| Determination of construction or modification. |
|
|
| Notification and record keeping. |
|
|
| Availability of information. |
|
|
| Compliance with standards and maintenance requirements. |
|
|
| Incorporations by reference. |
|
|
| General control device and work practice requirements. |
|
|
| General notification and reporting requirements. |
|
Subpart B--ADOPTION AND SUBMITTAL OF STATE PLANS FOR DESIGNATED FACILITIES
|
| Publication of guideline documents, emission guidelines, and final compliance times. |
|
|
| Adoption and submittal of State plans; public hearings. |
|
|
| Emission standards and compliance schedules. |
|
|
| Emission inventories, source surveillance, reports. |
|
|
| Actions by the Administrator. |
|
|
| Plan revisions by the State. |
|
|
| Plan revisions by the Administrator. |
|
Subpart C--EMISSION GUIDELINES AND COMPLIANCE TIMES
Subpart CA--[RESERVED]
Subpart CB--EMISSIONS GUIDELINES AND COMPLIANCE TIMES FOR LARGE MUNICIPAL WASTE COMBUSTORS THAT ARE CONSTRUCTED ON OR BEFORE SEPTEMBER 20, 1994
|
| Scope and delegation of authority. |
|
|
| Emission guidelines for municipal waste combustor metals, acid gases, organics, and nitrogen oxides. |
|
|
| Emission guidelines for municipal waste combustor operating practices. |
|
|
| Emission guidelines for municipal waste combustor operator training and certification. |
|
|
| Emission guidelines for municipal waste combustor fugitive ash emissions. |
|
|
| Emission guidelines for air curtain incinerators. |
|
|
| Compliance and performance testing. |
|
|
| Reporting and recordkeeping guidelines and compliance schedules. |
|
|
| Table 2 to Subpart Cof Part 60
--Nitrogen Oxides Limits for Existing Designated Facilities Included in an Emissions Averaging Plan at a Municipal Waste Combustor Plant |
|
Subpart CC--EMISSION GUIDELINES AND COMPLIANCE TIMES FOR MUNICIPAL SOLID WASTE LANDFILLS
|
| Emission guidelines for municipal solid waste landfill emissions. |
|
|
| Test methods and procedures. |
|
|
| Reporting and recordkeeping guidelines. |
|
Subpart CD--EMISSIONS GUIDELINES AND COMPLIANCE TIMES FOR SULFURIC ACID PRODUCTION UNITS
Subpart CE--EMISSION GUIDELINES AND COMPLIANCE TIMES FOR HOSPITAL/MEDICAL/INFECTIOUS WASTE INCINERATORS
|
| Operator training and qualification guidelines. |
|
|
| Waste management guidelines. |
|
|
| Compliance, performance testing, and monitoring guidelines. |
|
|
| Reporting and recordkeeping guidelines. |
|
Subpart D--STANDARDS OF PERFORMANCE FOR FOSSIL-FUEL-FIRED STEAM GENERATORS FOR WHICH CONSTRUCTION IS COMMENCED AFTER AUGUST 17, 1971
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter (PM). |
|
|
| Standard for sulfur dioxide (SO2). |
|
|
| Standard for nitrogen oxides (NO). |
|
|
| Emissions and fuel monitoring. |
|
|
| Test methods and procedures. |
|
Subpart DA--STANDARDS OF PERFORMANCE FOR ELECTRIC UTILITY STEAM GENERATING UNITS FOR WHICH CONSTRUCTION IS COMMENCED AFTER SEPTEMBER 18, 1978
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter (PM). |
|
|
| Standard for sulfur dioxide (SO2). |
|
|
| Standard for nitrogen oxides (NO). |
|
|
| Standard for mercury (Hg). |
|
|
| Commercial demonstration permit. |
|
|
| Compliance determination procedures and methods. |
|
|
| Recordkeeping requirements. |
|
Subpart DB--STANDARDS OF PERFORMANCE FOR INDUSTRIAL-COMMERCIAL-INSTITUTIONAL STEAM GENERATING UNITS
|
| Applicability and delegation of authority. |
|
|
| Standard for sulfur dioxide (SO2). |
|
|
| Standard for particulate matter (PM). |
|
|
| Standard for nitrogen oxides (NO). |
|
|
| Compliance and performance test methods and procedures for sulfur dioxide. |
|
|
| Compliance and performance test methods and procedures for particulate matter and nitrogen oxides. |
|
|
| Emission monitoring for sulfur dioxide. |
|
|
| Emission monitoring for particulate matter and nitrogen oxides. |
|
|
| Reporting and recordkeeping requirements. |
|
Subpart DC--STANDARDS OF PERFORMANCE FOR SMALL INDUSTRIAL-COMMERCIAL-INSTITUTIONAL STEAM GENERATING UNITS
|
| Applicability and delegation of authority. |
|
|
| Standard for sulfur dioxide (SO2). |
|
|
| Standard for particulate matter (PM). |
|
|
| Compliance and performance test methods and procedures for sulfur dioxide. |
|
|
| Compliance and performance test methods and procedures for particulate matter. |
|
|
| Emission monitoring for sulfur dioxide. |
|
|
| Emission monitoring for particulate matter. |
|
|
| Reporting and recordkeeping requirements. |
|
Subpart E--STANDARDS OF PERFORMANCE FOR INCINERATORS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart EA--STANDARDS OF PERFORMANCE FOR MUNICIPAL WASTE COMBUSTORS FOR WHICH CONSTRUCTION IS COMMENCED AFTER DECEMBER 20, 1989 AND ON OR BEFORE SEPTEMBER 20, 1994
|
| Applicability and delegation of authority. |
|
|
| Standard for municipal waste combustor metals. |
|
|
| Standard for municipal waste combustor organics. |
|
|
| Standard for municipal waste combustor acid gases. |
|
|
| Standard for nitrogen oxides. |
|
|
| Standards for municipal waste combustor operating practices. |
|
|
| Compliance and performance testing. |
|
|
| Reporting and recordkeeping requirements. |
|
Subpart EB--STANDARDS OF PERFORMANCE FOR LARGE MUNICIPAL WASTE COMBUSTORS FOR WHICH CONSTRUCTION IS COMMENCED AFTER SEPTEMBER 20, 1994 OR FOR WHICH MODIFICATION OR RECONSTRUCTION IS COMMENCED AFTER JUNE 19, 1996
|
| Applicability and delegation of authority. |
|
|
| Standards for municipal waste combustor metals, acid gases, organics, and nitrogen oxides. |
|
|
| Standards for municipal waste combustor operating practices. |
|
|
| Standards for municipal waste combustor operator training and certification. |
|
|
| Standards for municipal waste combustor fugitive ash emissions. |
|
|
| Standards for air curtain incinerators. |
|
|
| Compliance and performance testing. |
|
|
| Reporting and recordkeeping requirements. |
|
Subpart EC--STANDARDS OF PERFORMANCE FOR HOSPITAL/MEDICAL/INFECTIOUS WASTE INCINERATORS FOR WHICH CONSTRUCTION IS COMMENCED AFTER JUNE 20, 1996
|
| Applicability and delegation of authority. |
|
|
| Operator training and qualification requirements. |
|
|
| Compliance and performance testing. |
|
|
| Reporting and recordkeeping requirements. |
|
Subpart F--STANDARDS OF PERFORMANCE FOR PORTLAND CEMENT PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
|
| Recordkeeping and reporting requirements. |
|
Subpart G--STANDARDS OF PERFORMANCE FOR NITRIC ACID PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standard for nitrogen oxides. |
|
|
| Test methods and procedures. |
|
Subpart H--STANDARDS OF PERFORMANCE FOR SULFURIC ACID PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standard for sulfur dioxide. |
|
|
| Test methods and procedures. |
|
Subpart I--STANDARDS OF PERFORMANCE FOR HOT MIX ASPHALT FACILITIES
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Test methods and procedures. |
|
Subpart J--STANDARDS OF PERFORMANCE FOR PETROLEUM REFINERIES
|
| Applicability, designation of affected facility, and reconstruction. |
|
|
| Standard for particulate matter. |
|
|
| Standard for carbon monoxide. |
|
|
| Standards for sulfur oxides. |
|
|
| Monitoring of emissions and operations. |
|
|
| Test methods and procedures. |
|
|
| Reporting and recordkeeping requirements. |
|
|
| Performance test and compliance provisions. |
|
Subpart JA--STANDARDS OF PERFORMANCE FOR PETROLEUM REFINERIES FOR WHICH CONSTRUCTION, RECONSTRUCTION, OR MODIFICATION COMMENCED AFTER MAY 14, 2007
|
| Applicability, designation of affected facility, and reconstruction. |
|
|
| Monitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). |
|
|
| Monitoring of emissions and operations for sulfur recovery plants. |
|
|
| Monitoring of emissions and operations for fuel gas combustion devices. |
|
|
| Recordkeeping and reporting requirements. |
|
