppliancesXXXX
TTMetal Coil Surface CoatingXXXX
UUAsphalt Processing and Asphalt Roofing ManufactureXXXX
VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing IndustryXXXX
VVaEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006X
WWBeverage Can Surface Coating IndustryXXXX
XXBulk Gasoline TerminalsXXXX
AAANew Residential Wool HeatersXXXX
BBBRubber Tire Manufacturing IndustryXXXX
CCC(Reserved)
DDDVolatile Organic Compounds (VOC) Emissions from the Polymer Manufacturing IndustryXXXX
EEE(Reserved)
FFFFlexible Vinyl and Urethane Coating and PrintingXXXX
GGGEquipment Leaks of VOC in Petroleum RefineriesXXXX
GGGaEquipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006X
HHHSynthetic Fiber Production FacilitiesXXXX
IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit ProcessesXXXX
JJJPetroleum Dry CleanersXXXX
KKKEquipment Leaks of VOC From Onshore Natural Gas Processing PlantsXXXX
LLLOnshore Natural Gas Processing: SO2EmissionsXXXX
MMM(Reserved)
NNNVolatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation OperationsXXXX
OOONonmetallic Mineral Processing PlantsXXXX
PPPWool Fiberglass Insulation Manufacturing PlantsXXXX
QQQVOC Emissions From Petroleum Refinery Wastewater SystemsXXXX
RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor ProcessesXX
SSSMagnetic Tape Coating FacilitiesXXXX
TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business MachinesXXXX
UUUCalciners and Dryers in Mineral IndustriesXXX
VVVPolymeric Coating of Supporting Substrates FacilitiesXXXX
WWWMunicipal Solid Waste LandfillsXXX
AAAASmall Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which Modification or Reconstruction is Commended After June 6, 2001XXX
CCCCCommercial and Industrial Solid Waste Incineration Units for Which Construction Is Commenced After November 30, 1999 or for Which Modification or Reconstruction Is Commenced on or After June 1, 2001XXX
EEEEOther Solid Waste Incineration Units for Which Construction is Commenced After December 9, 2004, or for Which Modification or Reconstruction is Commenced on or After June 16, 2006XX
IIIIStationary Compression Ignition Internal Combustion EnginesX
JJJJStationary Spark Ignition Internal Combustion Engines
KKKKStationary Combustion TurbinesX
GGGG(Reserved)

(2) California. The following tables identify delegations for each of the local air pollution control agencies of California.

(i) Delegations for Amador County Air Pollution Control District, Antelope Valley Air Pollution Control District, Bay Area Air Quality Management District, and Butte County Air Pollution Control District are shown in the following table:

Delegation Status for New Source Performance Standards for Amador County APCD, Antelope Valley APCD, Bay Area AQMD, and Butte County AQMD

  SubpartAir pollution control agency
Amador County APCDAntelope Valley APCDBay Area AQMDButte County APCD
AGeneral Provisions
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971X
DaElectric Utility Steam Generating Units Constructed After September 18, 1978X
DbIndustrial-Commercial-Institutional Steam Generating UnitsX
DcSmall Industrial Steam Generating UnitsX
EIncineratorsX
EaMunicipal Waste Combustors Constructed After December 20, 1989 and On or Before September 20, 1994X
EbMunicipal Waste Combustors Constructed After September 20, 1994
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996
FPortland Cement PlantsX
GNitric Acid PlantsX
HSulfuric Acid PlantsX
IHot Mix Asphalt FacilitiesX
JPetroleum RefineriesX
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978X
KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984X
KbVolatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984X
LSecondary Lead SmeltersX
MSecondary Brass and Bronze Production PlantsX
NPrimary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973X
NaSecondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983X
OSewage Treatment PlantsX
PPrimary Copper SmeltersX
QPrimary Zinc SmeltersX
RPrimary Lead SmeltersX
SPrimary Aluminum Reduction PlantsX
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid Plants
UPhosphate Fertilizer Industry: Superphosphoric Acid PlantsX
VPhosphate Fertilizer Industry: Diammonium Phosphate PlantsX
WPhosphate Fertilizer Industry: Triple Superphosphate PlantsX
XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage FacilitiesX
YCoal Preparation PlantsX
ZFerroalloy Production FacilitiesX
AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974 and On or Before August 17, 1983X
AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 7, 1983X
BBKraft pulp MillsX
CCGlass Manufacturing PlantsX
DDGrain ElevatorsX
EESurface Coating of Metal FurnitureX
FF(Reserved)
GGStationary Gas TurbinesX
HHLime Manufacturing PlantsX
KKLead-Acid Battery Manufacturing PlantsX
LLMetallic Mineral Processing PlantsX
MMAutomobile and Light Duty Trucks Surface Coating OperationsX
NNPhosphate Rock PlantsX
PPAmmonium Sulfate ManufactureX
QQGraphic Arts Industry: Publication Rotogravure PrintingX
RRPressure Sensitive Tape and Label Surface Coating OperationsX
SSIndustrial Surface Coating: Large AppliancesX
TTMetal Coil Surface CoatingX
UUAsphalt Processing and Asphalt Roofing ManufactureX
VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing IndustryX
WWBeverage Can Surface Coating IndustryX
XXBulk Gasoline Terminals
AAANew Residential Wool HeatersX
BBBRubber Tire Manufacturing IndustryX
CCC(Reserved)
DDDVolatile Organic Compounds (VOC) Emissions from the Polymer Manufacturing IndustryX
EEE(Reserved)
FFFFlexible Vinyl and Urethane Coating and PrintingX
GGGEquipment Leaks of VOC in Petroleum RefineriesX
HHHSynthetic Fiber Production FacilitiesX
IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit Processes
JJJPetroleum Dry CleanersX
KKKEquipment Leaks of VOC From Onshore Natural Gas Processing PlantsX
LLLOnshore Natural Gas Processing: SO2 Emissions
MMM(Reserved)
NNNVolatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation OperationsX
OOONonmetallic Mineral Processing PlantsX
PPPWool Fiberglass Insulation Manufacturing PlantsX
QQQVOC Emissions From Petroleum Refinery Wastewater Systems
RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor Processes
SSSMagnetic Tape Coating FacilitiesX
TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business MachinesX
UUUCalciners and Dryers in Mineral IndustriesX
VVVPolymeric Coating of Supporting Substrates FacilitiesX
WWWMunicipal Solid Waste Landfills

(ii) [Reserved]

(iii) Delegations for Glenn County Air Pollution Control District, Great Basin Unified Air Pollution Control District, Imperial County Air Pollution Control District, and Kern County Air Pollution Control District are shown in the following table:

Delegation Status for New Source Performance Standards for Glenn County APCD, Great Basin Unified APCD, Imperial County APCD, and Kern County APCD

  SubpartAir pollution control agency
Glenn
County APCD
Great Basin Unified APCDImperial County APCDKern County APCD
AGeneral ProvisionsXX
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971XX
DaElectric Utility Steam Generating Units Constructed After September 18, 1978XX
DbIndustrial-Commercial-Institutional Steam Generating UnitsXX
DcSmall Industrial Steam Generating UnitsXX
EIncineratorsXX
EaMunicipal Waste Combustors Constructed After December 20, 1989 and On or Before September 20, 1994X
EbMunicipal Waste Combustors Constructed After September 20, 1994
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996
FPortland Cement PlantsXX
GNitric Acid PlantsXX
HSulfuric Acid PlantsX
IHot Mix Asphalt FacilitiesXX
JPetroleum RefineriesXX
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978XX
KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984XX
KbVolatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984XX
LSecondary Lead SmeltersXX
MSecondary Brass and Bronze Production PlantsXX
NPrimary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973XX
NaSecondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983XX
OSewage Treatment PlantsXX
PPrimary Copper SmeltersXX
QPrimary Zinc SmeltersXX
RPrimary Lead SmeltersXX
SPrimary Aluminum Reduction PlantsXX
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid PlantsXX
UPhosphate Fertilizer Industry: Superphosphoric Acid PlantsXX
VPhosphate Fertilizer Industry: Diammonium Phosphate PlantsXX
WPhosphate Fertilizer Industry: Triple Superphosphate PlantsXX
XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage FacilitiesXX
YCoal Preparation PlantsXX
ZFerroalloy Production FacilitiesXX
AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974 and On or Before August 17, 1983XX
AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 7, 1983XX
BBKraft pulp MillsXX
CCGlass Manufacturing PlantsXX
DDGrain ElevatorsXX
EESurface Coating of Metal FurnitureXX
FF(Reserved)
GGStationary Gas TurbinesXX
HHLime Manufacturing PlantsXX
KKLead-Acid Battery Manufacturing PlantsXX
LLMetallic Mineral Processing PlantsXX
MMAutomobile and Light Duty Trucks Surface Coating OperationsXX
NNPhosphate Rock PlantsXX
PPAmmonium Sulfate ManufactureXX
QQGraphic Arts Industry: Publication Rotogravure PrintingXX
RRPressure Sensitive Tape and Label Surface Coating OperationsXX
SSIndustrial Surface Coating: Large AppliancesXX
TTMetal Coil Surface CoatingXX
UUAsphalt Processing and Asphalt Roofing ManufactureXX
VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing IndustryXX
WWBeverage Can Surface Coating IndustryXX
XXBulk Gasoline Terminals
AAANew Residential Wool HeatersXX
BBBRubber Tire Manufacturing IndustryXX
CCC(Reserved)
DDDVolatile Organic Compounds (VOC) Emissions from the Polymer Manufacturing IndustryXX
EEE(Reserved)
FFFFlexible Vinyl and Urethane Coating and PrintingXX
GGGEquipment Leaks of VOC in Petroleum RefineriesXX
HHHSynthetic Fiber Production FacilitiesXX
IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit ProcessesXX
JJJPetroleum Dry CleanersXX
KKKEquipment Leaks of VOC From Onshore Natural Gas Processing PlantsXX
LLLOnshore Natural Gas Processing: SO2 EmissionsX
MMM(Reserved)
NNNVolatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation OperationsXX
OOONonmetallic Mineral Processing PlantsXX
PPPWool Fiberglass Insulation Manufacturing PlantsXX
QQQVOC Emissions From Petroleum Refinery Wastewater SystemsXX
RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor ProcessesX
SSSMagnetic Tape Coating FacilitiesXX
TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business MachinesXX
UUUCalciners and Dryers in Mineral IndustriesXX
VVVPolymeric Coating of Supporting Substrates FacilitiesXX
WWWMunicipal Solid Waste LandfillsX

(iv) Delegations for Lake County Air Quality Management District, Lassen County Air Pollution Control District, Mariposa County Air Pollution Control District, and Mendocino County Air Pollution Control District are shown in the following table:

Delegation Status for New Source Performance Standards for Lake County Air Quality Management District, Lassen County Air Pollution Control District, Mariposa County Air Pollution Control District, and Mendocino County Air Pollution Control District

