 |
|
 |
Home Page > Executive Branch > Code of Federal Regulations > Electronic Code of Federal Regulations

e-CFR Data is current as of November 19, 2009
TITLE 30--Mineral Resources
CHAPTER VII--OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR
SUBCHAPTER K--PERMANENT PROGRAM PERFORMANCE STANDARDS
PART 817--PERMANENT PROGRAM PERFORMANCE STANDARDS--UNDERGROUND MINING ACTIVITIES
|
| Casing and sealing of exposed underground openings: General requirements. |
|
|
| Casing and sealing of underground openings: Temporary. |
|
|
| Casing and sealing of underground openings: Permanent. |
|
|
| Hydrologic-balance protection. |
|
|
| Hydrologic balance: Water quality standards and effluent limitations. |
|
|
| Hydrologic balance: Sediment control measures. |
|
|
| Hydrologic balance: Siltation structures. |
|
|
| Hydrologic balance: Discharge structures. |
|
|
| Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities. |
|
|
| Hydrologic balance: Surface activities in or adjacent to perennial or intermittent streams. |
|
|
| Use of explosives: General requirements. |
|
|
| Use of explosives: Preblasting survey. |
|
|
| Use of explosives: General performance standards. |
|
|
| Use of explosives: Blasting signs, warnings, and access control. |
|
|
| Use of explosives: Control of adverse effects. |
|
|
| Use of explosives: Records of blasting operations. |
|
|
| Disposal of excess spoil: General requirements. |
|
|
| Disposal of excess spoil: Valley fill/head-of-hollow fills. |
|
|
| Disposal of excess spoil: Durable rock fills. |
|
|
| Disposal of excess spoil: Preexisting benches. |
|
|
| Coal mine waste: General requirements. |
|
|
| Coal mine waste: Refuse piles. |
|
|
| Coal mine waste: Impounding structures. |
|
|
| Coal mine waste: Burning and burned waste utilization. |
|
|
| Disposal of noncoal mine wastes. |
|
|
| Stabilization of surface areas. |
|
|
| Protection of fish, wildlife, and related environmental values. |
|
|
| Contemporaneous reclamation. |
|
|
| Backfilling and grading: General requirements. |
|
|
| Backfilling and grading: Previously mined areas. |
|
|
| Backfilling and grading: Steep slopes. |
|
|
| Revegetation: General requirements. |
|
|
| Revegetation: Mulching and other soil stabilizing practices. |
|
|
| Revegetation: Standards for success. |
|
|
| Subsidence control: Public notice. |
|
|
| Cessation of operations: Temporary. |
|
|
| Cessation of operations: Permanent. |
|
|
| Interpretative rules related to general performance standards. |
|
|