Subpart K--STANDARDS OF PERFORMANCE FOR STORAGE VESSELS FOR PETROLEUM LIQUIDS FOR WHICH CONSTRUCTION, RECONSTRUCTION, OR MODIFICATION COMMENCED AFTER JUNE 11, 1973, AND PRIOR TO MAY 19, 1978
|
| Applicability and designation of affected facility. |
|
|
| Standard for volatile organic compounds (VOC). |
|
|
| Monitoring of operations. |
|
Subpart KA--STANDARDS OF PERFORMANCE FOR STORAGE VESSELS FOR PETROLEUM LIQUIDS FOR WHICH CONSTRUCTION, RECONSTRUCTION, OR MODIFICATION COMMENCED AFTER MAY 18, 1978, AND PRIOR TO JULY 23, 1984
|
| Applicability and designation of affected facility. |
|
|
| Standard for volatile organic compounds (VOC). |
|
|
| Alternative means of emission limitation. |
|
|
| Monitoring of operations. |
|
Subpart KB--STANDARDS OF PERFORMANCE FOR VOLATILE ORGANIC LIQUID STORAGE VESSELS (INCLUDING PETROLEUM LIQUID STORAGE VESSELS) FOR WHICH CONSTRUCTION, RECONSTRUCTION, OR MODIFICATION COMMENCED AFTER JULY 23, 1984
|
| Applicability and designation of affected facility. |
|
|
| Standard for volatile organic compounds (VOC). |
|
|
| Alternative means of emission limitation. |
|
|
| Reporting and recordkeeping requirements. |
|
|
| Monitoring of operations. |
|
Subpart L--STANDARDS OF PERFORMANCE FOR SECONDARY LEAD SMELTERS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Test methods and procedures. |
|
Subpart M--STANDARDS OF PERFORMANCE FOR SECONDARY BRASS AND BRONZE PRODUCTION PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Test methods and procedures. |
|
Subpart N--STANDARDS OF PERFORMANCE FOR PRIMARY EMISSIONS FROM BASIC OXYGEN PROCESS FURNACES FOR WHICH CONSTRUCTION IS COMMENCED AFTER JUNE 11, 1973
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart NA--STANDARDS OF PERFORMANCE FOR SECONDARY EMISSIONS FROM BASIC OXYGEN PROCESS STEELMAKING FACILITIES FOR WHICH CONSTRUCTION IS COMMENCED AFTER JANUARY 20, 1983
|
| Applicability and designation of affected facilities. |
|
|
| Standards for particulate matter. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart O--STANDARDS OF PERFORMANCE FOR SEWAGE TREATMENT PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart P--STANDARDS OF PERFORMANCE FOR PRIMARY COPPER SMELTERS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Standard for sulfur dioxide. |
|
|
| Standard for visible emissions. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart Q--STANDARDS OF PERFORMANCE FOR PRIMARY ZINC SMELTERS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Standard for sulfur dioxide. |
|
|
| Standard for visible emissions. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart R--STANDARDS OF PERFORMANCE FOR PRIMARY LEAD SMELTERS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Standard for sulfur dioxide. |
|
|
| Standard for visible emissions. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart S--STANDARDS OF PERFORMANCE FOR PRIMARY ALUMINUM REDUCTION PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standard for visible emissions. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart T--STANDARDS OF PERFORMANCE FOR THE PHOSPHATE FERTILIZER INDUSTRY: WET-PROCESS PHOSPHORIC ACID PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart U--STANDARDS OF PERFORMANCE FOR THE PHOSPHATE FERTILIZER INDUSTRY: SUPERPHOSPHORIC ACID PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart V--STANDARDS OF PERFORMANCE FOR THE PHOSPHATE FERTILIZER INDUSTRY: DIAMMONIUM PHOSPHATE PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart W--STANDARDS OF PERFORMANCE FOR THE PHOSPHATE FERTILIZER INDUSTRY: TRIPLE SUPERPHOSPHATE PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart X--STANDARDS OF PERFORMANCE FOR THE PHOSPHATE FERTILIZER INDUSTRY: GRANULAR TRIPLE SUPERPHOSPHATE STORAGE FACILITIES
|
| Applicability and designation of affected facility. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart Y--STANDARDS OF PERFORMANCE FOR COAL PREPARATION AND PROCESSING PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standards for thermal dryers. |
|
|
| Standards for pneumatic coal-cleaning equipment. |
|
|
| Standards for coal processing and conveying equipment, coal storage systems, transfer and loading systems, and open storage piles. |
|
|
| Performance tests and other compliance requirements. |
|
|
| Continuous monitoring requirements. |
|
|
| Test methods and procedures. |
|
|
| Reporting and recordkeeping. |
|
Subpart Z--STANDARDS OF PERFORMANCE FOR FERROALLOY PRODUCTION FACILITIES
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Standard for carbon monoxide. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart AA--STANDARDS OF PERFORMANCE FOR STEEL PLANTS: ELECTRIC ARC FURNACES CONSTRUCTED AFTER OCTOBER 21, 1974, AND ON OR BEFORE AUGUST 17, 1983
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
|
| Recordkeeping and reporting requirements. |
|
Subpart AAA--STANDARDS OF PERFORMANCE FOR STEEL PLANTS: ELECTRIC ARC FURNACES AND ARGON-OXYGEN DECARBURIZATION VESSELS CONSTRUCTED AFTER AUGUST 17, 1983
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
|
| Recordkeeping and reporting requirements. |
|
Subpart BB--STANDARDS OF PERFORMANCE FOR KRAFT PULP MILLS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Standard for total reduced sulfur (TRS). |
|
|
| Monitoring of emissions and operations. |
|
|
| Test methods and procedures. |
|
Subpart CC--STANDARDS OF PERFORMANCE FOR GLASS MANUFACTURING PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standards for particulate matter. |
|
|
| Standards for particulate matter from glass melting furnace with modified-processes. |
|
|
| Test methods and procedures. |
|
Subpart DD--STANDARDS OF PERFORMANCE FOR GRAIN ELEVATORS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Test methods and procedures. |
|
Subpart EE--STANDARDS OF PERFORMANCE FOR SURFACE COATING OF METAL FURNITURE
|
| Applicability and designation of affected facility. |
|
|
| Standard for volatile organic compounds (VOC). |
|
|
| Performance tests and compliance provisions. |
|
|
| Monitoring of emissions and operations. |
|
|
| Reporting and recordkeeping requirements. |
|
|
| Test methods and procedures. |
|
Subpart FF--[RESERVED]
Subpart GG--STANDARDS OF PERFORMANCE FOR STATIONARY GAS TURBINES
|
| Applicability and designation of affected facility. |
|
|
| Standard for nitrogen oxides. |
|
|
| Standard for sulfur dioxide. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart HH--STANDARDS OF PERFORMANCE FOR LIME MANUFACTURING PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Monitoring of emissions and operations. |
|
|
| Test methods and procedures. |
|
Subpart KK--STANDARDS OF PERFORMANCE FOR LEAD-ACID BATTERY MANUFACTURING PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Monitoring of emissions and operations. |
|
|
| Test methods and procedures. |
|
Subpart LL--STANDARDS OF PERFORMANCE FOR METALLIC MINERAL PROCESSING PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Monitoring of operations. |
|
|
| Recordkeeping and reporting requirements. |
|
|
| Test methods and procedures. |
|
Subpart MM--STANDARDS OF PERFORMANCE FOR AUTOMOBILE AND LIGHT DUTY TRUCK SURFACE COATING OPERATIONS
|
| Applicability and designation of affected facility. |
|
|
| Standards for volatile organic compounds |
|
|
| Performance test and compliance provisions. |
|
|
| Monitoring of emissions and operations. |
|
|
| Reporting and recordkeeping requirements. |
|
|
| Reference methods and procedures. |
|
|
| Innovative technology waivers. |
|
Subpart NN--STANDARDS OF PERFORMANCE FOR PHOSPHATE ROCK PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Monitoring of emissions and operations. |
|
|
| Test methods and procedures. |
|
Subpart PP--STANDARDS OF PERFORMANCE FOR AMMONIUM SULFATE MANUFACTURE
|
| Applicability and designation of affected facility. |
|
|
| Standards for particulate matter. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart QQ--STANDARDS OF PERFORMANCE FOR THE GRAPHIC ARTS INDUSTRY: PUBLICATION ROTOGRAVURE PRINTING