  SubpartAir pollution control agency
Lake County AQMDLassen County APCDMariposa County AQMDMendocino County AQMD
AGeneral ProvisionsXX
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971XX
DaElectric Utility Steam Generating Units Constructed After September 18, 1978XX
DbIndustrial-Commercial-Institutional Steam Generating UnitsX
DcSmall Industrial Steam Generating UnitsXX
EIncineratorsXX
EaMunicipal Waste Combustors Constructed After December 20, 1989 and On or Before September 20, 1994XX
EbMunicipal Waste Combustors Constructed After September 20, 1994
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996
FPortland Cement PlantsXX
GNitric Acid PlantsXX
HSulfuric Acid PlantsXX
IHot Mix Asphalt FacilitiesXX
JPetroleum RefineriesXX
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978XX
KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984XX
KbVolatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984XX
LSecondary Lead SmeltersXX
MSecondary Brass and Bronze Production PlantsXX
NPrimary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973XX
NaSecondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983XX
OSewage Treatment PlantsXX
PPrimary Copper SmeltersXX
QPrimary Zinc SmeltersXX
RPrimary Lead SmeltersXX
SPrimary Aluminum Reduction PlantsXX
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid PlantsXX
UPhosphate Fertilizer Industry: Superphosphoric Acid PlantsXX
VPhosphate Fertilizer Industry: Diammonium Phosphate PlantsXX
WPhosphate Fertilizer Industry: Triple Superphosphate PlantsXX
XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage FacilitiesXX
YCoal Preparation PlantsXX
ZFerroalloy Production FacilitiesXX
AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974 and On or Before August 17, 1983XX
AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 7, 1983XX
BBKraft Pulp MillsXX
CCGlass Manufacturing PlantsXX
DDGrain ElevatorsXX
EESurface Coating of Metal FurnitureXX
FF(Reserved)
GGStationary Gas TurbinesXX
HHLime Manufacturing PlantsXX
KKLead-Acid Battery Manufacturing PlantsXX
LLMetallic Mineral Processing PlantsXX
MMAutomobile and Light Duty Trucks Surface Coating OperationsXX
NNPhosphate Rock PlantsXX
PPAmmonium Sulfate ManufactureXX
QQGraphic Arts Industry: Publication Rotogravure PrintingXX
RRPressure Sensitive Tape and Label Surface Coating OperationsXX
SSIndustrial Surface Coating: Large AppliancesXX
TTMetal Coil Surface CoatingXX
UUAsphalt Processing and Asphalt Roofing ManufactureXX
VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing IndustryXX
WWBeverage Can Surface Coating IndustryXX
XXBulk Gasoline Terminals
AAANew Residential Wool HeatersXX
BBBRubber Tire Manufacturing IndustryXX
CCC(Reserved)
DDDVolatile Organic Compounds (VOC) Emissions from the Polymer Manufacturing IndustryXX
EEE(Reserved)
FFFFlexible Vinyl and Urethane Coating and PrintingXX
GGGEquipment Leaks of VOC in Petroleum RefineriesXX
HHHSynthetic Fiber Production FacilitiesXX
IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit ProcessesXX
JJJPetroleum Dry CleanersXX
KKKEquipment Leaks of VOC From Onshore Natural Gas Processing PlantsXX
LLLOnshore Natural Gas Processing: SO2 EmissionsXX
MMM(Reserved)
NNNVolatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation OperationsXX
OOONonmetallic Mineral Processing PlantsXX
PPPWool Fiberglass Insulation Manufacturing PlantsXX
QQQVOC Emissions From Petroleum Refinery Wastewater SystemsXX
RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor ProcessesX
SSSMagnetic Tape Coating FacilitiesXX
TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business Machines
UUUCalciners and Dryers in Mineral IndustriesXX
VVVPolymeric Coating of Supporting Substrates FacilitiesXX
WWWMunicipal Solid Waste LandfillsX

(v) Delegations for Modoc County Air Pollution Control District, Mojave Desert Air Quality Management District, Monterey Bay Unified Air Pollution Control District, and North Coast Unified Air Pollution Control District are shown in the following table:

Delegation Status for New Source Performance Standards for Modoc County Air Pollution Control District, Mojave Desert Air Quality Management District, Monterey Bay Unified Air Pollution Control District, and North Coast Unified Air Pollution Control District

  SubpartAir pollution control agency
Modoc County APCDMojave Desert AQMDMonterey Bay Unified APCDNorth Coast Unified AQMD
AGeneral ProvisionsXXX
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971XXXX
DaElectric Utility Steam Generating Units Constructed After September 18, 1978XXX
DbIndustrial-Commercial-Institutional Steam Generating UnitsXXX
DcSmall Industrial Steam Generating UnitsX
EIncineratorsXXXX
EaMunicipal Waste Combustors Constructed After December 20, 1989 and On or Before September 20, 1994
EbMunicipal Waste Combustors Constructed After September 20, 1994
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996
FPortland Cement PlantsXXXX
GNitric Acid PlantsXXXX
HSulfuric Acid PlantsXXXX
IHot Mix Asphalt FacilitiesXXXX
JPetroleum RefineriesXXXX
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978XXXX
KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984XXX
KbVolatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984XXX
LSecondary Lead SmeltersXXXX
MSecondary Brass and Bronze Production PlantsXXXX
NPrimary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973XXXX
NaSecondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983XXX
OSewage Treatment PlantsXXXX
PPrimary Copper SmeltersXXX
QPrimary Zinc SmeltersXXX
RPrimary Lead SmeltersXXX
SPrimary Aluminum Reduction PlantsXXX
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid PlantsXXXX
UPhosphate Fertilizer Industry: Superphosphoric Acid PlantsXXXX
VPhosphate Fertilizer Industry: Diammonium Phosphate PlantsXXXX
WPhosphate Fertilizer Industry: Triple Superphosphate PlantsXXXX
XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage FacilitiesXXXX
YCoal Preparation PlantsXXXX
ZFerroalloy Production FacilitiesXXX
AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974 and On or Before August 17, 1983XXXX
AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 7, 1983XXX
BBKraft pulp MillsXXX
CCGlass Manufacturing PlantsXXX
DDGrain ElevatorsXXX
EESurface Coating of Metal FurnitureXXX
FF(Reserved)
GGStationary Gas TurbinesXXX
HHLime Manufacturing PlantsXXX
KKLead-Acid Battery Manufacturing PlantsXXX
LLMetallic Mineral Processing PlantsXXX
MMAutomobile and Light Duty Trucks Surface Coating OperationsXXX
NNPhosphate Rock PlantsXXX
PPAmmonium Sulfate ManufactureXXX
QQGraphic Arts Industry: Publication Rotogravure PrintingXXX
RRPressure Sensitive Tape and Label Surface Coating OperationsXXX
SSIndustrial Surface Coating: Large AppliancesXXX
TTMetal Coil Surface CoatingXXX
UUAsphalt Processing and Asphalt Roofing ManufactureXXX
VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing IndustryXXX
WWBeverage Can Surface Coating IndustryXXX
XXBulk Gasoline Terminals
AAANew Residential Wool HeatersXXX
BBBRubber Tire Manufacturing IndustryXXX
CCC(Reserved)
DDDVolatile Organic Compounds (VOC) Emissions from the Polymer manufacturing IndustryXX
EEE(Reserved)
FFFFlexible Vinyl and Urethane Coating and PrintingXXX
GGGEquipment Leaks of VOC in Petroleum RefineriesXXX
HHHSynthetic Fiber Production FacilitiesXXX
IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit Processes
JJJPetroleum Dry CleanersXXX
KKKEquipment Leaks of VOC From Onshore Natural Gas Processing PlantsXXX
LLLOnshore Natural Gas Processing: SO2 EmissionsXXX
MMM(Reserved)
NNNVolatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation OperationsXX
OOONonmetallic Mineral Processing PlantsXXX
PPPWool Fiberglass Insulation Manufacturing PlantsXXX
QQQVOC Emissions From Petroleum Refinery Wastewater SystemsXXX
RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor Processes
SSSMagnetic Tape Coating FacilitiesXXX
TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business MachinesXXX
UUUCalciners and Dryers in Mineral IndustriesX
VVVPolymeric Coating of Supporting Substrates FacilitiesXX
WWWMunicipal Solid Waste Landfills

(vi) Delegations for Northern Sierra Air Quality Management District, Northern Sonoma County Air Pollution Control District, Placer County Air Pollution Control District, and Sacramento Metropolitan Air Quality Management District are shown in the following table:

Delegation Status for New Source Performance Standards for Northern Sierra Air Quality Management District, Northern Sonoma County Air Pollution Control District, Placer County Air Pollution Control District, and Sacramento Metropolitan Air Quality Management District

  SubpartAir pollution control agency
Northern Sierra AQMDNorthern Sonoma County APCDPlacer County APCDSacramento Metropolitan AQMD
AGeneral ProvisionsXX
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971XX
DaElectric Utility Steam Generating Units Constructed After September 18, 1978XX
DbIndustrial-Commercial-Institutional Steam Generating UnitsX
DcSmall Industrial Steam Generating UnitsX
EIncineratorsXX
EaMunicipal Waste Combustors Constructed After December 20, 1989 and On or Before September 20, 1994X
EbMunicipal Waste Combustors Constructed After September 20, 1994X
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996X
FPortland Cement PlantsXX
GNitric Acid PlantsXX
HSulfuric Acid PlantsXX
IHot Mix Asphalt FacilitiesXX
JPetroleum RefineriesXX
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978XX
KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984XX
KbVolatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984X
LSecondary Lead SmeltersXX
MSecondary Brass and Bronze Production PlantsXX
NPrimary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973XX
NaSecondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983X
OSewage Treatment PlantsXX
PPrimary Copper SmeltersXX
QPrimary Zinc SmeltersXX
RPrimary Lead SmeltersXX
SPrimary Aluminum Reduction PlantsXX
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid PlantsXX
UPhosphate Fertilizer Industry: Superphosphoric Acid PlantsXX
VPhosphate Fertilizer Industry: Diammonium Phosphate PlantsXX
WPhosphate Fertilizer Industry: Triple Superphosphate PlantsXX
XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage FacilitiesXX
YCoal Preparation PlantsXX
ZFerroalloy Production FacilitiesXX
AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974 and On or Before August 17, 1983XX
AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 7, 1983X
BBKraft pulp MillsXX
CCGlass Manufacturing PlantsXX
DDGrain ElevatorsXX
EESurface Coating of Metal FurnitureX
FF(Reserved)
GGStationary Gas TurbinesXX
HHLime Manufacturing PlantsXX
KKLead-Acid Battery Manufacturing PlantsX
LLMetallic Mineral Processing PlantsX
MMAutomobile and Light Duty Trucks Surface Coating OperationsXX
NNPhosphate Rock PlantsX
PPAmmonium Sulfate ManufactureXX
QQGraphic Arts Industry: Publication Rotogravure PrintingX
RRPressure Sensitive Tape and Label Surface Coating OperationsX
SSIndustrial Surface Coating: Large AppliancesX
TTMetal Coil Surface CoatingX
UUAsphalt Processing and Asphalt Roofing ManufactureX
VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing IndustryX
WWBeverage Can Surface Coating IndustryX
XXBulk Gasoline Terminals
AAANew Residential Wool HeatersX
BBBRubber Tire Manufacturing IndustryX
CCC(Reserved)
DDDVolatile Organic Compounds (VOC) Emissions from the Polymer Manufacturing IndustryX
EEE(Reserved)
FFFFlexible Vinyl and Urethane Coating and PrintingX
GGGEquipment Leaks of VOC in Petroleum RefineriesX
HHHSynthetic Fiber Production FacilitiesX
IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit ProcessesX
JJJPetroleum Dry CleanersX
KKKEquipment Leaks of VOC From Onshore Natural Gas Processing PlantsX
LLLOnshore Natural Gas Processing: SO2 EmissionsX
MMM(Reserved)
NNNVolatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation OperationsX
OOONonmetallic Mineral Processing PlantsX
PPPWool Fiberglass Insulation Manufacturing PlantsX
QQQVOC Emissions From Petroleum Refinery Wastewater SystemsX
RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor ProcessesX
SSSMagnetic Tape Coating FacilitiesX
TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business MachinesX
UUUCalciners and Dryers in Mineral IndustriesX
VVVPolymeric Coating of Supporting Substrates FacilitiesX
WWWMunicipal Solid Waste LandfillsX

