TITLE 40--Protection of Environment
CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY
SUBCHAPTER I--SOLID WASTES
PART 264--STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES
Subpart A--GENERAL
|
| Purpose, scope and applicability. |
|
|
| Relationship to interim status standards. |
|
Subpart B--GENERAL FACILITY STANDARDS
|
| General inspection requirements. |
|
|
| General requirements for ignitable, reactive, or incompatible wastes. |
|
|
| Construction quality assurance program. |
|
Subpart C--PREPAREDNESS AND PREVENTION
|
| Design and operation of facility. |
|
|
| Testing and maintenance of equipment. |
|
|
| Access to communications or alarm system. |
|
|
| Arrangements with local authorities. |
|
Subpart D--CONTINGENCY PLAN AND EMERGENCY PROCEDURES
|
| Purpose and implementation of contingency plan. |
|
|
| Content of contingency plan. |
|
|
| Copies of contingency plan. |
|
|
| Amendment of contingency plan. |
|
Subpart E--MANIFEST SYSTEM, RECORDKEEPING, AND REPORTING
|
| Availability, retention, and disposition of records. |
|
|
| Unmanifested waste report. |
|
Subpart F--RELEASES FROM SOLID WASTE MANAGEMENT UNITS
|
| Ground-water protection standard. |
|
|
| General ground-water monitoring requirements. |
|
|
| Detection monitoring program. |
|
|
| Compliance monitoring program. |
|
|
| Corrective action program. |
|
|
| Corrective action for solid waste management units. |
|
Subpart G--CLOSURE AND POST-CLOSURE
|
| Closure performance standard. |
|
|
| Closure plan; amendment of plan. |
|
|
| Closure; time allowed for closure. |
|
|
| Disposal or decontamination of equipment, structures and soils. |
|
|
| Certification of closure. |
|
|
| Post-closure care and use of property. |
|
|
| Post-closure plan; amendment of plan. |
|
|
| Certification of completion of post-closure care. |
|
Subpart H--FINANCIAL REQUIREMENTS
|
| Definitions of terms as used in this subpart. |
|
|
| Cost estimate for closure. |
|
|
| Financial assurance for closure. |
|
|
| Cost estimate for post-closure care. |
|
|
| Financial assurance for post-closure care. |
|
|
| Use of a mechanism for financial assurance of both closure and post-closure care. |
|
|
| Incapacity of owners or operators, guarantors, or financial institutions. |
|
|
| Use of State-required mechanisms. |
|
|
| State assumption of responsibility. |
|
|
| Wording of the instruments. |
|
Subpart I--USE AND MANAGEMENT OF CONTAINERS
|
| Compatibility of waste with containers. |
|
|
| Management of containers. |
|
|
| Special requirements for ignitable or reactive waste. |
|
|
| Special requirements for incompatible wastes. |
|
Subpart J--TANK SYSTEMS
|
| Assessment of existing tank system's integrity. |
|
|
| Design and installation of new tank systems or components. |
|
|
| Containment and detection of releases. |
|
|
| General operating requirements. |
|
|
| Response to leaks or spills and disposition of leaking or unfit-for-use tank systems. |
|
|
| Closure and post-closure care. |
|
|
| Special requirements for ignitable or reactive wastes. |
|
|
| Special requirements for incompatible wastes. |
|
Subpart K--SURFACE IMPOUNDMENTS
|
| Design and operating requirements. |
|
|
| Monitoring and inspection. |
|
|
| Emergency repairs; contingency plans. |
|
|
| Closure and post-closure care. |
|
|
| Special requirements for ignitable or reactive waste. |
|
|
| Special requirements for incompatible wastes. |
|
|
| Special requirements for hazardous wastes FO20, FO21, FO22, FO23, FO26, and FO27. |
|
Subpart L--WASTE PILES
|
| Design and operating requirements. |
|
|
| Monitoring and inspection. |
|
|
| Special requirements for ignitable or reactive waste. |