|
| Applicability and designation of affected facility. |
|
|
| Definitions and notations. |
|
|
| Standard for volatile organic compounds. |
|
|
| Performance test and compliance provisions. |
|
|
| Monitoring of operations and recordkeeping. |
|
|
| Test methods and procedures. |
|
Subpart RR--STANDARDS OF PERFORMANCE FOR PRESSURE SENSITIVE TAPE AND LABEL SURFACE COATING OPERATIONS
|
| Applicability and designation of affected facility. |
|
|
| Standard for volatile organic compounds. |
|
|
| Performance test procedures. |
|
|
| Monitoring of operations and recordkeeping. |
|
|
| Test methods and procedures. |
|
Subpart SS--STANDARDS OF PERFORMANCE FOR INDUSTRIAL SURFACE COATING: LARGE APPLIANCES
|
| Applicability and designation of affected facility. |
|
|
| Standard for volatile organic compounds. |
|
|
| Performance test and compliance provisions. |
|
|
| Monitoring of emissions and operations. |
|
|
| Reporting and recordkeeping requirements. |
|
|
| Test methods and procedures. |
|
Subpart TT--STANDARDS OF PERFORMANCE FOR METAL COIL SURFACE COATING
|
| Applicability and designation of affected facility. |
|
|
| Standards for volatile organic compounds. |
|
|
| Performance test and compliance provisions. |
|
|
| Monitoring of emissions and operations. |
|
|
| Reporting and recordkeeping requirements. |
|
|
| Test methods and procedures. |
|
Subpart UU--STANDARDS OF PERFORMANCE FOR ASPHALT PROCESSING AND ASPHALT ROOFING MANUFACTURE
|
| Applicability and designation of affected facilities. |
|
|
| Standards for particulate matter. |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
Subpart VV--STANDARDS OF PERFORMANCE FOR EQUIPMENT LEAKS OF VOC IN THE SYNTHETIC ORGANIC CHEMICALS MANUFACTURING INDUSTRY FOR WHICH CONSTRUCTION, RECONSTRUCTION, OR MODIFICATION COMMENCED AFTER JANUARY 5, 1981, AND ON OR BEFORE NOVEMBER 7, 2006
|
| Applicability and designation of affected facility. |
|
|
| Standards: Pumps in light liquid service. |
|
|
| Standards: Pressure relief devices in gas/vapor service. |
|
|
| Standards: Sampling connection systems. |
|
|
| Standards: Open-ended valves or lines. |
|
|
| Standards: Valves in gas/vapor service and in light liquid service. |
|
|
| Standards: Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service, and connectors. |
|
|
| Standards: Delay of repair. |
|
|
| Standards: Closed vent systems and control devices. |
|
|
| Alternative standards for valves--allowable percentage of valves leaking. |
|
|
| Alternative standards for valves--skip period leak detection and repair. |
|
|
| Equivalence of means of emission limitation. |
|
|
| Test methods and procedures. |
|
|
| Recordkeeping requirements. |
|
|
| List of chemicals produced by affected facilities. |
|
Subpart VVA--STANDARDS OF PERFORMANCE FOR EQUIPMENT LEAKS OF VOC IN THE SYNTHETIC ORGANIC CHEMICALS MANUFACTURING INDUSTRY FOR WHICH CONSTRUCTION, RECONSTRUCTION, OR MODIFICATION COMMENCED AFTER NOVEMBER 7, 2006
|
| Applicability and designation of affected facility. |
|
|
| Standards: Pumps in light liquid service. |
|
|
| Standards: Pressure relief devices in gas/vapor service. |
|
|
| Standards: Sampling connection systems. |
|
|
| Standards: Open-ended valves or lines. |
|
|
| Standards: Valves in gas/vapor service and in light liquid service. |
|
|
| Standards: Pumps, valves, and connectors in heavy liquid service and pressure relief devices in light liquid or heavy liquid service. |
|
|
| Standards: Delay of repair. |
|
|
| Standards: Closed vent systems and control devices. |
|
|
| Standards: Connectors in gas/vapor service and in light liquid service. |
|
|
| Alternative standards for valves--allowable percentage of valves leaking. |
|
|
| Alternative standards for valves--skip period leak detection and repair. |
|
|
| Equivalence of means of emission limitation. |
|
|
| Test methods and procedures. |
|
|
| Recordkeeping requirements. |
|
|
| List of chemicals produced by affected facilities. |
|
Subpart WW--STANDARDS OF PERFORMANCE FOR THE BEVERAGE CAN SURFACE COATING INDUSTRY
|
| Applicability and designation of affected facility. |
|
|
| Standards for volatile organic compounds. |
|
|
| Performance test and compliance provisions. |
|
|
| Monitoring of emissions and operations |
|
|
| Reporting and recordkeeping requirements. |
|
|
| Test methods and procedures. |
|
Subpart XX--STANDARDS OF PERFORMANCE FOR BULK GASOLINE TERMINALS
|
| Applicability and designation of affected facility. |
|
|
| Standard for Volatile Organic Compound (VOC) emissions from bulk gasoline terminals. |
|
|
| Test methods and procedures. |
|
|
| Reporting and recordkeeping. |
|
Subpart AAA--STANDARDS OF PERFORMANCE FOR NEW RESIDENTIAL WOOD HEATERS
|
| Applicability and designation of affected facility. |
|
|
| Standards for particulate matter. |
|
|
| Compliance and certification. |
|
|
| Test methods and procedures. |
|
|
| Laboratory accreditation. |
|
|
| Permanent label, temporary label, and owner's manual. |
|
|
| Reporting and recordkeeping. |
|
|
| Hearing and appeal procedures. |
|
|
| General provisions exclusions. |
|
Subpart BBB--STANDARDS OF PERFORMANCE FOR THE RUBBER TIRE MANUFACTURING INDUSTRY
|
| Applicability and designation of affected facilities. |
|
|
| Standards for volatile organic compounds. |
|
|
| Alternate standard for volatile organic compounds. |
|
|
| Performance test and compliance provisions. |
|
|
| Monitoring of operations. |
|
|
| Recordkeeping requirements. |
|
|
| Test methods and procedures. |
|
Subpart CCC--[RESERVED]
Subpart DDD--STANDARDS OF PERFORMANCE FOR VOLATILE ORGANIC COMPOUND (VOC) EMISSIONS FROM THE POLYMER MANUFACTURING INDUSTRY
|
| Applicability and designation of affected facilities. |
|
|
| Standards: Process emissions. |
|
|
| Standards: Equipment leaks of VOC. |
|
|
| Test methods and procedures. |
|
|
| Reporting and recordkeeping requirements. |
|
Subpart EEE--[RESERVED]
Subpart FFF--STANDARDS OF PERFORMANCE FOR FLEXIBLE VINYL AND URETHANE COATING AND PRINTING
|
| Applicability and designation of affected facility. |
|
|
| Standard for volatile organic compounds. |
|
|
| Test methods and procedures. |
|
|
| Monitoring of operations and recordkeeping requirements. |
|
Subpart GGG--STANDARDS OF PERFORMANCE FOR EQUIPMENT LEAKS OF VOC IN PETROLEUM REFINERIES FOR WHICH CONSTRUCTION, RECONSTRUCTION, OR MODIFICATION COMMENCED AFTER JANUARY 4, 1983, AND ON OR BEFORE NOVEMBER 7, 2006
|
| Applicability and designation of affected facility. |
|
Subpart GGGA--STANDARDS OF PERFORMANCE FOR EQUIPMENT LEAKS OF VOC IN PETROLEUM REFINERIES FOR WHICH CONSTRUCTION, RECONSTRUCTION, OR MODIFICATION COMMENCED AFTER NOVEMBER 7, 2006
|
| Applicability and designation of affected facility. |
|
Subpart HHH--STANDARDS OF PERFORMANCE FOR SYNTHETIC FIBER PRODUCTION FACILITIES
|
| Applicability and designation of affected facility. |
|
|
| Standard for volatile organic compounds. |
|
|
| Performance test and compliance provisions. |
|
Subpart III--STANDARDS OF PERFORMANCE FOR VOLATILE ORGANIC COMPOUND (VOC) EMISSIONS FROM THE SYNTHETIC ORGANIC CHEMICAL MANUFACTURING INDUSTRY (SOCMI) AIR OXIDATION UNIT PROCESSES
|
| Applicability and designation of affected facility. |
|
|
| Monitoring of emissions and operations. |
|
|
| Test methods and procedures. |
|
|
| Reporting and recordkeeping requirements. |
|
|
| Chemicals affected by subpart III. |
|
Subpart JJJ--STANDARDS OF PERFORMANCE FOR PETROLEUM DRY CLEANERS
|
| Applicability and designation of affected facility. |
|
|
| Standards for volatile organic compounds. |
|
|
| Equivalent equipment and procedures. |
|
|
| Test methods and procedures. |
|
|
| Recordkeeping requirements. |
|
Subpart KKK--STANDARDS OF PERFORMANCE FOR EQUIPMENT LEAKS OF VOC FROM ONSHORE NATURAL GAS PROCESSING PLANTS.