(vii) Delegations for San Diego County Air Pollution Control District, San Joaquin Valley Unified Air Pollution Control District, San Luis Obispo County Air Pollution Control District, and Santa Barbara County Air Pollution Control District are shown in the following table:

Delegation Status for New Source Performance Standards for San Diego County Air Pollution Control District, San Joaquin Valley Unified Air Pollution Control District, San Luis Obispo County Air Pollution Control District, and Santa Barbara County Air Pollution Control District

  SubpartAir Pollution Control Agency
San Diego County APCDSan Joaquin Valley
Unified
APCD
San Luis Obispo County APCDSanta
Barbara
County APCD
AGeneral ProvisionsXXXX
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971XXXX
DaElectric Utility Steam Generating Units Constructed After September 18, 1978XXXX
DbIndustrial-Commercial-Institutional Steam Generating UnitsXXXX
DcSmall Industrial Steam Generating UnitsXXX
EIncineratorsXXXX
EaMunicipal Waste Combustors Constructed After December 20, 1989, and On or Before September 20, 1994XXX
EbMunicipal Waste Combustors Constructed After September 20, 1994XX
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996X
FPortland Cement PlantsXXX
GNitric Acid PlantsXXX
HSulfuric Acid PlantsXXX
IHot Mix Asphalt FacilitiesXXXX
JPetroleum RefineriesXXXX
JaPetroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 2007
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978XXXX
KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984XXXX
KbVolatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984XXXX
LSecondary Lead SmeltersXXXX
MSecondary Brass and Bronze Production PlantsXXXX
NPrimary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973XXX
NaSecondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983XXX
OSewage Treatment PlantsXXXX
PPrimary Copper SmeltersXXX
QPrimary Zinc SmeltersXXX
RPrimary Lead SmeltersXXX
SPrimary Aluminum Reduction PlantsXXX
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid PlantsXXX
UPhosphate Fertilizer Industry: Superphosphoric Acid PlantsXXX
VPhosphate Fertilizer Industry: Diammonium Phosphate PlantsXXX
WPhosphate Fertilizer Industry: Triple Superphosphate PlantsXXX
XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage FacilitiesXXX
YCoal Preparation PlantsXXX
ZFerroalloy Production FacilitiesXXX
AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974, and On or Before August 17, 1983XXX
AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 7, 1983XXX
BBKraft pulp MillsXXX
CCGlass Manufacturing PlantsXXXX
DDGrain ElevatorsXXXX
EESurface Coating of Metal FurnitureXXX
FF(Reserved)
GGStationary Gas TurbinesXXXX
HHLime Manufacturing PlantsXXX
KKLead-Acid Battery Manufacturing PlantsXXX
LLMetallic Mineral Processing PlantsXXX
MMAutomobile and Light Duty Trucks Surface Coating OperationsXXX
NNPhosphate Rock PlantsXXX
PPAmmonium Sulfate ManufactureXXX
QQGraphic Arts Industry: Publication Rotogravure PrintingXXX
RRPressure Sensitive Tape and Label Surface Coating OperationsXXX
SSIndustrial Surface Coating: Large AppliancesXXX
TTMetal Coil Surface CoatingXXX
UUAsphalt Processing and Asphalt Roofing ManufactureXXX
VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing IndustryXXX
VVaEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006
WWBeverage Can Surface Coating IndustryXXX
XXBulk Gasoline Terminals
AAANew Residential Wool HeatersXXXX
BBBRubber Tire Manufacturing IndustryXXX
CCC(Reserved)
DDDVolatile Organic Compounds (VOC) Emissions from the Polymer Manufacturing IndustryXX
EEE(Reserved)
FFFFlexible Vinyl and Urethane Coating and PrintingXXX
GGGEquipment Leaks of VOC in Petroleum RefineriesXXX
GGGaEquipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006
HHHSynthetic Fiber Production FacilitiesXXX
IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit ProcessesXX
JJJPetroleum Dry CleanersXXX
KKKEquipment Leaks of VOC From Onshore Natural Gas Processing PlantsXXX
LLLOnshore Natural Gas Processing: SO2 EmissionsXXX
MMM(Reserved)
NNNVolatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation OperationsXX
OOONonmetallic Mineral Processing PlantsXXXX
PPPWool Fiberglass Insulation Manufacturing PlantsXXX
QQQVOC Emissions From Petroleum Refinery Wastewater SystemsXXX
RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor ProcessesXXX
SSSMagnetic Tape Coating FacilitiesXXX
TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business MachinesXXX
UUUCalciners and Dryers in Mineral IndustriesXXXX
VVVPolymeric Coating of Supporting Substrates FacilitiesXXXX
WWWMunicipal Solid Waste LandfillsXXXX
AAAASmall Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999, or for Which Modification or Reconstruction is Commenced After June 6, 2001X
CCCCCommercial and Industrial Solid Waste Incineration Units for Which Construction Is Commenced After November 30, 1999, or for Which Modification or Reconstruction Is Commenced on or After June 1, 2001X
EEEEOther Solid Waste Incineration Units for Which Construction is Commenced After December 9, 2004, or for Which Modification or Reconstruction is Commenced on or After June 16, 2006X
GGGG(Reserved)
IIIIStationary Compression Ignition Internal Combustion Engines
JJJJStationary Spark Ignition Internal Combustion Engines
KKKKStationary Combustion Turbines

(viii) Delegations for Shasta County Air Quality Management District, Siskiyou County Air Pollution Control District, South Coast Air Quality Management District, and Tehama County Air Pollution Control District are shown in the following table:

Delegation Status for New Source Performance Standards for Shasta County Air Quality Management District, Siskiyou County Air Pollution Control District, South Coast Air Quality Management District, and Tehama County Air Pollution Control District

  SubpartAir Pollution Control Agency
Shasta County AQMDSiskiyou County APCDSouth Coast AQMDTehama County APCD
AGeneral ProvisionsXXX
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971XX
DaElectric Utility Steam Generating Units Constructed After September 18, 1978X
DbIndustrial-Commercial-Institutional Steam Generating UnitsX
DcSmall Industrial Steam Generating UnitsX
EIncineratorsXX
EaMunicipal Waste Combustors Constructed After December 20, 1989 and On or Before September 20, 1994X
EbMunicipal Waste Combustors Constructed After September 20, 1994X
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996X
FPortland Cement PlantsXX
GNitric Acid PlantsXX
HSulfuric Acid PlantsXX
IHot Mix Asphalt FacilitiesXX
JPetroleum RefineriesXX
JaPetroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 2007
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978XX
KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984X
KbVolatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984X
LSecondary Lead SmeltersXX
MSecondary Brass and Bronze Production PlantsXX
NPrimary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973XX
NaSecondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983X
OSewage Treatment PlantsXX
PPrimary Copper SmeltersXX
QPrimary Zinc SmeltersXX
RPrimary Lead SmeltersXX
SPrimary Aluminum Reduction PlantsXX
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid PlantsXX
UPhosphate Fertilizer Industry: Superphosphoric Acid PlantsXX
VPhosphate Fertilizer Industry: Diammonium Phosphate PlantsXX
WPhosphate Fertilizer Industry: Triple Superphosphate PlantsXX
XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage FacilitiesXX
YCoal Preparation PlantsXX
ZFerroalloy Production FacilitiesXX
AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974 and On or Before August 17, 1983XX
AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 7, 1983X
BBKraft pulp MillsXX
CCGlass Manufacturing PlantsX
DDGrain ElevatorsXX
EESurface Coating of Metal FurnitureX
FF(Reserved)
GGStationary Gas TurbinesX
HHLime Manufacturing PlantsXX
KKLead-Acid Battery Manufacturing PlantsX
LLMetallic Mineral Processing PlantsX
MMAutomobile and Light Duty Trucks Surface Coating OperationsX
NNPhosphate Rock PlantsX
PPAmmonium Sulfate ManufactureX
QQGraphic Arts Industry: Publication Rotogravure PrintingX
RRPressure Sensitive Tape and Label Surface Coating OperationsX
SSIndustrial Surface Coating: Large AppliancesX
TTMetal Coil Surface CoatingX
UUAsphalt Processing and Asphalt Roofing ManufactureX
VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing IndustryX
VVaEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006
WWBeverage Can Surface Coating IndustryX
XXBulk Gasoline Terminals
AAANew Residential Wool HeatersXX
BBBRubber Tire Manufacturing IndustryXX
CCC(Reserved)
DDDVolatile Organic Compounds (VOC) Emissions from the Polymer Manufacturing IndustryX
EEE(Reserved)
FFFFlexible Vinyl and Urethane Coating and PrintingX
GGGEquipment Leaks of VOC in Petroleum RefineriesX
GGGaEquipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006
HHHSynthetic Fiber Production FacilitiesX
IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit ProcessesX
JJJPetroleum Dry CleanersX
KKKEquipment Leaks of VOC From Onshore Natural Gas Processing PlantsX
LLLOnshore Natural Gas Processing: SO2EmissionsX
MMM(Reserved)
NNNVolatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation OperationsX
OOONonmetallic Mineral Processing PlantsX
PPPWool Fiberglass Insulation Manufacturing PlantsX
QQQVOC Emissions From Petroleum Refinery Wastewater SystemsXX
RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor ProcessesX
SSSMagnetic Tape Coating FacilitiesXX
TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business MachinesXX
UUUCalciners and Dryers in Mineral IndustriesX
VVVPolymeric Coating of Supporting Substrates FacilitiesX
WWWMunicipal Solid Waste LandfillsX
AAAASmall Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which Modification or Reconstruction is Commended After June 6, 2001XXX
CCCCCommercial and Industrial Solid Waste Incineration Units for Which Construction Is Commenced After November 30, 1999 or for Which Modification or Reconstruction Is Commenced on or After June 1, 2001X
EEEEOther Solid Waste Incineration Units for Which Construction is Commenced After December 9, 2004, or for Which Modification or Reconstruction is Commenced on or After June 16, 2006X
GGGG(Reserved)
IIIIStationary Compression Ignition Internal Combustion EnginesX
JJJJStationary Spark Ignition Internal Combustion Engines
KKKKStationary Combustion TurbinesX

(ix) Delegations for Tuolumne County Air Pollution Control District, Ventura County Air Pollution Control District, and Yolo-Solano Air Quality Management District are shown in the following table:

Delegation Status for New Source Performance Standards for Tuolumne County Air Pollution Control District, Ventura County Air Pollution Control District, and Yolo-Solano Air Quality Management District

