| Purpose and scope of these regulations. |
|
|
| Considerations under Federal law. |
|
|
| Noncompliance and program reporting by the Director. |
|
Subpart B--PERMIT APPLICATION
|
| General application requirements. |
|
|
| Signatories to permit applications and reports. |
|
|
| Confidentiality of information. |
|
|
| Contents of part A of the permit application. |
|
|
| Contents of part B: General requirements. |
|
|
| Specific part B information requirements for containers. |
|
|
| Specific part B information requirements for tank systems. |
|
|
| Specific part B information requirements for surface impoundments. |
|
|
| Specific part B information requirements for waste piles. |
|
|
| Specific part B information requirements for incinerators. |
|
|
| Specific part B information requirements for land treatment facilities. |
|
|
| Specific part B information requirements for landfills. |
|
|
| Specific part B information requirements for boilers and industrial furnaces burning hazardous waste. |
|
|
| Specific part B information requirements for miscellaneous units. |
|
|
| Specific part B information requirements for process vents. |
|
|
| Specific part B information requirements for equipment. |
|
|
| Special part B information requirements for drip pads. |
|
|
| Specific Part B information requirements for air emission controls for tanks, surface impoundments, and containers. |
|
|
| Part B information requirements for post-closure permits. |
|
Subpart C--PERMIT CONDITIONS
|
| Conditions applicable to all permits. |
|
|
| Requirements for recording and reporting of monitoring results. |
|
|
| Establishing permit conditions. |
|
Subpart D--CHANGES TO PERMIT
|
| Modification or revocation and reissuance of permits. |
|
|
| Permit modification at the request of the permittee. |
|
Subpart E--EXPIRATION AND CONTINUATION OF PERMITS
|
| Continuation of expiring permits. |
|
Subpart F--SPECIAL FORMS OF PERMITS
|
| Hazardous waste incinerator permits. |
|
|
| Permits for land treatment demonstrations using field test or laboratory analyses. |
|
|
| Interim permits for UIC wells. |
|
|
| Research, development, and demonstration permits. |
|
|
| Permits for boilers and industrial furnaces burning hazardous waste. |
|
|
| RCRA standardized permits for storage and treatment units. |
|
|
| Remedial Action Plans (RAPs). |
|
Subpart G--INTERIM STATUS
|
| Qualifying for interim status. |
|
|
| Operation during interim status. |
|
|
| Changes during interim status. |
|
|
| Termination of interim status. |
|
Subpart H--REMEDIAL ACTION PLANS (RAPS)
|
| Why is this subpart written in a special format? |
|
|
| Does my RAP grant me any rights or relieve me of any obligations? |
|
|
| How do I apply for a RAP? |
|
|
| Who must sign the application and any required reports for a RAP? |
|
|
| What must I include in my application for a RAP? |
|
|
| What if I want to keep this information confidential? |
|
|
| To whom must I submit my RAP application? |
|
|
| If I submit my RAP application as part of another document, what must I do? |
|
|
| What is the process for approving or denying my application for a RAP? |
|
|
| What must the Director include in a draft RAP? |
|
|
| What else must the Director prepare in addition to the draft RAP or notice of intent to deny? |
|
|
| What are the procedures for public comment on the draft RAP or notice of intent to deny? |
|
|
| How will the Director make a final decision on my RAP application? |
|
|
| May the decision to approve or deny my RAP application be administratively appealed? |
|
|
| When does my RAP become effective? |
|
|
| When may I begin physical construction of new units permitted under the RAP? |
|
|
| After my RAP is issued, how may it be modified, revoked and reissued, or terminated? |
|
|
| For what reasons may the Director choose to modify my final RAP? |
|
|
| For what reasons may the Director choose to revoke and reissue my final RAP? |
|
|
| For what reasons may the Director choose to terminate my final RAP, or deny my renewal application? |
|
|
| May the decision to approve or deny a modification, revocation and reissuance, or termination of my RAP be administratively appealed? |
|
|
| How may I renew my RAP if it is expiring? |
|
|
| What happens if I have applied correctly for a RAP renewal but have not received approval by the time my old RAP expires? |
|
|
| What records must I maintain concerning my RAP? |
|
|
| How are time periods in the requirements in this subpart and my RAP computed? |
|
|
| How may I transfer my RAP to a new owner or operator? |
|
|
| What must the State or EPA Region report about noncompliance with RAPs? |
|
|
| May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated? |
|
Subpart I--INTEGRATION WITH MAXIMUM ACHIEVABLE CONTROL TECHNOLOGY (MACT) STANDARDS
|
| Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid fuel boilers and hydrochloric acid production furnaces to minimize emissions from startup, shutdown, and malfunction events. |
|
Subpart J--RCRA STANDARDIZED PERMITS FOR STORAGE AND TREATMENT UNITS
|
| What is a RCRA standardized permit? |
|
|
| Who is eligible for a standardized permit? |
|
|
| What requirements of part 270 apply to a standardized permit? |
|
|
| How do I apply for a standardized permit? |
|
|
| What information must I submit to the permitting agency to support my standardized permit application? |
|
|
| What are the certification requirements? |
|
|
| What general types of information must I keep at my facility? |
|
|
| What container information must I keep at my facility? |
|
|
| What tank information must I keep at my facility? |
|
|
| What equipment information must I keep at my facility? |
|
|
| What air emissions control information must I keep at my facility? |
|
|
| How do I modify my RCRA standardized permit? |
|
|