|
| Applicability and designation of affected facility. |
|
|
| Alternative means of emission limitation. |
|
|
| Recordkeeping requirements. |
|
Subpart LLL--STANDARDS OF PERFORMANCE FOR ONSHORE NATURAL GAS PROCESSING: SO2 EMISSIONS
|
| Applicability and designation of affected facilities. |
|
|
| Standards for sulfur dioxide. |
|
|
| Test methods and procedures. |
|
|
| Monitoring of emissions and operations. |
|
|
| Recordkeeping and reporting requirements. |
|
|
| Optional procedure for measuring hydrogen sulfide in acid gas--Tutwiler Procedure. |
|
Subpart MMM--[RESERVED]
Subpart NNN--STANDARDS OF PERFORMANCE FOR VOLATILE ORGANIC COMPOUND (VOC) EMISSIONS FROM SYNTHETIC ORGANIC CHEMICAL MANUFACTURING INDUSTRY (SOCMI) DISTILLATION OPERATIONS
|
| Applicability and designation of affected facility. |
|
|
| Monitoring of emissions and operations. |
|
|
| Test methods and procedures. |
|
|
| Reporting and recordkeeping requirements. |
|
|
| Chemicals affected by subpart NNN. |
|
Subpart OOO--STANDARDS OF PERFORMANCE FOR NONMETALLIC MINERAL PROCESSING PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter (PM). |
|
|
| Monitoring of operations. |
|
|
| Test methods and procedures. |
|
|
| Reporting and recordkeeping. |
|
Subpart PPP--STANDARD OF PERFORMANCE FOR WOOL FIBERGLASS INSULATION MANUFACTURING PLANTS
|
| Applicability and designation of affected facility. |
|
|
| Standard for particulate matter. |
|
|
| Monitoring of operations. |
|
|
| Recordkeeping and reporting requirements. |
|
|
| Test methods and procedures. |
|
Subpart QQQ--STANDARDS OF PERFORMANCE FOR VOC EMISSIONS FROM PETROLEUM REFINERY WASTEWATER SYSTEMS
|
| Applicability and designation of affected facility. |
|
|
| Standards: Individual drain systems. |
|
|
| Standards: Oil-water separators. |
|
|
| Standards: Aggregate facility. |
|
|
| Standards: Closed vent systems and control devices. |
|
|
| Standards: Delay of repair. |
|
|
| Standards: Delay of compliance. |
|
|
| Alternative standards for individual drain systems. |
|
|
| Alternative standards for oil-water separators. |
|
|
| Permission to use alternative means of emission limitation. |
|
|
| Monitoring of operations. |
|
|
| Performance test methods and procedures and compliance provisions. |
|
|
| Recordkeeping requirements. |
|
Subpart RRR--STANDARDS OF PERFORMANCE FOR VOLATILE ORGANIC COMPOUND EMISSIONS FROM SYNTHETIC ORGANIC CHEMICAL MANUFACTURING INDUSTRY (SOCMI) REACTOR PROCESSES
|
| Applicability and designation of affected facility. |
|
|
| Monitoring of emissions and operations. |
|
|
| Test methods and procedures. |
|
|
| Reporting and recordkeeping requirements. |
|
|
| Chemicals affected by subpart RRR. |
|
Subpart SSS--STANDARDS OF PERFORMANCE FOR MAGNETIC TAPE COATING FACILITIES
|
| Applicability and designation of affected facility. |
|
|
| Definitions, symbols, and cross reference tables. |
|
|
| Standards for volatile organic compounds. |
|
|
| Installation of monitoring devices and recordkeeping. |
|
|
| Test methods and procedures. |
|
|
| Permission to use alternative means of emission limitation. |
|
|
| Reporting and monitoring requirements. |
|
Subpart TTT--STANDARDS OF PERFORMANCE FOR INDUSTRIAL SURFACE COATING: SURFACE COATING OF PLASTIC PARTS FOR BUSINESS MACHINES
|
| Applicability and designation of affected facility. |
|
|
| Standards for volatile organic compounds. |
|
|
| Performance tests and compliance provisions. |
|
|
| Reporting and recordkeeping requirements. |
|
|
| Test methods and procedures. |
|
Subpart UUU--STANDARDS OF PERFORMANCE FOR CALCINERS AND DRYERS IN MINERAL INDUSTRIES
|
| Applicability and designation of affected facility. |
|
|
| Standards for particulate matter. |
|
|
| Monitoring of emissions and operations. |
|
|
| Recordkeeping and reporting requirements. |
|
|
| Test methods and procedures. |
|
Subpart VVV--STANDARDS OF PERFORMANCE FOR POLYMERIC COATING OF SUPPORTING SUBSTRATES FACILITIES
|
| Applicability and designation of affected facility. |
|
|
| Definitions, symbols, and cross-reference tables. |
|
|
| Standards for volatile organic compounds. |
|
|
| Test methods and procedures. |
|
|
| Permission to use alternative means of emission limitation. |
|
|
| Reporting and recordkeeping requirements. |
|
Subpart WWW--STANDARDS OF PERFORMANCE FOR MUNICIPAL SOLID WASTE LANDFILLS
|
| Applicability, designation of affected facility, and delegation of authority. |
|
|
| Standards for air emissions from municipal solid waste landfills. |
|
|
| Operational standards for collection and control systems. |
|
|
| Test methods and procedures. |
|
|
| Monitoring of operations. |
|
|
| Recordkeeping requirements. |
|
|
| Specifications for active collection systems. |
|
Subpart AAAA--STANDARDS OF PERFORMANCE FOR SMALL MUNICIPAL WASTE COMBUSTION UNITS FOR WHICH CONSTRUCTION IS COMMENCED AFTER AUGUST 30, 1999 OR FOR WHICH MODIFICATION OR RECONSTRUCTION IS COMMENCED AFTER JUNE 6, 2001
|
| What does this subpart do? |
|
|
| When does this subpart become effective? |
|
|
| Does this subpart apply to my municipal waste combustion unit? |
|
|
| What is a new municipal waste combustion unit? |
|
|
| Does this subpart allow any exemptions? |
|
|
| Do subpart E new source performance standards also apply to my municipal waste combustion unit? |
|
|
| Can the Administrator delegate authority to enforce these Federal new source performance standards to a State agency? |
|
|
| How are these new source performance standards structured? |
|
|
| Do all five components of these new source performance standards apply at the same time? |
|
|
| Are there different subcategories of small municipal waste combustion units within this subpart? |
|
|
| Who must submit a materials separation plan? |
|
|
| What is a materials separation plan? |
|
|
| What steps must I complete for my materials separation plan? |
|
|
| What must I include in my draft materials separation plan? |
|
|
| How do I make my draft materials separation plan available to the public? |
|
|
| When must I accept comments on the materials separation plan? |
|
|
| Where and when must I hold a public meeting on my draft materials separation plan? |
|
|
| What must I do with any public comments I receive during the public comment period on my draft materials separation plan? |
|
|
| What must I do with my revised materials separation plan? |
|
|
| What must I include in the public meeting on my revised materials separation plan? |
|
|
| What must I do with any public comments I receive on my revised materials separation plan? |
|
|
| How do I submit my final materials separation plan? |
|
|
| Who must submit a siting analysis? |
|
|
| What is a siting analysis? |
|
|
| What steps must I complete for my siting analysis? |
|
|
| What must I include in my siting analysis? |
|
|
| How do I make my siting analysis available to the public? |
|
|
| When must I accept comments on the siting analysis and revised materials separation plan? |
|
|
| Where and when must I hold a public meeting on the siting analysis? |
|
|
| What must I do with any public comments I receive during the public comment period on my siting analysis? |
|
|
| How do I submit my siting analysis? |
|
|
| What types of training must I do? |
|
|
| Who must complete the operator training course? By when? |
|
|
| Who must complete the plant-specific training course? |
|
|
| What plant-specific training must I provide? |
|
|
| What information must I include in the plant-specific operating manual? |
|
|
| Where must I keep the plant-specific operating manual? |
|
|
| What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it? |
|
|
| After the required date for operator certification, who may operate the municipal waste combustion unit? |
|
|
| What if all the certified operators must be temporarily offsite? |
|
|
| What are the operating practice requirements for my municipal waste combustion unit? |
|
|
| What happens to the operating requirements during periods of startup, shutdown, and malfunction? |
|
|
| What pollutants are regulated by this subpart? |
|
|
| What emission limits must I meet? By when? |
|
|
| What happens to the emission limits during periods of startup, shutdown, and malfunction? |
|
|
| What types of continuous emission monitoring must I perform? |
|
|
| What continuous emission monitoring systems must I install for gaseous pollutants? |
|
|
| How are the data from the continuous emission monitoring systems used? |
|
|
| How do I make sure my continuous emission monitoring systems are operating correctly? |
|
|
| Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission monitoring systems? |
|
|
| What is my schedule for evaluating continuous emission monitoring systems? |
