Skip to content.Skip to side navigation. Quick Navigation: Skip to content.Skip to side navigation.
GPO Access Home Page.
Jump to selected topic.
Navigation Bar
About.Help. A-Z Resource List. Locate a Federal Depository Library. Buy Publications. Legislative. Executive. Judicial.
National Archives and Records Administration logo.
Database Features.
Browse
Simple Search
Advanced Search
* Boolean
  * Proximity
Search History
Search Tips
Corrections

Latest Updates

User Info
FAQs
Agency List
Incorporation by Reference
e-CFR Main Page
Related Resources
Code of Federal Regulations
Federal Register
List of CFR
Sections Affected
Regulations.gov
Unified Agenda
All NARA Publications
About Government.
Ben's Guide Logo.
Get Adobe Reader

blue pill
e-CFR Data is current as of February 4, 2010

TITLE 30--Mineral Resources

CHAPTER I--MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR

SUBCHAPTER B--TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS

PART 18--ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES

rule

Subpart A--GENERAL PROVISIONS

§18.1
Purpose.
§18.2
Definitions.
§18.3
Consultation.
§18.4
Electrical equipment for which approval is issued.
§18.5
Equipment for which certification will be issued.
§18.6
Applications.
§18.7
[Reserved]
§18.8
Date for conducting investigation and tests.
§18.9
Conduct of investigations and tests.
§18.10
Notice of approval or disapproval.
§18.11
Approval plate.
§18.12
Letter of certification.
§18.13
Certification plate.
§18.14
Identification of tested noncertified explosion-proof enclosures.
§18.15
Changes after approval or certification.
§18.16
Withdrawal of approval, certification, or acceptance.
rule

Subpart B--CONSTRUCTION AND DESIGN REQUIREMENTS

§18.20
Quality of material, workmanship, and design.
§18.21
Machines equipped with powered dust collectors.
§18.22
Boring-type machines equipped for auxiliary face ventilation.
§18.23
Limitation of external surface temperatures.
§18.24
Electrical clearances.
§18.25
Combustible gases from insulating material.
§18.26
Static electricity.
§18.27
Gaskets.
§18.28
Devices for pressure relief, ventilation, or drainage.
§18.29
Access openings and covers, including unused lead-entrance holes.
§18.30
Windows and lenses.
§18.31
Enclosures--joints and fastenings.
§18.32
Fastenings--additional requirements.
§18.33
Finish of surface joints.
§18.34
Motors.
§18.35
Portable (trailing) cables and cords.
§18.36
Cables between machine components.
§18.37
Lead entrances.
§18.38
Leads through common walls.
§18.39
Hose conduit.
§18.40
Cable clamps and grips.
§18.41
Plug and receptacle-type connectors.
§18.42
Explosion-proof distribution boxes.
§18.43
Explosion-proof splice boxes.
§18.44
Non-intrinsically safe battery-powered equipment.
§18.45
Cable reels.
§18.46
Headlights.
§18.47
Voltage limitation.
§18.48
Circuit-interrupting devices.
§18.49
Connection boxes on machines.
§18.50
Protection against external arcs and sparks.
§18.51
Electrical protection of circuits and equipment.
§18.52
Renewal of fuses.
§18.53
High-voltage longwall mining systems.
rule

Subpart C--INSPECTIONS AND TESTS

§18.60
Detailed inspection of components.
§18.61
Final inspection of complete machine.
§18.62
Tests to determine explosion-proof characteristics.
§18.63
[Reserved]
§18.65
Flame test of hose.
§18.66
Tests of windows and lenses.
§18.67
Static-pressure tests.
§18.68
Tests for intrinsic safety.
§18.69
Adequacy tests.
rule

Subpart D--MACHINES ASSEMBLED WITH CERTIFIED OR EXPLOSION-PROOF COMPONENTS, FIELD MODIFICATIONS OF APPROVED MACHINES, AND PERMITS TO USE EXPERIMENTAL EQUIPMENT

§18.80
Approval of machines assembled with certified or explosion-proof components.
§18.81
Field modification of approved (permissible) equipment; application for approval of modification; approval of plans for modification before modification.
§18.82
Permit to use experimental electric face equipment in a gassy mine or tunnel.
Appendix
Appendix I to Subpart D of Part 18
Appendix
Appendix II to Subpart D of Part 18
rule

Subpart E--FIELD APPROVAL OF ELECTRICALLY OPERATED MINING EQUIPMENT

§18.90
Purpose.
§18.91
Electric equipment for which field approvals will be issued.
§18.92
Quality of material and design.
§18.93
Application for field approval; filing procedures.
§18.94
Application for field approval; contents of application.
§18.95
Approval of machines constructed of components approved, accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G.
§18.96
Preparation of machines for inspection; requirements.
§18.97
Inspection of machines; minimum requirements.
§18.98
Enclosures, joints, and fastenings; pressure testing.
§18.99
Notice of approval or disapproval; letters of approval and approval plates.