  SubpartAir Pollution Control Agency
Tuolumne County APCDVentura County APCDYolo-Solano AQMD
AGeneral ProvisionsXX
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971XX
DaElectric Utility Steam Generating Units Constructed After September 18, 1978X
DbIndustrial-Commercial-Institutional Steam Generating UnitsXX
DcSmall Industrial Steam Generating UnitsX
EIncineratorsX
EaMunicipal Waste Combustors Constructed After December 20, 1989 and On or Before September 20, 1994X
EbMunicipal Waste Combustors Constructed After September 20, 1994X
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996X
FPortland Cement PlantsX
GNitric Acid PlantsX
HSulfuric Acid PlantsX
IHot Mix Asphalt FacilitiesXX
JPetroleum RefineriesXX
JaPetroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 2007
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978XX
KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984X
KbVolatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984X
LSecondary Lead SmeltersX
MSecondary Brass and Bronze Production PlantsX
NPrimary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973X
NaSecondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983X
OSewage Treatment PlantsX
PPrimary Copper SmeltersX
QPrimary Zinc SmeltersX
RPrimary Lead SmeltersX
SPrimary Aluminum Reduction PlantsX
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid PlantsX
UPhosphate Fertilizer Industry: Superphosphoric Acid PlantsX
VPhosphate Fertilizer Industry: Diammonium Phosphate PlantsX
WPhosphate Fertilizer Industry: Triple Superphosphate PlantsX
XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage FacilitiesX
YCoal Preparation PlantsX
ZFerroalloy Production FacilitiesX
AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974 and On or Before August 17, 1983XX
AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 7, 1983X
BBKraft pulp MillsX
CCGlass Manufacturing PlantsX
DDGrain ElevatorsX
EESurface Coating of Metal FurnitureX
FF(Reserved)
GGStationary Gas TurbinesX
HHLime Manufacturing PlantsX
KKLead-Acid Battery Manufacturing PlantsX
LLMetallic Mineral Processing PlantsX
MMAutomobile and Light Duty Trucks Surface Coating OperationsX
NNPhosphate Rock PlantsX
PPAmmonium Sulfate ManufactureX
QQGraphic Arts Industry: Publication Rotogravure PrintingX
RRPressure Sensitive Tape and Label Surface Coating OperationsX
SSIndustrial Surface Coating: Large AppliancesX
TTMetal Coil Surface CoatingX
UUAsphalt Processing and Asphalt Roofing ManufactureX
VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing IndustryX
VVaEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006
WWBeverage Can Surface Coating IndustryX
XXBulk Gasoline Terminals
AAANew Residential Wood HeatersX
BBBRubber Tire Manufacturing IndustryX
CCC(Reserved)
DDDVolatile Organic Compounds (VOC) Emissions from the Polymer Manufacturing IndustryX
EEE(Reserved)
FFFFlexible Vinyl and Urethane Coating and PrintingX
GGGEquipment Leaks of VOC in Petroleum RefineriesX
GGGaEquipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006
HHHSynthetic Fiber Production FacilitiesX
IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit ProcessesX
JJJPetroleum Dry CleanersX
KKKEquipment Leaks of VOC From Onshore Natural Gas Processing PlantsX
LLLOnshore Natural Gas Processing: SO2 EmissionsX
MMM(Reserved)
NNNVolatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation OperationsX
OOONonmetallic Mineral Processing PlantsXX
PPPWool Fiberglass Insulation Manufacturing PlantsX
QQQVOC Emissions From Petroleum Refinery Wastewater SystemsX
RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor ProcessesX
SSSMagnetic Tape Coating FacilitiesX
TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business MachinesX
UUUCalciners and Dryers in Mineral IndustriesX
VVVPolymeric Coating of Supporting Substrates FacilitiesX
WWWMunicipal Solid Waste LandfillsXX
AAAASmall Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which Modification or Reconstruction is Commenced After June 6, 2001X
CCCCCommercial and Industrial Solid Waste Incineration Units for Which Construction Is Commenced After November 30, 1999 or for Which Modification or Reconstruction Is Commenced on or After June 1, 2001X
EEEEOther Solid Waste Incineration Units for Which Construction is Commenced After December 9, 2004, or for Which Modification or Reconstruction is Commenced on or After June 16, 2006
GGGG(Reserved)
IIIIStationary Compression Ignition Internal Combustion Engines
JJJJStationary Spark Ignition Internal Combustion Engines
KKKKStationary Combustion Turbines

(3) Hawaii. The following table identifies delegations for Hawaii:

Delegation Status for New Source Performance Standards for Hawaii:

Delegation Status for New Source Performance Standards for Hawaii

  SubpartHawaii
AGeneral ProvisionsX
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971X
DaElectric Utility Steam Generating Units Constructed After September 18, 1978X
DbIndustrial-Commercial-Institutional Steam Generating UnitsX
DcSmall Industrial Steam Generating UnitsX
EIncineratorsX
EaMunicipal Waste Combustors Constructed After December 20, 1989 and On or Before September 20, 1994X
EbMunicipal Waste Combustors Constructed After September 20, 1994X
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996X
FPortland Cement PlantsX
GNitric Acid Plants
HSulfuric Acid Plants
IHot Mix Asphalt FacilitiesX
JPetroleum RefineriesX
JaPetroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 2007
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978X
KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984X
KbVolatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984X
LSecondary Lead Smelters
MSecondary Brass and Bronze Production Plants
NPrimary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973
NaSecondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983
OSewage Treatment PlantsX
PPrimary Copper Smelters
QPrimary Zinc Smelters
RPrimary Lead Smelters
SPrimary Aluminum Reduction Plants
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid Plants
UPhosphate Fertilizer Industry: Superphosphoric Acid Plants
VPhosphate Fertilizer Industry: Diammonium Phosphate Plants
WPhosphate Fertilizer Industry: Triple Superphosphate Plants
XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage Facilities
YCoal Preparation PlantsX
ZFerroalloy Production Facilities
AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974 and On or Before August 17, 1983X
AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 7, 1983X
BBKraft pulp Mills
CCGlass Manufacturing Plants
DDGrain Elevators
EESurface Coating of Metal Furniture
FF(Reserved)
GGStationary Gas TurbinesX
HHLime Manufacturing Plants
KKLead-Acid Battery Manufacturing Plants
LLMetallic Mineral Processing Plants
MMAutomobile and Light Duty Trucks Surface Coating Operations
NNPhosphate Rock Plants
PPAmmonium Sulfate Manufacture
QQGraphic Arts Industry: Publication Rotogravure Printing
RRPressure Sensitive Tape and Label Surface Coating Operations
SSIndustrial Surface Coating: Large Appliances
TTMetal Coil Surface Coating
UUAsphalt Processing and Asphalt Roofing Manufacture
VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing IndustryX
VVaEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006
WWBeverage Can Surface Coating IndustryX
XXBulk Gasoline TerminalsX
AAANew Residential Wool Heaters
BBBRubber Tire Manufacturing Industry
CCC(Reserved)
DDDVolatile Organic Compounds (VOC) Emissions from the Polymer Manufacturing Industry
EEE(Reserved)
FFFFlexible Vinyl and Urethane Coating and Printing
GGGEquipment Leaks of VOC in Petroleum RefineriesX
GGGaEquipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006
HHHSynthetic Fiber Production Facilities
IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit Processes
JJJPetroleum Dry CleanersX
KKKEquipment Leaks of VOC From Onshore Natural Gas Processing Plants
LLLOnshore Natural Gas Processing: SO2 Emissions
MMM(Reserved)
NNNVolatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation OperationsX
OOONonmetallic Mineral Processing PlantsX
PPPWool Fiberglass Insulation Manufacturing Plants
QQQVOC Emissions From Petroleum Refinery WastewaterX
RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor Processes
SSSMagnetic Tape Coating Facilities
TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business Machines
UUUCalciners and Dryers in Mineral IndustriesX
VVVPolymeric Coating of Supporting Substrates FacilitiesX
WWWMunicipal Solid Waste LandfillsX
AAAASmall Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which Modification or Reconstruction is Commenced After June 6, 2001X
CCCCCommercial and Industrial Solid Waste Incineration Units for Which Construction Is Commenced After November 30, 1999 or for Which Modification or Reconstruction Is Commenced on or After June 1, 2001X
EEEEOther Solid Waste Incineration Units for Which Construction is Commenced After December 9, 2004, or for Which Modification or Reconstruction is Commenced on or After June 16, 2006
GGGG(Reserved)
IIIIStationary Compression Ignition Internal Combustion Engines
JJJJStationary Spark Ignition Internal Combustion Engines
KKKKStationary Combustion Turbines

(4) Nevada. The following table identifies delegations for Nevada:

Delegation Status for New Source Performance Standards for Nevada

  SubpartAir Pollution Control Agency
Nevada
DEP
Clark
County
Washoe County
AGeneral ProvisionsXXX
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971XXX
DaElectric Utility Steam Generating Units Constructed After September 18, 1978X
DbIndustrial-Commercial-Institutional Steam Generating UnitsX
DcSmall Industrial Steam Generating UnitsX
EIncineratorsXXX
EaMunicipal Waste Combustors Constructed After December 20, 1989 and On or Before September 20, 1994X
EbMunicipal Waste Combustors Constructed After September 20, 1994X
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996X
FPortland Cement PlantsXXX
GNitric Acid PlantsXX
HSulfuric Acid PlantsXX
IHot Mix Asphalt FacilitiesXXX
JPetroleum RefineriesXX
JaPetroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 2007
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978XXX
KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984XXX
KbVolatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984X
LSecondary Lead SmeltersXXX
MSecondary Brass and Bronze Production PlantsXX
NPrimary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973XX
NaSecondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983X
OSewage Treatment PlantsXXX
PPrimary Copper SmeltersXXX
QPrimary Zinc SmeltersXXX
RPrimary Lead SmeltersXXX
SPrimary Aluminum Reduction PlantsXX
TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid PlantsXX
UPhosphate Fertilizer Industry: Superphosphoric Acid PlantsXX
VPhosphate Fertilizer Industry: Diammonium Phosphate PlantsXX
WPhosphate Fertilizer Industry: Triple Superphosphate PlantsXX
XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage FacilitiesXX
YCoal Preparation PlantsXXX
ZFerroalloy Production FacilitiesXX
AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974 and On or Before August 17, 1983XX
AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 7, 1983X
BBKraft pulp MillsXX
CCGlass Manufacturing PlantsXX
DDGrain ElevatorsXXX
EESurface Coating of Metal FurnitureXXX
FF(Reserved)
GGStationary Gas TurbinesXXX
HHLime Manufacturing PlantsXXX
KKLead-Acid Battery Manufacturing PlantsXXX
LLMetallic Mineral Processing PlantsXXX
MMAutomobile and Light Duty Trucks Surface Coating OperationsXXX
NNPhosphate Rock PlantsXXX
PPAmmonium Sulfate ManufactureXX
QQGraphic Arts Industry: Publication Rotogravure PrintingXXX
RRPressure Sensitive Tape and Label Surface Coating OperationsXX
SSIndustrial Surface Coating: Large AppliancesXXX
TTMetal Coil Surface CoatingXXX
UUAsphalt Processing and Asphalt Roofing ManufactureXXX
VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing IndustryXXX
VVaEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006
WWBeverage Can Surface Coating IndustryXX
XXBulk Gasoline TerminalsXX
AAANew Residential Wool Heaters
BBBRubber Tire Manufacturing IndustryX
CCC(Reserved)
DDDVolatile Organic Compounds (VOC) Emissions from the Polymer Manufacturing IndustryX
EEE(Reserved)
FFFFlexible Vinyl and Urethane Coating and PrintingXX
GGGEquipment Leaks of VOC in Petroleum RefineriesXX
GGGaEquipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006
HHHSynthetic Fiber Production FacilitiesXX
IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit ProcessesX
JJJPetroleum Dry CleanersXXX
KKKEquipment Leaks of VOC From Onshore Natural Gas Processing PlantsX
LLLOnshore Natural Gas Processing: SO2 EmissionsX
MMM(Reserved)
NNNVolatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation OperationsX
OOONonmetallic Mineral Processing PlantsXX
PPPWool Fiberglass Insulation Manufacturing PlantsXX
QQQVOC Emissions From Petroleum Refinery Wastewater SystemsX
RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor ProcessesX
SSSMagnetic Tape Coating FacilitiesX
TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business MachinesX
UUUCalciners and Dryers in Mineral IndustriesX
VVVPolymeric Coating of Supporting Substrates FacilitiesX
WWWMunicipal Solid Waste LandfillsX
AAAASmall Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which Modification or Reconstruction is Commended After June 6, 2001X
CCCCCommercial and Industrial Solid Waste Incineration Units for Which Construction Is Commenced After November 30, 1999 or for Which Modification or Reconstruction Is Commenced on or After June 1, 2001X
EEEEOther Solid Waste Incineration Units for Which Construction is Commenced After December 9, 2004, or for Which Modification or Reconstruction is Commenced on or After June 16, 2006X
GGGG(Reserved)
IIIIStationary Compression Ignition Internal Combustion EnginesX
JJJJStationary Spark Ignition Internal Combustion EnginesX
KKKKStationary Combustion TurbinesX