|
|
| What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas? |
|
|
| What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is the data collection requirement enforceable? |
|
|
| How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units? |
|
|
| What is required for my continuous opacity monitoring system and how are the data used? |
|
|
| What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? |
|
|
| What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements? |
|
|
| What types of stack tests must I conduct? |
|
|
| How are the stack test data used? |
|
|
| What schedule must I follow for the stack testing? |
|
|
| What test methods must I use to stack test? |
|
|
| May I conduct stack testing less often? |
|
|
| May I deviate from the 13-month testing schedule if unforeseen circumstances arise? |
|
|
| Must I meet other requirements for continuous monitoring? |
|
|
| How do I monitor the load of my municipal waste combustion unit? |
|
|
| How do I monitor the temperature of flue gases at the inlet of my particulate matter control device? |
|
|
| How do I monitor the injection rate of activated carbon? |
|
|
| What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems and is the data collection requirement enforceable? |
|
|
| What records must I keep? |
|
|
| Where must I keep my records and for how long? |
|
|
| What records must I keep for the materials separation plan and siting analysis? |
|
|
| What records must I keep for operator training and certification? |
|
|
| What records must I keep for stack tests? |
|
|
| What records must I keep for continuously monitored pollutants or parameters? |
|
|
| What records must I keep for municipal waste combustion units that use activated carbon? |
|
|
| What reports must I submit before I submit my notice of construction? |
|
|
| What must I include in my notice of construction? |
|
|
| What reports must I submit after I submit my notice of construction and in what form? |
|
|
| What are the appropriate units of measurement for reporting my data? |
|
|
| When must I submit the initial report? |
|
|
| What must I include in my initial report? |
|
|
| When must I submit the annual report? |
|
|
| What must I include in my annual report? |
|
|
| What must I do if I am out of compliance with the requirements of this subpart? |
|
|
| If a semiannual report is required, when must I submit it? |
|
|
| What must I include in the semiannual out-of-compliance reports? |
|
|
| Can reporting dates be changed? |
|
|
| What is an air curtain incinerator? |
|
|
| What are the emission limits for air curtain incinerators that burn 100 percent yard waste? |
|
|
| How must I monitor opacity for air curtain incinerators that burn 100 percent yard waste? |
|
|
| What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent yard waste? |
|
|
| What equations must I use? |
|
|
| What definitions must I know? |
|
Subpart BBBB--EMISSION GUIDELINES AND COMPLIANCE TIMES FOR SMALL MUNICIPAL WASTE COMBUSTION UNITS CONSTRUCTED ON OR BEFORE AUGUST 30, 1999
|
| What is the purpose of this subpart? |
|
|
| Am I affected by this subpart? |
|
|
| Is a State plan required for all States? |
|
|
| What must I include in my State plan? |
|
|
| Is there an approval process for my State plan? |
|
|
| What if my State plan is not approvable? |
|
|
| Is there an approval process for a negative declaration letter? |
|
|
| What compliance schedule must I include in my State plan? |
|
|
| Are there any State plan requirements for this subpart that supersede the requirements specified in subpart B? |
|
|
| Does this subpart directly affect municipal waste combustion unit owners and operators in my State? |
|
|
| What municipal waste combustion units must I address in my State plan? |
|
|
| Are any small municipal waste combustion units exempt from my State plan? |
|
|
| Can an affected municipal waste combustion unit reduce its capacity to less than 35 tons per day rather than comply with my State plan? |
|
|
| What subcategories of small municipal waste combustion units must I include in my State plan? |
|
|
| What is the ''model rule'' in this subpart? |
|
|
| How does the model rule relate to the required elements of my State plan? |
|
|
| What are the principal components of the model rule? |
|
|
| What are my requirements for meeting increments of progress and achieving final compliance? |
|
|
| When must I complete each increment of progress? |
|
|
| What must I include in the notifications of achievement of my increments of progress? |
|
|
| When must I submit the notifications of achievement of increments of progress? |
|
|
| What if I do not meet an increment of progress? |
|
|
| How do I comply with the increment of progress for submittal of a control plan? |
|
|
| How do I comply with the increment of progress for awarding contracts? |
|
|
| How do I comply with the increment of progress for initiating onsite construction? |
|
|
| How do I comply with the increment of progress for completing onsite construction? |
|
|
| How do I comply with the increment of progress for achieving final compliance? |
|
|
| What must I do if I close my municipal waste combustion unit and then restart my municipal waste combustion unit? |
|
|
| What must I do if I plan to permanently close my municipal waste combustion unit and not restart it? |
|
|
| What types of training must I do? |
|
|
| Who must complete the operator training course? By when? |
|
|
| Who must complete the plant-specific training course? |
|
|
| What plant-specific training must I provide? |
|
|
| What information must I include in the plant-specific operating manual? |
|
|
| Where must I keep the plant-specific operating manual? |
|
|
| What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it? |
|
|
| After the required date for operator certification, who may operate the municipal waste combustion unit? |
|
|
| What if all the certified operators must be temporarily offsite? |
|
|
| What are the operating practice requirements for my municipal waste combustion unit? |
|
|
| What happens to the operating requirements during periods of startup, shutdown, and malfunction? |
|
|
| What pollutants are regulated by this subpart? |
|
|
| What emission limits must I meet? By when? |
|
|
| What happens to the emission limits during periods of startup, shutdown, and malfunction? |
|
|
| What types of continuous emission monitoring must I perform? |
|
|
| What continuous emission monitoring systems must I install for gaseous pollutants? |
|
|
| How are the data from the continuous emission monitoring systems used? |
|
|
| How do I make sure my continuous emission monitoring systems are operating correctly? |
|
|
| Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission monitoring systems? |
|
|
| What is my schedule for evaluating continuous emission monitoring systems? |
|
|
| What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas? |
|
|
| What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is the data collection requirement enforceable? |
|
|
| How do I convert my 1-hour arithmetic averages into appropriate averaging times and units? |
|
|
| What is required for my continuous opacity monitoring system and how are the data used? |
|
|
| What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? |
|
|
| What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements? |
|
|
| What types of stack tests must I conduct? |
|
|
| How are the stack test data used? |
|
|
| What schedule must I follow for the stack testing? |
|
|
| What test methods must I use to stack test? |
|
|
| May I conduct stack testing less often? |
|
|
| May I deviate from the 13-month testing schedule if unforeseen circumstances arise? |
|
|
| Must I meet other requirements for continuous monitoring? |
|
|
| How do I monitor the load of my municipal waste combustion unit? |
|
|
| How do I monitor the temperature of flue gases at the inlet of my particulate matter control device? |
|
|
| How do I monitor the injection rate of activated carbon? |
|
|
| What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems and is the data collection requirement enforceable? |
|
|
| What records must I keep? |
|
|
| Where must I keep my records and for how long? |
|
|
| What records must I keep for operator training and certification? |
|
|
| What records must I keep for stack tests? |
|
|
| What records must I keep for continuously monitored pollutants or parameters? |
|
|
| What records must I keep for municipal waste combustion units that use activated carbon? |
|
|
| What reports must I submit and in what form? |
|
|
| What are the appropriate units of measurement for reporting my data? |
