 |
|
 |
Home Page > Executive Branch > Code of Federal Regulations > Electronic Code of Federal Regulations

e-CFR Data is current as of February 4, 2010
TITLE 14--Aeronautics and Space
CHAPTER III--COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
SUBCHAPTER C--LICENSING
PART 417--LAUNCH SAFETY
Subpart A--GENERAL AND LICENSE TERMS AND CONDITIONS
|
| Definitions and acronyms. |
|
|
| Public safety responsibility. |
|
|
| Launch site responsibility. |
|
|
| Continuing accuracy of license application; application for modification of license. |
|
|
| Agreement with Federal launch range. |
|
|
| Launch reporting requirements and launch specific updates. |
|
|
| Registration of space objects. |
|
|
| Financial responsibility requirements. |
|
Subpart B--LAUNCH SAFETY RESPONSIBILITIES
|
| Launch personnel qualifications and certification. |
|
|
| Safety critical preflight operations. |
|
|
| Computing systems and software. |
|
|
| Launch of an unguided suborbital launch vehicle. |
|
|
| Unique safety policies, requirements and practices. |
|
Subpart C--FLIGHT SAFETY ANALYSIS
|
| Malfunction turn analysis. |
|
|
| Flight safety limits analysis. |
|
|
| Straight-up time analysis. |
|
|
| Overflight gate analysis. |
|
|
| Hold-and-resume gate analysis. |
|
|
| Data loss flight time and planned safe flight state analyses. |
|
|
| Flight hazard area analysis. |
|
|
| Probability of failure analysis. |
|
|
| Toxic release hazard analysis. |
|
|
| Far-field overpressure blast effects analysis. |
|
|
| Collision avoidance analysis. |
|
|
| Analysis for an unguided suborbital launch vehicle flown with a wind weighting safety system. |
|
Subpart D--FLIGHT SAFETY SYSTEM
|
| Command control system requirements. |
|
|
| Command control system testing. |
|
|
| Flight safety system analysis. |
|
|
| Flight safety crew roles and qualifications. |
|
Subpart E--GROUND SAFETY
|
| Hazard control implementation. |
|
|
| Safety clear zones for hazardous operations. |
|
|
| Post-launch and post-flight-attempt hazard controls. |
|
|
| Propellants and explosives. |
|
|
| Appendix A to Part 417
--Flight Safety Analysis Methodologies and Products for a Launch Vehicle Flown With a Flight Safety System |
|
|
| Appendix C to Part 417
--Flight Safety Analysis Methodologies and Products for an Unguided Suborbital Launch Vehicle Flown With a Wind Weighting Safety System |
|
|