(5) Guam. The following table identifies delegations as of June 15, 2001:

Delegation Status for New Source Performance Standards for Guam

  SubpartGuam
AGeneral ProvisionsX
DFossil-Fuel Fired Steam Generators Constructed After August 17, 1971X
DaElectric Utility Steam Generating Units Constructed After September 18, 1978
DbIndustrial-Commercial-Institutional Steam Generating Units
DcSmall Industrial Steam Generating Units
EIncinerators
EaMunicipal Waste Combustors Constructed After December 20, 1989 and On or Before September 20, 1994
EbMunicipal Waste Combustors Constructed After September 20, 1994
EcHospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996
FPortland Cement PlantsX
GNitric Acid Plants
HSulfuric Acid Plants
IHot Mix Asphalt FacilitiesX
JPetroleum RefineriesX
KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978X

(e) The following lists the specific part 60 standards that have been delegated unchanged to the air pollution control agencies in Region 6.

(1) New Mexico. The New Mexico Environment Department has been delegated all part 60 standards promulgated by EPA, except subpart AAA—Standards of Performance for New Residential Wood Heaters, as amended in theFederal Registerthrough September 1, 2002.

(2) Louisiana . The Louisiana Department of Environmental Quality has been delegated all part 60 standards promulgated by EPA, except subpart AAA—Standards of Performance for New Residential Wood Heaters, as amended in theFederal Registerthrough July 1, 2002.

(3) Albuquerque-Bernalillo County Air Quality Control Board. The Albuquerque-Bernalillo County Air Quality Control Board has been delegated all part 60 standards promulgated by EPA, except Subpart AAA—Standards of Performance for New Residential Wood Heaters; Subpart WWW—Standards of Performance for Municipal Solid Waste Landfills; Subpart Cc—Emissions Guidelines and Compliance Times for Municipal Solid Waste Landfills, as amended in theFederal Registerthrough July 1, 2004.

[40 FR 18169, Apr. 25, 1975]

Editorial Note:   ForFederal Registercitations affecting §60.4 see the List of CFR Sections Affected which appears in the Finding Aids section of the printed volume and on GPO Access.

§ 60.5   Determination of construction or modification.

(a) When requested to do so by an owner or operator, the Administrator will make a determination of whether action taken or intended to be taken by such owner or operator constitutes construction (including reconstruction) or modification or the commencement thereof within the meaning of this part.

(b) The Administrator will respond to any request for a determination under paragraph (a) of this section within 30 days of receipt of such request.

[40 FR 58418, Dec. 16, 1975]

§ 60.6   Review of plans.

(a) When requested to do so by an owner or operator, the Administrator will review plans for construction or modification for the purpose of providing technical advice to the owner or operator.

(b)(1) A separate request shall be submitted for each construction or modification project.

(2) Each request shall identify the location of such project, and be accompanied by technical information describing the proposed nature, size, design, and method of operation of each affected facility involved in such project, including information on any equipment to be used for measurement or control of emissions.

(c) Neither a request for plans review nor advice furnished by the Administrator in response to such request shall (1) relieve an owner or operator of legal responsibility for compliance with any provision of this part or of any applicable State or local requirement, or (2) prevent the Administrator from implementing or enforcing any provision of this part or taking any other action authorized by the Act.

[36 FR 24877, Dec. 23, 1971, as amended at 39 FR 9314, Mar. 8, 1974]

§ 60.7   Notification and record keeping.

(a) Any owner or operator subject to the provisions of this part shall furnish the Administrator written notification or, if acceptable to both the Administrator and the owner or operator of a source, electronic notification, as follows:

(1) A notification of the date construction (or reconstruction as defined under §60.15) of an affected facility is commenced postmarked no later than 30 days after such date. This requirement shall not apply in the case of mass-produced facilities which are purchased in completed form.

(2) [Reserved]

(3) A notification of the actual date of initial startup of an affected facility postmarked within 15 days after such date.

(4) A notification of any physical or operational change to an existing facility which may increase the emission rate of any air pollutant to which a standard applies, unless that change is specifically exempted under an applicable subpart or in §60.14(e). This notice shall be postmarked 60 days or as soon as practicable before the change is commenced and shall include information describing the precise nature of the change, present and proposed emission control systems, productive capacity of the facility before and after the change, and the expected completion date of the change. The Administrator may request additional relevant information subsequent to this notice.

(5) A notification of the date upon which demonstration of the continuous monitoring system performance commences in accordance with §60.13(c). Notification shall be postmarked not less than 30 days prior to such date.

(6) A notification of the anticipated date for conducting the opacity observations required by §60.11(e)(1) of this part. The notification shall also include, if appropriate, a request for the Administrator to provide a visible emissions reader during a performance test. The notification shall be postmarked not less than 30 days prior to such date.

(7) A notification that continuous opacity monitoring system data results will be used to determine compliance with the applicable opacity standard during a performance test required by §60.8 in lieu of Method 9 observation data as allowed by §60.11(e)(5) of this part. This notification shall be postmarked not less than 30 days prior to the date of the performance test.

(b) Any owner or operator subject to the provisions of this part shall maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility; any malfunction of the air pollution control equipment; or any periods during which a continuous monitoring system or monitoring device is inoperative.

(c) Each owner or operator required to install a continuous monitoring device shall submit excess emissions and monitoring systems performance report (excess emissions are defined in applicable subparts) and-or summary report form (see paragraph (d) of this section) to the Administrator semiannually, except when: more frequent reporting is specifically required by an applicable subpart; or the Administrator, on a case-by-case basis, determines that more frequent reporting is necessary to accurately assess the compliance status of the source. All reports shall be postmarked by the 30th day following the end of each six-month period. Written reports of excess emissions shall include the following information:

(1) The magnitude of excess emissions computed in accordance with §60.13(h), any conversion factor(s) used, and the date and time of commencement and completion of each time period of excess emissions. The process operating time during the reporting period.

(2) Specific identification of each period of excess emissions that occurs during startups, shutdowns, and malfunctions of the affected facility. The nature and cause of any malfunction (if known), the corrective action taken or preventative measures adopted.

(3) The date and time identifying each period during which the continuous monitoring system was inoperative except for zero and span checks and the nature of the system repairs or adjustments.

(4) When no excess emissions have occurred or the continuous monitoring system(s) have not been inoperative, repaired, or adjusted, such information shall be stated in the report.

(d) The summary report form shall contain the information and be in the format shown in figure 1 unless otherwise specified by the Administrator. One summary report form shall be submitted for each pollutant monitored at each affected facility.

(1) If the total duration of excess emissions for the reporting period is less than 1 percent of the total operating time for the reporting period and CMS downtime for the reporting period is less than 5 percent of the total operating time for the reporting period, only the summary report form shall be submitted and the excess emission report described in §60.7(c) need not be submitted unless requested by the Administrator.

(2) If the total duration of excess emissions for the reporting period is 1 percent or greater of the total operating time for the reporting period or the total CMS downtime for the reporting period is 5 percent or greater of the total operating time for the reporting period, the summary report form and the excess emission report described in §60.7(c) shall both be submitted.

Figure 1—Summary Report—Gaseous and Opacity Excess Emission and Monitoring System Performance

Pollutant (Circle One—SO2/NOX/TRS/H2S/CO/Opacity)

Reporting period dates: From _____ to _____

Company:

Emission Limitation____________________

Address:

Monitor Manufacturer and Model No.____________________
Date of Latest CMS Certification or Audit____________________

Process Unit(s) Description:

Total source operating time in reporting period1 ____________________
Emission data summary1  CMS performance summary1  
1. Duration of excess emissions in reporting period due to:1. CMS downtime in reporting period due to:
a. Startup/shutdown  a. Monitor equipment malfunctions
b. Control equipment problems  b. Non-Monitor equipment malfunctions
c. Process problems  c. Quality assurance calibration
d. Other known causes  d. Other known causes
e. Unknown causes  e. Unknown causes
2. Total duration of excess emission2. Total CMS Downtime
3. Total duration of excess emissions × (100) [Total source operating time]%23. [Total CMS Downtime] × (100) [Total source operating time]%2

1For opacity, record all times in minutes. For gases, record all times in hours.

2For the reporting period: If the total duration of excess emissions is 1 percent or greater of the total operating time or the total CMS downtime is 5 percent or greater of the total operating time, both the summary report form and the excess emission report described in §60.7(c) shall be submitted.

On a separate page, describe any changes since last quarter in CMS, process or controls. I certify that the information contained in this report is true, accurate, and complete.

____________________

Name

____________________

Signature

____________________

Title

____________________

Date

(e)(1) Notwithstanding the frequency of reporting requirements specified in paragraph (c) of this section, an owner or operator who is required by an applicable subpart to submit excess emissions and monitoring systems performance reports (and summary reports) on a quarterly (or more frequent) basis may reduce the frequency of reporting for that standard to semiannual if the following conditions are met:

(i) For 1 full year (e.g., 4 quarterly or 12 monthly reporting periods) the affected facility's excess emissions and monitoring systems reports submitted to comply with a standard under this part continually demonstrate that the facility is in compliance with the applicable standard;

(ii) The owner or operator continues to comply with all recordkeeping and monitoring requirements specified in this subpart and the applicable standard; and

(iii) The Administrator does not object to a reduced frequency of reporting for the affected facility, as provided in paragraph (e)(2) of this section.