|
|
| Special requirements for incompatible wastes. |
|
|
| Closure and post-closure care. |
|
|
| Special requirements for hazardous wastes FO20, FO21, FO22, FO23, FO26, and FO27. |
|
Subpart M--LAND TREATMENT
|
| Design and operating requirements. |
|
|
| Unsaturated zone monitoring. |
|
|
| Closure and post-closure care. |
|
|
| Special requirements for ignitable or reactive waste. |
|
|
| Special requirements for incompatible wastes. |
|
|
| Special requirements for hazardous wastes FO20, FO21, FO22, FO23, FO26, and FO27. |
|
Subpart N--LANDFILLS
|
| Design and operating requirements. |
|
|
| Monitoring and inspection. |
|
|
| Surveying and recordkeeping. |
|
|
| Closure and post-closure care. |
|
|
| Special requirements for ignitable or reactive waste. |
|
|
| Special requirements for incompatible wastes. |
|
|
| Special requirements for bulk and containerized liquids. |
|
|
| Special requirements for containers. |
|
|
| Disposal of small containers of hazardous waste in overpacked drums (lab packs). |
|
|
| Special requirements for hazardous wastes FO20, FO21, FO22, FO23, FO26, and FO27. |
|
Subpart O--INCINERATORS
|
| Principal organic hazardous constituents (POHCs). |
|
|
| Hazardous waste incinerator permits. |
|
|
| Monitoring and inspections. |
|
Subparts P-R--[RESERVED]
Subpart S--SPECIAL PROVISIONS FOR CLEANUP
|
| Applicability of Corrective Action Management Unit (CAMU) regulations. |
|
|
| Grandfathered Corrective Action Management Units (CAMUs). |
|
|
| Corrective Action Management Units (CAMU). |
|
|
| Disposal of CAMU-eligible wastes in permitted hazardous waste landfills. |
|
Subparts T-V--[RESERVED]
Subpart W--DRIP PADS
|
| Assessment of existing drip pad integrity. |
|
|
| Design and installation of new drip pads. |
|
|
| Design and operating requirements. |
|
Subpart X--MISCELLANEOUS UNITS
|
| Environmental performance standards. |
|
|
| Monitoring, analysis, inspection, response, reporting, and corrective action. |
|
Subparts Y-Z--[RESERVED]
Subpart AA--AIR EMISSION STANDARDS FOR PROCESS VENTS
|
| Standards: Process vents. |
|
|
| Standards: Closed-vent systems and control devices. |
|
|
| Test methods and procedures. |
|
|
| Recordkeeping requirements. |
|
Subpart BB--AIR EMISSION STANDARDS FOR EQUIPMENT LEAKS
|
| Standards: Pumps in light liquid service. |
|
|
| Standards: Pressure relief devices in gas/vapor service. |
|
|
| Standards: Sampling connection systems. |
|
|
| Standards: Open-ended valves or lines. |
|
|
| Standards: Valves in gas/vapor service or in light liquid service. |
|
|
| Standards: Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service, and flanges and other connectors. |
|
|
| Standards: Delay of repair. |
|
|
| Standards: Closed-vent systems and control devices. |
|
|
| Alternative standards for valves in gas/vapor service or in light liquid service: percentage of valves allowed to leak. |
|
|
| Alternative standards for valves in gas/vapor service or in light liquid service: skip period leak detection and repair. |
|
|
| Test methods and procedures. |
|
|
| Recordkeeping requirements. |
|
Subpart CC--AIR EMISSION STANDARDS FOR TANKS, SURFACE IMPOUNDMENTS, AND CONTAINERS
|
| Waste determination procedures. |
|
|
| Standards: Surface impoundments. |
|
|
| Standards: Closed-vent systems and control devices. |
|
|
| Inspection and monitoring requirements. |
|
|
| Recordkeeping requirements. |
|
Subpart DD--CONTAINMENT BUILDINGS
|
| Design and operating standards. |
|
|
| Closure and post-closure care. |
|
Subpart EE--HAZARDOUS WASTE MUNITIONS AND EXPLOSIVES STORAGE
|
| Design and operating standards. |
|
|
| Closure and post-closure care. |
|
|