|
|
| When must I submit the initial report? |
|
|
| What must I include in my initial report? |
|
|
| When must I submit the annual report? |
|
|
| What must I include in my annual report? |
|
|
| What must I do if I am out of compliance with the requirements of this subpart? |
|
|
| If a semiannual report is required, when must I submit it? |
|
|
| What must I include in the semiannual out-of-compliance reports? |
|
|
| Can reporting dates be changed? |
|
|
| What is an air curtain incinerator? |
|
|
| What are the emission limits for air curtain incinerators that burn 100 percent yard waste? |
|
|
| How must I monitor opacity for air curtain incinerators that burn 100 percent yard waste? |
|
|
| What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent yard waste? |
|
|
| What equations must I use? |
|
|
| What definitions must I know? |
|
Subpart CCCC--STANDARDS OF PERFORMANCE FOR COMMERCIAL AND INDUSTRIAL SOLID WASTE INCINERATION UNITS FOR WHICH CONSTRUCTION IS COMMENCED AFTER NOVEMBER 30, 1999 OR FOR WHICH MODIFICATION OR RECONSTRUCTION IS COMMENCED ON OR AFTER JUNE 1, 2001
|
| What does this subpart do? |
|
|
| When does this subpart become effective? |
|
|
| Does this subpart apply to my incineration unit? |
|
|
| What is a new incineration unit? |
|
|
| What combustion units are exempt from this subpart? |
|
|
| What if my chemical recovery unit is not listed in 60.2020(n)? |
|
|
| Who implements and enforces this subpart? |
|
|
| How are these new source performance standards structured? |
|
|
| Do all eleven components of these new source performance standards apply at the same time? |
|
|
| Who must prepare a siting analysis? |
|
|
| What is a siting analysis? |
|
|
| What is a waste management plan? |
|
|
| When must I submit my waste management plan? |
|
|
| What should I include in my waste management plan? |
|
|
| What are the operator training and qualification requirements? |
|
|
| When must the operator training course be completed? |
|
|
| How do I obtain my operator qualification? |
|
|
| How do I maintain my operator qualification? |
|
|
| How do I renew my lapsed operator qualification? |
|
|
| What site-specific documentation is required? |
|
|
| What if all the qualified operators are temporarily not accessible? |
|
|
| What emission limitations must I meet and by when? |
|
|
| What operating limits must I meet and by when? |
|
|
| What if I do not use a wet scrubber to comply with the emission limitations? |
|
|
| What happens during periods of startup, shutdown, and malfunction? |
|
|
| How do I conduct the initial and annual performance test? |
|
|
| How are the performance test data used? |
|
|
| How do I demonstrate initial compliance with the emission limitations and establish the operating limits? |
|
|
| By what date must I conduct the initial performance test? |
|
|
| How do I demonstrate continuous compliance with the emission limitations and the operating limits? |
|
|
| By what date must I conduct the annual performance test? |
|
|
| May I conduct performance testing less often? |
|
|
| May I conduct a repeat performance test to establish new operating limits? |
|
|
| What monitoring equipment must I install and what parameters must I monitor? |
|
|
| Is there a minimum amount of monitoring data I must obtain? |
|
|
| What records must I keep? |
|
|
| Where and in what format must I keep my records? |
|
|
| What reports must I submit? |
|
|
| What must I submit prior to commencing construction? |
|
|
| What information must I submit prior to initial startup? |
|
|
| What information must I submit following my initial performance test? |
|
|
| When must I submit my annual report? |
|
|
| What information must I include in my annual report? |
|
|
| What else must I report if I have a deviation from the operating limits or the emission limitations? |
|
|
| What must I include in the deviation report? |
|
|
| What else must I report if I have a deviation from the requirement to have a qualified operator accessible? |
|
|
| Are there any other notifications or reports that I must submit? |
|
|
| In what form can I submit my reports? |
|
|
| Can reporting dates be changed? |
|
|
| Am I required to apply for and obtain a title V operating permit for my unit? |
|
|
| What is an air curtain incinerator? |
|
|
| What are the emission limitations for air curtain incinerators? |
|
|
| How must I monitor opacity for air curtain incinerators? |
|
|
| What are the recordkeeping and reporting requirements for air curtain incinerators? |
|
|
| What definitions must I know? |
|
Subpart DDDD--EMISSIONS GUIDELINES AND COMPLIANCE TIMES FOR COMMERCIAL AND INDUSTRIAL SOLID WASTE INCINERATION UNITS THAT COMMENCED CONSTRUCTION ON OR BEFORE NOVEMBER 30, 1999
|
| What is the purpose of this subpart? |
|
|
| Am I affected by this subpart? |
|
|
| Is a State plan required for all States? |
|
|
| What must I include in my State plan? |
|
|
| Is there an approval process for my State plan? |
|
|
| What if my State plan is not approvable? |
|
|
| Is there an approval process for a negative declaration letter? |
|
|
| What compliance schedule must I include in my State plan? |
|
|
| Are there any State plan requirements for this subpart that apply instead of the requirements specified in subpart B? |
|
|
| Does this subpart directly affect CISWI unit owners and operators in my State? |
|
|
| What CISWI units must I address in my State plan? |
|
|
| What combustion units are exempt from my State plan? |
|
|
| What if a chemical recovery unit is not listed in 60.2555(n)? |
|
|
| What is the ''model rule'' in this subpart? |
|
|
| How does the model rule relate to the required elements of my State plan? |
|
|
| What are the principal components of the model rule? |
|
|
| What are my requirements for meeting increments of progress and achieving final compliance? |
|
|
| When must I complete each increment of progress? |
|
|
| What must I include in the notifications of achievement of increments of progress? |
|
|
| When must I submit the notifications of achievement of increments of progress? |
|
|
| What if I do not meet an increment of progress? |
|
|
| How do I comply with the increment of progress for submittal of a control plan? |
|
|
| How do I comply with the increment of progress for achieving final compliance? |
|
|
| What must I do if I close my CISWI unit and then restart it? |
|
|
| What must I do if I plan to permanently close my CISWI unit and not restart it? |
|
|
| What is a waste management plan? |
|
|
| When must I submit my waste management plan? |
|
|
| What should I include in my waste management plan? |
|
|
| What are the operator training and qualification requirements? |
|
|
| When must the operator training course be completed? |
|
|
| How do I obtain my operator qualification? |
|
|
| How do I maintain my operator qualification? |
|
|
| How do I renew my lapsed operator qualification? |
|
|
| What site-specific documentation is required? |
|
|
| What if all the qualified operators are temporarily not accessible? |
|
|
| What emission limitations must I meet and by when? |
|
|
| What operating limits must I meet and by when? |
|
|
| What if I do not use a wet scrubber to comply with the emission limitations? |
|
|
| What happens during periods of startup, shutdown, and malfunction? |
|
|
| How do I conduct the initial and annual performance test? |
|
|
| How are the performance test data used? |
|
|
| How do I demonstrate initial compliance with the emission limitations and establish the operating limits? |
|
|
| By what date must I conduct the initial performance test? |
|
|
| How do I demonstrate continuous compliance with the emission limitations and the operating limits? |
|
|
| By what date must I conduct the annual performance test? |
|
|
| May I conduct performance testing less often? |
|
|
| May I conduct a repeat performance test to establish new operating limits? |
|
|
| What monitoring equipment must I install and what parameters must I monitor? |
|
|
| Is there a minimum amount of monitoring data I must obtain? |
|
|
| What records must I keep? |
|
|
| Where and in what format must I keep my records? |
|
|
| What reports must I submit? |
|
|
| When must I submit my waste management plan? |
|
|
| What information must I submit following my initial performance test? |
|
|
| When must I submit my annual report? |
|
|
| What information must I include in my annual report? |
|
|
| What else must I report if I have a deviation from the operating limits or the emission limitations? |
|
|
| What must I include in the deviation report? |
|
|