(2) The frequency of reporting of excess emissions and monitoring systems performance (and summary) reports may be reduced only after the owner or operator notifies the Administrator in writing of his or her intention to make such a change and the Administrator does not object to the intended change. In deciding whether to approve a reduced frequency of reporting, the Administrator may review information concerning the source's entire previous performance history during the required recordkeeping period prior to the intended change, including performance test results, monitoring data, and evaluations of an owner or operator's conformance with operation and maintenance requirements. Such information may be used by the Administrator to make a judgment about the source's potential for noncompliance in the future. If the Administrator disapproves the owner or operator's request to reduce the frequency of reporting, the Administrator will notify the owner or operator in writing within 45 days after receiving notice of the owner or operator's intention. The notification from the Administrator to the owner or operator will specify the grounds on which the disapproval is based. In the absence of a notice of disapproval within 45 days, approval is automatically granted.

(3) As soon as monitoring data indicate that the affected facility is not in compliance with any emission limitation or operating parameter specified in the applicable standard, the frequency of reporting shall revert to the frequency specified in the applicable standard, and the owner or operator shall submit an excess emissions and monitoring systems performance report (and summary report, if required) at the next appropriate reporting period following the noncomplying event. After demonstrating compliance with the applicable standard for another full year, the owner or operator may again request approval from the Administrator to reduce the frequency of reporting for that standard as provided for in paragraphs (e)(1) and (e)(2) of this section.

(f) Any owner or operator subject to the provisions of this part shall maintain a file of all measurements, including continuous monitoring system, monitoring device, and performance testing measurements; all continuous monitoring system performance evaluations; all continuous monitoring system or monitoring device calibration checks; adjustments and maintenance performed on these systems or devices; and all other information required by this part recorded in a permanent form suitable for inspection. The file shall be retained for at least two years following the date of such measurements, maintenance, reports, and records, except as follows:

(1) This paragraph applies to owners or operators required to install a continuous emissions monitoring system (CEMS) where the CEMS installed is automated, and where the calculated data averages do not exclude periods of CEMS breakdown or malfunction. An automated CEMS records and reduces the measured data to the form of the pollutant emission standard through the use of a computerized data acquisition system. In lieu of maintaining a file of all CEMS subhourly measurements as required under paragraph (f) of this section, the owner or operator shall retain the most recent consecutive three averaging periods of subhourly measurements and a file that contains a hard copy of the data acquisition system algorithm used to reduce the measured data into the reportable form of the standard.

(2) This paragraph applies to owners or operators required to install a CEMS where the measured data is manually reduced to obtain the reportable form of the standard, and where the calculated data averages do not exclude periods of CEMS breakdown or malfunction. In lieu of maintaining a file of all CEMS subhourly measurements as required under paragraph (f) of this section, the owner or operator shall retain all subhourly measurements for the most recent reporting period. The subhourly measurements shall be retained for 120 days from the date of the most recent summary or excess emission report submitted to the Administrator.

(3) The Administrator or delegated authority, upon notification to the source, may require the owner or operator to maintain all measurements as required by paragraph (f) of this section, if the Administrator or the delegated authority determines these records are required to more accurately assess the compliance status of the affected source.

(g) If notification substantially similar to that in paragraph (a) of this section is required by any other State or local agency, sending the Administrator a copy of that notification will satisfy the requirements of paragraph (a) of this section.

(h) Individual subparts of this part may include specific provisions which clarify or make inapplicable the provisions set forth in this section.

[36 FR 24877, Dec. 28, 1971, as amended at 40 FR 46254, Oct. 6, 1975; 40 FR 58418, Dec. 16, 1975; 45 FR 5617, Jan. 23, 1980; 48 FR 48335, Oct. 18, 1983; 50 FR 53113, Dec. 27, 1985; 52 FR 9781, Mar. 26, 1987; 55 FR 51382, Dec. 13, 1990; 59 FR 12428, Mar. 16, 1994; 59 FR 47265, Sep. 15, 1994; 64 FR 7463, Feb. 12, 1999]

§ 60.8   Performance tests.

(a) Except as specified in paragraphs (a)(1),(a)(2), (a)(3), and (a)(4) of this section, within 60 days after achieving the maximum production rate at which the affected facility will be operated, but not later than 180 days after initial startup of such facility, or at such other times specified by this part, and at such other times as may be required by the Administrator under section 114 of the Act, the owner or operator of such facility shall conduct performance test(s) and furnish the Administrator a written report of the results of such performance test(s).

(1) If a force majeure is about to occur, occurs, or has occurred for which the affected owner or operator intends to assert a claim of force majeure, the owner or operator shall notify the Administrator, in writing as soon as practicable following the date the owner or operator first knew, or through due diligence should have known that the event may cause or caused a delay in testing beyond the regulatory deadline, but the notification must occur before the performance test deadline unless the initial force majeure or a subsequent force majeure event delays the notice, and in such cases, the notification shall occur as soon as practicable.

(2) The owner or operator shall provide to the Administrator a written description of the force majeure event and a rationale for attributing the delay in testing beyond the regulatory deadline to the force majeure; describe the measures taken or to be taken to minimize the delay; and identify a date by which the owner or operator proposes to conduct the performance test. The performance test shall be conducted as soon as practicable after the force majeure occurs.

(3) The decision as to whether or not to grant an extension to the performance test deadline is solely within the discretion of the Administrator. The Administrator will notify the owner or operator in writing of approval or disapproval of the request for an extension as soon as practicable.

(4) Until an extension of the performance test deadline has been approved by the Administrator under paragraphs (a)(1), (2), and (3) of this section, the owner or operator of the affected facility remains strictly subject to the requirements of this part.

(b) Performance tests shall be conducted and data reduced in accordance with the test methods and procedures contained in each applicable subpart unless the Administrator (1) specifies or approves, in specific cases, the use of a reference method with minor changes in methodology, (2) approves the use of an equivalent method, (3) approves the use of an alternative method the results of which he has determined to be adequate for indicating whether a specific source is in compliance, (4) waives the requirement for performance tests because the owner or operator of a source has demonstrated by other means to the Administrator's satisfaction that the affected facility is in compliance with the standard, or (5) approves shorter sampling times and smaller sample volumes when necessitated by process variables or other factors. Nothing in this paragraph shall be construed to abrogate the Administrator's authority to require testing under section 114 of the Act.

(c) Performance tests shall be conducted under such conditions as the Administrator shall specify to the plant operator based on representative performance of the affected facility. The owner or operator shall make available to the Administrator such records as may be necessary to determine the conditions of the performance tests. Operations during periods of startup, shutdown, and malfunction shall not constitute representative conditions for the purpose of a performance test nor shall emissions in excess of the level of the applicable emission limit during periods of startup, shutdown, and malfunction be considered a violation of the applicable emission limit unless otherwise specified in the applicable standard.

(d) The owner or operator of an affected facility shall provide the Administrator at least 30 days prior notice of any performance test, except as specified under other subparts, to afford the Administrator the opportunity to have an observer present. If after 30 days notice for an initially scheduled performance test, there is a delay (due to operational problems, etc.) in conducting the scheduled performance test, the owner or operator of an affected facility shall notify the Administrator (or delegated State or local agency) as soon as possible of any delay in the original test date, either by providing at least 7 days prior notice of the rescheduled date of the performance test, or by arranging a rescheduled date with the Administrator (or delegated State or local agency) by mutual agreement.

(e) The owner or operator of an affected facility shall provide, or cause to be provided, performance testing facilities as follows:

(1) Sampling ports adequate for test methods applicable to such facility. This includes (i) constructing the air pollution control system such that volumetric flow rates and pollutant emission rates can be accurately determined by applicable test methods and procedures and (ii) providing a stack or duct free of cyclonic flow during performance tests, as demonstrated by applicable test methods and procedures.

(2) Safe sampling platform(s).

(3) Safe access to sampling platform(s).

(4) Utilities for sampling and testing equipment.

(f) Unless otherwise specified in the applicable subpart, each performance test shall consist of three separate runs using the applicable test method. Each run shall be conducted for the time and under the conditions specified in the applicable standard. For the purpose of determining compliance with an applicable standard, the arithmetic means of results of the three runs shall apply. In the event that a sample is accidentally lost or conditions occur in which one of the three runs must be discontinued because of forced shutdown, failure of an irreplaceable portion of the sample train, extreme meteorological conditions, or other circumstances, beyond the owner or operator's control, compliance may, upon the Administrator's approval, be determined using the arithmetic mean of the results of the two other runs.

[36 FR 24877, Dec. 23, 1971, as amended at 39 FR 9314, Mar. 8, 1974; 42 FR 57126, Nov. 1, 1977; 44 FR 33612, June 11, 1979; 54 FR 6662, Feb. 14, 1989; 54 FR 21344, May 17, 1989; 64 FR 7463, Feb. 12, 1999; 72 FR 27442, May 16, 2007]

§ 60.9   Availability of information.

The availability to the public of information provided to, or otherwise obtained by, the Administrator under this part shall be governed by part 2 of this chapter. (Information submitted voluntarily to the Administrator for the purposes of §§60.5 and 60.6 is governed by §§2.201 through 2.213 of this chapter and not by §2.301 of this chapter.)

§ 60.10   State authority.

The provisions of this part shall not be construed in any manner to preclude any State or political subdivision thereof from:

(a) Adopting and enforcing any emission standard or limitation applicable to an affected facility, provided that such emission standard or limitation is not less stringent than the standard applicable to such facility.

(b) Requiring the owner or operator of an affected facility to obtain permits, licenses, or approvals prior to initiating construction, modification, or operation of such facility.

§ 60.11   Compliance with standards and maintenance requirements.

(a) Compliance with standards in this part, other than opacity standards, shall be determined in accordance with performance tests established by §60.8, unless otherwise specified in the applicable standard.

(b) Compliance with opacity standards in this part shall be determined by conducting observations in accordance with Method 9 in appendix A of this part, any alternative method that is approved by the Administrator, or as provided in paragraph (e)(5) of this section. For purposes of determining initial compliance, the minimum total time of observations shall be 3 hours (30 6-minute averages) for the performance test or other set of observations (meaning those fugitive-type emission sources subject only to an opacity standard).

(c) The opacity standards set forth in this part shall apply at all times except during periods of startup, shutdown, malfunction, and as otherwise provided in the applicable standard.

(d) At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any affected facility including associated air pollution control equipment in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Administrator which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source.

(e)(1) For the purpose of demonstrating initial compliance, opacity observations shall be conducted concurrently with the initial performance test required in §60.8 unless one of the following conditions apply. If no performance test under §60.8 is required, then opacity observations shall be conducted within 60 days after achieving the maximum production rate at which the affected facility will be operated but no later than 180 days after initial startup of the facility. If visibility or other conditions prevent the opacity observations from being conducted concurrently with the initial performance test required under §60.8, the source owner or operator shall reschedule the opacity observations as soon after the initial performance test as possible, but not later than 30 days thereafter, and shall advise the Administrator of the rescheduled date. In these cases, the 30-day prior notification to the Administrator required in §60.7(a)(6) shall be waived. The rescheduled opacity observations shall be conducted (to the extent possible) under the same operating conditions that existed during the initial performance test conducted under §60.8. The visible emissions observer shall determine whether visibility or other conditions prevent the opacity observations from being made concurrently with the initial performance test in accordance with procedures contained in Method 9 of appendix B of this part. Opacity readings of portions of plumes which contain condensed, uncombined water vapor shall not be used for purposes of determing compliance with opacity standards. The owner or operator of an affected facility shall make available, upon request by the Administrator, such records as may be necessary to determine the conditions under which the visual observations were made and shall provide evidence indicating proof of current visible observer emission certification. Except as provided in paragraph (e)(5) of this section, the results of continuous monitoring by transmissometer which indicate that the opacity at the time visual observations were made was not in excess of the standard are probative but not conclusive evidence of the actual opacity of an emission, provided that the source shall meet the burden of proving that the instrument used meets (at the time of the alleged violation) Performance Specification 1 in appendix B of this part, has been properly maintained and (at the time of the alleged violation) that the resulting data have not been altered in any way.

