|
|
Each railroad shall report to FRA within 15 days each activation failure of a highway-rail grade crossing warning system. FRA Form No. 6180–83, “Highway-Rail Grade Crossing Warning System Failure Report,” shall be used for this purpose and completed in accordance with instructions printed on the form.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||