| What else must I report if I have a deviation from the requirement to have a qualified operator accessible? |
|
|
| Are there any other notifications or reports that I must submit? |
|
|
| In what form can I submit my reports? |
|
|
| Can reporting dates be changed? |
|
|
| Am I required to apply for and obtain a title V operating permit for my unit? |
|
|
| What is an air curtain incinerator? |
|
|
| What are my requirements for meeting increments of progress and achieving final compliance? |
|
|
| When must I complete each increment of progress? |
|
|
| What must I include in the notifications of achievement of increments of progress? |
|
|
| When must I submit the notifications of achievement of increments of progress? |
|
|
| What if I do not meet an increment of progress? |
|
|
| How do I comply with the increment of progress for submittal of a control plan? |
|
|
| How do I comply with the increment of progress for achieving final compliance? |
|
|
| What must I do if I close my air curtain incinerator and then restart it? |
|
|
| What must I do if I plan to permanently close my air curtain incinerator and not restart it? |
|
|
| What are the emission limitations for air curtain incinerators? |
|
|
| How must I monitor opacity for air curtain incinerators? |
|
|
| What are the recordkeeping and reporting requirements for air curtain incinerators? |
|
|
| What definitions must I know? |
|
Subpart EEEE--STANDARDS OF PERFORMANCE FOR OTHER SOLID WASTE INCINERATION UNITS FOR WHICH CONSTRUCTION IS COMMENCED AFTER DECEMBER 9, 2004, OR FOR WHICH MODIFICATION OR RECONSTRUCTION IS COMMENCED ON OR AFTER JUNE 16, 2006
|
| What does this subpart do? |
|
|
| When does this subpart become effective? |
|
|
| Does this subpart apply to my incineration unit? |
|
|
| What is a new incineration unit? |
|
|
| What combustion units are excluded from this subpart? |
|
|
| Are air curtain incinerators regulated under this subpart? |
|
|
| Who implements and enforces this subpart? |
|
|
| How are these new source performance standards structured? |
|
|
| Do all components of these new source performance standards apply at the same time? |
|
PRECONSTRUCTION SITING ANALYSIS
|
| Who must prepare a siting analysis? |
|
|
| What is a siting analysis? |
|
|
| What is a waste management plan? |
|
|
| When must I submit my waste management plan? |
|
|
| What should I include in my waste management plan? |
|
OPERATOR TRAINING AND QUALIFICATION
|
| What are the operator training and qualification requirements? |
|
|
| When must the operator training course be completed? |
|
|
| How do I obtain my operator qualification? |
|
|
| How do I maintain my operator qualification? |
|
|
| How do I renew my lapsed operator qualification? |
|
|
| What site-specific documentation is required? |
|
|
| What if all the qualified operators are temporarily not accessible? |
|
|
| What emission limitations must I meet and by when? |
|
|
| What operating limits must I meet and by when? |
|
|
| What if I do not use a wet scrubber to comply with the emission limitations? |
|
|
| What happens during periods of startup, shutdown, and malfunction? |
|
|
| How do I conduct the initial and annual performance test? |
|
|
| How are the performance test data used? |
|
|
| How do I demonstrate initial compliance with the emission limitations and establish the operating limits? |
|
|
| By what date must I conduct the initial performance test? |
|
|
| How do I demonstrate continuous compliance with the emission limitations and the operating limits? |
|
|
| By what date must I conduct the annual performance test? |
|
|
| May I conduct performance testing less often? |
|
|
| May I conduct a repeat performance test to establish new operating limits? |
|
|
| What continuous emission monitoring systems must I install? |
|
|
| How do I make sure my continuous emission monitoring systems are operating correctly? |
|
|
| What is my schedule for evaluating continuous emission monitoring systems? |
|
|
| What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems, and is the data collection requirement enforceable? |
|
|
| How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units? |
|
|
| What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? |
|
|
| Is there a minimum amount of operating parameter monitoring data I must obtain? |
|
|
| What records must I keep? |
|
|
| Where and in what format must I keep my records? |
|
|
| What reports must I submit? |
|
|
| What must I submit prior to commencing construction? |
|
|
| What information must I submit prior to initial startup? |
|
|
| What information must I submit following my initial performance test? |
|
|
| When must I submit my annual report? |
|
|
| What information must I include in my annual report? |
|
|
| What else must I report if I have a deviation from the operating limits or the emission limitations? |
|
|
| What must I include in the deviation report? |
|
|
| What else must I report if I have a deviation from the requirement to have a qualified operator accessible? |
|
|
| Are there any other notifications or reports that I must submit? |
|
|
| In what form can I submit my reports? |
|
|
| Can reporting dates be changed? |
|
|
| Am I required to apply for and obtain a title V operating permit for my unit? |
|
|
| When must I submit a title V permit application for my new unit? |
|
|
| What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery? |
|
|
| What is an air curtain incinerator? |
|
|
| What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
|
|
| How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
|
|
| What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
|
|
| Am I required to apply for and obtain a title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber, and yard waste? |
|
|
| What equations must I use? |
|
|
| What definitions must I know? |
|
Subpart FFFF--EMISSION GUIDELINES AND COMPLIANCE TIMES FOR OTHER SOLID WASTE INCINERATION UNITS THAT COMMENCED CONSTRUCTION ON OR BEFORE DECEMBER 9, 2004
|
| What is the purpose of this subpart? |
|
|
| Am I affected by this subpart? |
|
|
| Is a State plan required for all States? |
|
|
| What must I include in my State plan? |
|
|
| Is there an approval process for my State plan? |
|
|
| What if my State plan is not approvable? |
|
|
| Is there an approval process for a negative declaration letter? |
|
|
| What compliance schedule must I include in my State plan? |
|
|
| Are there any State plan requirements for this subpart that apply instead of the requirements specified in subpart B of this part? |
|
|
| Does this subpart directly affect incineration unit owners and operators in my State? |
|
|
| What Authorities are withheld by EPA? |
|
|
| What incineration units must I address in my State plan? |
|
|
| What is an existing incineration unit? |
|
|
| Are any combustion units excluded from my State plan? |
|
|
| Are air curtain incinerators regulated under this subpart? |
|
|
| What is the purpose of the ''model rule'' in this subpart? |
|
|
| How does the model rule relate to the required elements of my State plan? |
|
|
| What are the principal components of the model rule? |
|
|
| What must I do if I close my OSWI unit and then restart it? |
|
|
| What must I do if I plan to permanently close my OSWI unit and not restart it? |
|
|
| What is a waste management plan? |
|
|
| When must I submit my waste management plan? |
|
|
| What should I include in my waste management plan? |
|
|
| What are the operator training and qualification requirements? |
|
|
| When must the operator training course be completed? |
|
|
| How do I obtain my operator qualification? |
|
|
| How do I maintain my operator qualification? |
|
|
| How do I renew my lapsed operator qualification? |
|
|
| What site-specific documentation is required? |
|
|
| What if all the qualified operators are temporarily not accessible? |
|
|
| What emission limitations must I meet and by when? |
|
|
| What operating limits must I meet and by when? |
|
|
| What if I do not use a wet scrubber to comply with the emission limitations? |
|
|
| What happens during periods of startup, shutdown, and malfunction? |
|
|
| How do I conduct the initial and annual performance test? |
|
|
| How are the performance test data used? |
|
|
| How do I demonstrate initial compliance with the emission limitations and establish the operating limits? |
|
|
| By what date must I conduct the initial performance test? |
|
|
| How do I demonstrate continuous compliance with the emission limitations and the operating limits? |
|
|
| By what date must I conduct the annual performance test? |
|
|
| May I conduct performance testing less often? |
|
|
| May I conduct a repeat performance test to establish new operating limits? |