(2) Except as provided in paragraph (e)(3) of this section, the owner or operator of an affected facility to which an opacity standard in this part applies shall conduct opacity observations in accordance with paragraph (b) of this section, shall record the opacity of emissions, and shall report to the Administrator the opacity results along with the results of the initial performance test required under §60.8. The inability of an owner or operator to secure a visible emissions observer shall not be considered a reason for not conducting the opacity observations concurrent with the initial performance test.

(3) The owner or operator of an affected facility to which an opacity standard in this part applies may request the Administrator to determine and to record the opacity of emissions from the affected facility during the initial performance test and at such times as may be required. The owner or operator of the affected facility shall report the opacity results. Any request to the Administrator to determine and to record the opacity of emissions from an affected facility shall be included in the notification required in §60.7(a)(6). If, for some reason, the Administrator cannot determine and record the opacity of emissions from the affected facility during the performance test, then the provisions of paragraph (e)(1) of this section shall apply.

(4) An owner or operator of an affected facility using a continuous opacity monitor (transmissometer) shall record the monitoring data produced during the initial performance test required by §60.8 and shall furnish the Administrator a written report of the monitoring results along with Method 9 and §60.8 performance test results.

(5) An owner or operator of an affected facility subject to an opacity standard may submit, for compliance purposes, continuous opacity monitoring system (COMS) data results produced during any performance test required under §60.8 in lieu of Method 9 observation data. If an owner or operator elects to submit COMS data for compliance with the opacity standard, he shall notify the Administrator of that decision, in writing, at least 30 days before any performance test required under §60.8 is conducted. Once the owner or operator of an affected facility has notified the Administrator to that effect, the COMS data results will be used to determine opacity compliance during subsequent tests required under §60.8 until the owner or operator notifies the Administrator, in writing, to the contrary. For the purpose of determining compliance with the opacity standard during a performance test required under §60.8 using COMS data, the minimum total time of COMS data collection shall be averages of all 6-minute continuous periods within the duration of the mass emission performance test. Results of the COMS opacity determinations shall be submitted along with the results of the performance test required under §60.8. The owner or operator of an affected facility using a COMS for compliance purposes is responsible for demonstrating that the COMS meets the requirements specified in §60.13(c) of this part, that the COMS has been properly maintained and operated, and that the resulting data have not been altered in any way. If COMS data results are submitted for compliance with the opacity standard for a period of time during which Method 9 data indicates noncompliance, the Method 9 data will be used to determine compliance with the opacity standard.

(6) Upon receipt from an owner or operator of the written reports of the results of the performance tests required by §60.8, the opacity observation results and observer certification required by §60.11(e)(1), and the COMS results, if applicable, the Administrator will make a finding concerning compliance with opacity and other applicable standards. If COMS data results are used to comply with an opacity standard, only those results are required to be submitted along with the performance test results required by §60.8. If the Administrator finds that an affected facility is in compliance with all applicable standards for which performance tests are conducted in accordance with §60.8 of this part but during the time such performance tests are being conducted fails to meet any applicable opacity standard, he shall notify the owner or operator and advise him that he may petition the Administrator within 10 days of receipt of notification to make appropriate adjustment to the opacity standard for the affected facility.

(7) The Administrator will grant such a petition upon a demonstration by the owner or operator that the affected facility and associated air pollution control equipment was operated and maintained in a manner to minimize the opacity of emissions during the performance tests; that the performance tests were performed under the conditions established by the Administrator; and that the affected facility and associated air pollution control equipment were incapable of being adjusted or operated to meet the applicable opacity standard.

(8) The Administrator will establish an opacity standard for the affected facility meeting the above requirements at a level at which the source will be able, as indicated by the performance and opacity tests, to meet the opacity standard at all times during which the source is meeting the mass or concentration emission standard. The Administrator will promulgate the new opacity standard in theFederal Register.

(f) Special provisions set forth under an applicable subpart shall supersede any conflicting provisions in paragraphs (a) through (e) of this section.

(g) For the purpose of submitting compliance certifications or establishing whether or not a person has violated or is in violation of any standard in this part, nothing in this part shall preclude the use, including the exclusive use, of any credible evidence or information, relevant to whether a source would have been in compliance with applicable requirements if the appropriate performance or compliance test or procedure had been performed.

[38 FR 28565, Oct. 15, 1973, as amended at 39 FR 39873, Nov. 12, 1974; 43 FR 8800, Mar. 3, 1978; 45 FR 23379, Apr. 4, 1980; 48 FR 48335, Oct. 18, 1983; 50 FR 53113, Dec. 27, 1985; 51 FR 1790, Jan. 15, 1986; 52 FR 9781, Mar. 26, 1987; 62 FR 8328, Feb. 24, 1997; 65 FR 61749, Oct. 17, 2000]

§ 60.12   Circumvention.

No owner or operator subject to the provisions of this part shall build, erect, install, or use any article, machine, equipment or process, the use of which conceals an emission which would otherwise constitute a violation of an applicable standard. Such concealment includes, but is not limited to, the use of gaseous diluents to achieve compliance with an opacity standard or with a standard which is based on the concentration of a pollutant in the gases discharged to the atmosphere.

[39 FR 9314, Mar. 8, 1974]

§ 60.13   Monitoring requirements.

(a) For the purposes of this section, all continuous monitoring systems required under applicable subparts shall be subject to the provisions of this section upon promulgation of performance specifications for continuous monitoring systems under appendix B to this part and, if the continuous monitoring system is used to demonstrate compliance with emission limits on a continuous basis, appendix F to this part, unless otherwise specified in an applicable subpart or by the Administrator. Appendix F is applicable December 4, 1987.

(b) All continuous monitoring systems and monitoring devices shall be installed and operational prior to conducting performance tests under §60.8. Verification of operational status shall, as a minimum, include completion of the manufacturer's written requirements or recommendations for installation, operation, and calibration of the device.

(c) If the owner or operator of an affected facility elects to submit continous opacity monitoring system (COMS) data for compliance with the opacity standard as provided under §60.11(e)(5), he shall conduct a performance evaluation of the COMS as specified in Performance Specification 1, appendix B, of this part before the performance test required under §60.8 is conducted. Otherwise, the owner or operator of an affected facility shall conduct a performance evaluation of the COMS or continuous emission monitoring system (CEMS) during any performance test required under §60.8 or within 30 days thereafter in accordance with the applicable performance specification in appendix B of this part, The owner or operator of an affected facility shall conduct COMS or CEMS performance evaluations at such other times as may be required by the Administrator under section 114 of the Act.

(1) The owner or operator of an affected facility using a COMS to determine opacity compliance during any performance test required under §60.8 and as described in §60.11(e)(5) shall furnish the Administrator two or, upon request, more copies of a written report of the results of the COMS performance evaluation described in paragraph (c) of this section at least 10 days before the performance test required under §60.8 is conducted.

(2) Except as provided in paragraph (c)(1) of this section, the owner or operator of an affected facility shall furnish the Administrator within 60 days of completion two or, upon request, more copies of a written report of the results of the performance evaluation.

(d)(1) Owners and operators of a CEMS installed in accordance with the provisions of this part, must check the zero (or low level value between 0 and 20 percent of span value) and span (50 to 100 percent of span value) calibration drifts at least once daily in accordance with a written procedure. The zero and span must, as a minimum, be adjusted whenever either the 24-hour zero drift or the 24-hour span drift exceeds two times the limit of the applicable performance specification in appendix B of this part. The system must allow the amount of the excess zero and span drift to be recorded and quantified whenever specified. Owners and operators of a COMS installed in accordance with the provisions of this part, must automatically, intrinsic to the opacity monitor, check the zero and upscale (span) calibration drifts at least once daily. For a particular COMS, the acceptable range of zero and upscale calibration materials is as defined in the applicable version of PS–1 in appendix B of this part. For a COMS, the optical surfaces, exposed to the effluent gases, must be cleaned before performing the zero and upscale drift adjustments, except for systems using automatic zero adjustments. The optical surfaces must be cleaned when the cumulative automatic zero compensation exceeds 4 percent opacity.

(2) Unless otherwise approved by the Administrator, the following procedures must be followed for a COMS. Minimum procedures must include an automated method for producing a simulated zero opacity condition and an upscale opacity condition using a certified neutral density filter or other related technique to produce a known obstruction of the light beam. Such procedures must provide a system check of all active analyzer internal optics with power or curvature, all active electronic circuitry including the light source and photodetector assembly, and electronic or electro-mechanical systems and hardware and or software used during normal measurement operation.

(e) Except for system breakdowns, repairs, calibration checks, and zero and span adjustments required under paragraph (d) of this section, all continuous monitoring systems shall be in continuous operation and shall meet minimum frequency of operation requirements as follows:

(1) All continuous monitoring systems referenced by paragraph (c) of this section for measuring opacity of emissions shall complete a minimum of one cycle of sampling and analyzing for each successive 10-second period and one cycle of data recording for each successive 6-minute period.

(2) All continuous monitoring systems referenced by paragraph (c) of this section for measuring emissions, except opacity, shall complete a minimum of one cycle of operation (sampling, analyzing, and data recording) for each successive 15-minute period.

(f) All continuous monitoring systems or monitoring devices shall be installed such that representative measurements of emissions or process parameters from the affected facility are obtained. Additional procedures for location of continuous monitoring systems contained in the applicable Performance Specifications of appendix B of this part shall be used.

(g) When the effluents from a single affected facility or two or more affected facilities subject to the same emission standards are combined before being released to the atmosphere, the owner or operator may install applicable continuous monitoring systems on each effluent or on the combined effluent. When the affected facilities are not subject to the same emission standards, separate continuous monitoring systems shall be installed on each effluent. When the effluent from one affected facility is released to the atmosphere through more than one point, the owner or operator shall install an applicable continuous monitoring system on each separate effluent unless the installation of fewer systems is approved by the Administrator. When more than one continuous monitoring system is used to measure the emissions from one affected facility (e.g., multiple breechings, multiple outlets), the owner or operator shall report the results as required from each continuous monitoring system.

(h)(1) Owners or operators of all continuous monitoring systems for measurement of opacity shall reduce all data to 6-minute averages and for continuous monitoring systems other than opacity to 1-hour averages for time periods as defined in §60.2. Six-minute opacity averages shall be calculated from 36 or more data points equally spaced over each 6-minute period.

(2) For continuous monitoring systems other than opacity, 1-hour averages shall be computed as follows, except that the provisions pertaining to the validation of partial operating hours are only applicable for affected facilities that are required by the applicable subpart to include partial hours in the emission calculations:

(i) Except as provided under paragraph (h)(2)(iii) of this section, for a full operating hour (any clock hour with 60 minutes of unit operation), at least four valid data points are required to calculate the hourly average, i.e. , one data point in each of the 15-minute quadrants of the hour.

(ii) Except as provided under paragraph (h)(2)(iii) of this section, for a partial operating hour (any clock hour with less than 60 minutes of unit operation), at least one valid data point in each 15-minute quadrant of the hour in which the unit operates is required to calculate the hourly average.

(iii) For any operating hour in which required maintenance or quality-assurance activities are performed:

(A) If the unit operates in two or more quadrants of the hour, a minimum of two valid data points, separated by at least 15 minutes, is required to calculate the hourly average; or

(B) If the unit operates in only one quadrant of the hour, at least one valid data point is required to calculate the hourly average.

(iv) If a daily calibration error check is failed during any operating hour, all data for that hour shall be invalidated, unless a subsequent calibration error test is passed in the same hour and the requirements of paragraph (h)(2)(iii) of this section are met, based solely on valid data recorded after the successful calibration.

(v) For each full or partial operating hour, all valid data points shall be used to calculate the hourly average.

(vi) Except as provided under paragraph (h)(2)(vii) of this section, data recorded during periods of continuous monitoring system breakdown, repair, calibration checks, and zero and span adjustments shall not be included in the data averages computed under this paragraph.

(vii) Owners and operators complying with the requirements of §60.7(f)(1) or (2) must include any data recorded during periods of monitor breakdown or malfunction in the data averages.

(viii) When specified in an applicable subpart, hourly averages for certain partial operating hours shall not be computed or included in the emission averages ( e.g. hours with < 30 minutes of unit operation under §60.47b(d)).

(ix) Either arithmetic or integrated averaging of all data may be used to calculate the hourly averages. The data may be recorded in reduced or nonreduced form ( e.g. , ppm pollutant and percent O2or ng/J of pollutant).

(3) All excess emissions shall be converted into units of the standard using the applicable conversion procedures specified in the applicable subpart. After conversion into units of the standard, the data may be rounded to the same number of significant digits used in the applicable subpart to specify the emission limit.

(i) After receipt and consideration of written application, the Administrator may approve alternatives to any monitoring procedures or requirements of this part including, but not limited to the following:

(1) Alternative monitoring requirements when installation of a continuous monitoring system or monitoring device specified by this part would not provide accurate measurements due to liquid water or other interferences caused by substances in the effluent gases.

(2) Alternative monitoring requirements when the affected facility is infrequently operated.

(3) Alternative monitoring requirements to accommodate continuous monitoring systems that require additional measurements to correct for stack moisture conditions.

(4) Alternative locations for installing continuous monitoring systems or monitoring devices when the owner or operator can demonstrate that installation at alternate locations will enable accurate and representative measurements.

(5) Alternative methods of converting pollutant concentration measurements to units of the standards.

(6) Alternative procedures for performing daily checks of zero and span drift that do not involve use of span gases or test cells.

(7) Alternatives to the A.S.T.M. test methods or sampling procedures specified by any subpart.

(8) Alternative continuous monitoring systems that do not meet the design or performance requirements in Performance Specification 1, appendix B, but adequately demonstrate a definite and consistent relationship between its measurements and the measurements of opacity by a system complying with the requirements in Performance Specification 1. The Administrator may require that such demonstration be performed for each affected facility.

(9) Alternative monitoring requirements when the effluent from a single affected facility or the combined effluent from two or more affected facilities is released to the atmosphere through more than one point.

(j) An alternative to the relative accuracy (RA) test specified in Performance Specification 2 of appendix B may be requested as follows:

(1) An alternative to the reference method tests for determining RA is available for sources with emission rates demonstrated to be less than 50 percent of the applicable standard. A source owner or operator may petition the Administrator to waive the RA test in Section 8.4 of Performance Specification 2 and substitute the procedures in Section 16.0 if the results of a performance test conducted according to the requirements in §60.8 of this subpart or other tests performed following the criteria in §60.8 demonstrate that the emission rate of the pollutant of interest in the units of the applicable standard is less than 50 percent of the applicable standard. For sources subject to standards expressed as control efficiency levels, a source owner or operator may petition the Administrator to waive the RA test and substitute the procedures in Section 16.0 of Performance Specification 2 if the control device exhaust emission rate is less than 50 percent of the level needed to meet the control efficiency requirement. The alternative procedures do not apply if the continuous emission monitoring system is used to determine compliance continuously with the applicable standard. The petition to waive the RA test shall include a detailed description of the procedures to be applied. Included shall be location and procedure for conducting the alternative, the concentration or response levels of the alternative RA materials, and the other equipment checks included in the alternative procedure. The Administrator will review the petition for completeness and applicability. The determination to grant a waiver will depend on the intended use of the CEMS data (e.g., data collection purposes other than NSPS) and may require specifications more stringent than in Performance Specification 2 (e.g., the applicable emission limit is more stringent than NSPS).

(2) The waiver of a CEMS RA test will be reviewed and may be rescinded at such time, following successful completion of the alternative RA procedure, that the CEMS data indicate that the source emissions are approaching the level. The criterion for reviewing the waiver is the collection of CEMS data showing that emissions have exceeded 70 percent of the applicable standard for seven, consecutive, averaging periods as specified by the applicable regulation(s). For sources subject to standards expressed as control efficiency levels, the criterion for reviewing the waiver is the collection of CEMS data showing that exhaust emissions have exceeded 70 percent of the level needed to meet the control efficiency requirement for seven, consecutive, averaging periods as specified by the applicable regulation(s) [e.g., §60.45(g) (2) and (3), §60.73(e), and §60.84(e)]. It is the responsibility of the source operator to maintain records and determine the level of emissions relative to the criterion on the waiver of RA testing. If this criterion is exceeded, the owner or operator must notify the Administrator within 10 days of such occurrence and include a description of the nature and cause of the increasing emissions. The Administrator will review the notification and may rescind the waiver and require the owner or operator to conduct a RA test of the CEMS as specified in Section 8.4 of Performance Specification 2.

[40 FR 46255, Oct. 6, 1975; 40 FR 59205, Dec. 22, 1975, as amended at 41 FR 35185, Aug. 20, 1976; 48 FR 13326, Mar. 30, 1983; 48 FR 23610, May 25, 1983; 48 FR 32986, July 20, 1983; 52 FR 9782, Mar. 26, 1987; 52 FR 17555, May 11, 1987; 52 FR 21007, June 4, 1987; 64 FR 7463, Feb. 12, 1999; 65 FR 48920, Aug. 10, 2000; 65 FR 61749, Oct. 17, 2000; 66 FR 44980, Aug. 27, 2001; 71 FR 31102, June 1, 2006; 72 FR 32714, June 13, 2007]

Editorial Note:   At 65 FR 61749, Oct. 17, 2000, §60.13 was amended by revising the words “ng/J of pollutant” to read “ng of pollutant per J of heat input” in the sixth sentence of paragraph (h). However, the amendment could not be incorporated because the words “ng/J of pollutant” do not exist in the sixth sentence of paragraph (h).

§ 60.14   Modification.

(a) Except as provided under paragraphs (e) and (f) of this section, any physical or operational change to an existing facility which results in an increase in the emission rate to the atmosphere of any pollutant to which a standard applies shall be considered a modification within the meaning of section 111 of the Act. Upon modification, an existing facility shall become an affected facility for each pollutant to which a standard applies and for which there is an increase in the emission rate to the atmosphere.

(b) Emission rate shall be expressed as kg/hr of any pollutant discharged into the atmosphere for which a standard is applicable. The Administrator shall use the following to determine emission rate:

(1) Emission factors as specified in the latest issue of “Compilation of Air Pollutant Emission Factors,” EPA Publication No. AP–42, or other emission factors determined by the Administrator to be superior to AP–42 emission factors, in cases where utilization of emission factors demonstrates that the emission level resulting from the physical or operational change will either clearly increase or clearly not increase.

(2) Material balances, continuous monitor data, or manual emission tests in cases where utilization of emission factors as referenced in paragraph (b)(1) of this section does not demonstrate to the Administrator's satisfaction whether the emission level resulting from the physical or operational change will either clearly increase or clearly not increase, or where an owner or operator demonstrates to the Administrator's satisfaction that there are reasonable grounds to dispute the result obtained by the Administrator utilizing emission factors as referenced in paragraph (b)(1) of this section. When the emission rate is based on results from manual emission tests or continuous monitoring systems, the procedures specified in appendix C of this part shall be used to determine whether an increase in emission rate has occurred. Tests shall be conducted under such conditions as the Administrator shall specify to the owner or operator based on representative performance of the facility. At least three valid test runs must be conducted before and at least three after the physical or operational change. All operating parameters which may affect emissions must be held constant to the maximum feasible degree for all test runs.

(c) The addition of an affected facility to a stationary source as an expansion to that source or as a replacement for an existing facility shall not by itself bring within the applicability of this part any other facility within that source.

(d) [Reserved]

(e) The following shall not, by themselves, be considered modifications under this part:

(1) Maintenance, repair, and replacement which the Administrator determines to be routine for a source category, subject to the provisions of paragraph (c) of this section and §60.15.

(2) An increase in production rate of an existing facility, if that increase can be accomplished without a capital expenditure on that facility.

(3) An increase in the hours of operation.

(4) Use of an alternative fuel or raw material if, prior to the date any standard under this part becomes applicable to that source type, as provided by §60.1, the existing facility was designed to accommodate that alternative use. A facility shall be considered to be designed to accommodate an alternative fuel or raw material if that use could be accomplished under the facility's construction specifications as amended prior to the change. Conversion to coal required for energy considerations, as specified in section 111(a)(8) of the Act, shall not be considered a modification.

(5) The addition or use of any system or device whose primary function is the reduction of air pollutants, except when an emission control system is removed or is replaced by a system which the Administrator determines to be less environmentally beneficial.

(6) The relocation or change in ownership of an existing facility.

(f) Special provisions set forth under an applicable subpart of this part shall supersede any conflicting provisions of this section.

(g) Within 180 days of the completion of any physical or operational change subject to the control measures specified in paragraph (a) of this section, compliance with all applicable standards must be achieved.

(h) No physical change, or change in the method of operation, at an existing electric utility steam generating unit shall be treated as a modification for the purposes of this section provided that such change does not increase the maximum hourly emissions of any pollutant regulated under this section above the maximum hourly emissions achievable at that unit during the 5 years prior to the change.

(i) Repowering projects that are awarded funding from the Department of Energy as permanent clean coal technology demonstration projects (or similar projects funded by EPA) are exempt from the requirements of this section provided that such change does not increase the maximum hourly emissions of any pollutant regulated under this section above the maximum hourly emissions achievable at that unit during the five years prior to the change.

(j)(1) Repowering projects that qualify for an extension under section 409(b) of the Clean Air Act are exempt from the requirements of this section, provided that such change does not increase the actual hourly emissions of any pollutant regulated under this section above the actual hourly emissions achievable at that unit during the 5 years prior to the change.

(2) This exemption shall not apply to any new unit that:

(i) Is designated as a replacement for an existing unit;

(ii) Qualifies under section 409(b) of the Clean Air Act for an extension of an emission limitation compliance date under section 405 of the Clean Air Act; and

(iii) Is located at a different site than the existing unit.

(k) The installation, operation, cessation, or remov