|
|
| What continuous emission monitoring systems must I install? |
|
|
| How do I make sure my continuous emission monitoring systems are operating correctly? |
|
|
| What is my schedule for evaluating continuous emission monitoring systems? |
|
|
| What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems, and is the data collection requirement enforceable? |
|
|
| How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units? |
|
|
| What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? |
|
|
| Is there a minimum amount of operating parameter monitoring data I must obtain? |
|
|
| What records must I keep? |
|
|
| Where and in what format must I keep my records? |
|
|
| What reports must I submit? |
|
|
| What information must I submit following my initial performance test? |
|
|
| When must I submit my annual report? |
|
|
| What information must I include in my annual report? |
|
|
| What else must I report if I have a deviation from the operating limits or the emission limitations? |
|
|
| What must I include in the deviation report? |
|
|
| What else must I report if I have a deviation from the requirement to have a qualified operator accessible? |
|
|
| Are there any other notifications or reports that I must submit? |
|
|
| In what form can I submit my reports? |
|
|
| Can reporting dates be changed? |
|
|
| Am I required to apply for and obtain a title V operating permit for my unit? |
|
|
| When must I submit a title V permit application for my existing unit? |
|
|
| What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery? |
|
|
| What is an air curtain incinerator? |
|
|
| When must I comply if my air curtain incinerator burns only wood waste, clean lumber, and yard waste? |
|
|
| What must I do if I close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and then restart it? |
|
|
| What must I do if I plan to permanently close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not restart it? |
|
|
| What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
|
|
| How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
|
|
| What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
|
|
| Am I required to apply for and obtain a title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber, and yard waste? |
|
|
| What equations must I use? |
|
|
| What definitions must I know? |
|
Subpart GGGG--[RESERVED]
Subpart HHHH--EMISSION GUIDELINES AND COMPLIANCE TIMES FOR COAL-FIRED ELECTRIC STEAM GENERATING UNITS
|
| Measurements, abbreviations, and acronyms. |
|
|
| Authorization and Responsibilities of Hg designated representative. |
|
|
| Alternate Hg designated representative. |
|
|
| Changing Hg designated representative and alternate Hg designated representative; changes in owners and operators. |
|
|
| Certificate of representation. |
|
|
| Objections concerning Hg designated representative. |
|
|
| General Hg budget trading program permit requirements. |
|
|
| Submission of Hg budget permit applications. |
|
|
| Information requirements for Hg budget permit applications. |
|
|
| Hg budget permit contents and term. |
|
|
| Hg budget permit revisions. |
|
|
| Timing requirements for Hg allowance allocations. |
|
|
| Hg allowance allocations. |
|
|
| Establishment of accounts. |
|
|
| Responsibilities of Hg authorized account representative. |
|
|
| Recordation of Hg allowance allocations. |
|
|
| Compliance with Hg budget emissions limitation. |
|
|
| Closing of general accounts. |
|
|
| Submission of Hg allowance transfers. |
|
|
| Initial certification and recertification procedures. |
|
|
| Recordkeeping and reporting. |
|
|
| Additional requirements to provide heat input data. |
|
Subpart IIII--STANDARDS OF PERFORMANCE FOR STATIONARY COMPRESSION IGNITION INTERNAL COMBUSTION ENGINES
|
| Am I subject to this subpart? |
|
|
| What emission standards must I meet for non-emergency engines if I am a stationary CI internal combustion engine manufacturer? |
|
|
| What emission standards must I meet for emergency engines if I am a stationary CI internal combustion engine manufacturer? |
|
|
| How long must my engines meet the emission standards if I am a stationary CI internal combustion engine manufacturer? |
|
|
| What emission standards must I meet for non-emergency engines if I am an owner or operator of a stationary CI internal combustion engine? |
|
|
| What emission standards must I meet for emergency engines if I am an owner or operator of a stationary CI internal combustion engine? |
|
|
| How long must I meet the emission standards if I am an owner or operator of a stationary CI internal combustion engine? |
|
|
| What fuel requirements must I meet if I am an owner or operator of a stationary CI internal combustion engine subject to this subpart? |
|
|
| What is the deadline for importing or installing stationary CI ICE produced in the previous model year? |
|
|
| What are the monitoring requirements if I am an owner or operator of a stationary CI internal combustion engine? |
|
|
| What are my compliance requirements if I am a stationary CI internal combustion engine manufacturer? |
|
|
| What are my compliance requirements if I am an owner or operator of a stationary CI internal combustion engine? |
|
|
| What test methods and other procedures must I use if I am an owner or operator of a stationary CI internal combustion engine with a displacement of less than 30 liters per cylinder? |
|
|
| What test methods and other procedures must I use if I am an owner or operator of a stationary CI internal combustion engine with a displacement of greater than or equal to 30 liters per cylinder? |
|
|
| What are my notification, reporting, and recordkeeping requirements if I am an owner or operator of a stationary CI internal combustion engine? |
|
|
| What requirements must I meet for engines used in Guam, American Samoa, or the Commonwealth of the Northern Mariana Islands? |
|
|
| What requirements must I meet for engines used in Alaska? |
|
|
| What emission standards must I meet if I am an owner or operator of a stationary internal combustion engine using special fuels? |
|
|
| What parts of the General Provisions apply to me? |
|
|
| What definitions apply to this subpart? |
|
|
| Table 1 to Subpart IIII of Part 60
--Emission Standards for Stationary Pre-2007 Model Year Engines With a Displacement of <10 Liters per Cylinder and 2007-2010 Model Year Engines >2,237 KW (3,000 HP) and With a Displacement of <10 Liters per Cylinder |
|
|
| Table 2 to Subpart IIII of Part 60
--Emission Standards for 2008 Model Year and Later Emergency Stationary CI ICE <37 KW (50 HP) With a Displacement of <10 Liters per Cylinder |
|
Subpart JJJJ--STANDARDS OF PERFORMANCE FOR STATIONARY SPARK IGNITION INTERNAL COMBUSTION ENGINES
|
| Am I subject to this subpart? |
|
|
| What emission standards must I meet if I am a manufacturer of stationary SI internal combustion engines or equipment containing such engines? |
|
|
| How long must my engines meet the emission standards if I am a manufacturer of stationary SI internal combustion engines? |
|
|
| What emission standards must I meet if I am an owner or operator of a stationary SI internal combustion engine? |
|
|
| How long must I meet the emission standards if I am an owner or operator of a stationary SI internal combustion engine? |
|
|
| What fuel requirements must I meet if I am an owner or operator of a stationary SI gasoline fired internal combustion engine subject to this subpart? |
|
|
| What is the deadline for importing or installing stationary SI ICE produced in the previous model year? |
|
|
| What are the monitoring requirements if I am an owner or operator of an emergency stationary SI internal combustion engine? |
|
|
| What are my compliance requirements if I am a manufacturer of stationary SI internal combustion engines ≤19 KW (25 HP) or a manufacturer of equipment containing such engines? |
|
|
| What are my compliance requirements if I am a manufacturer of stationary SI internal combustion engines >19 KW (25 HP) that use gasoline or a manufacturer of equipment containing such engines? |
|
|
| What are my compliance requirements if I am a manufacturer of stationary SI internal combustion engines >19 KW (25 HP) that are rich burn engines that use LPG or a manufacturer of equipment containing such engines? |
|
|
| What are my compliance requirements if I am a manufacturer of stationary SI internal combustion engines participating in the voluntary certification program or a manufacturer of equipment containing such engines? |
|
|
| What other requirements must I meet if I am a manufacturer of stationary SI internal combustion engines or equipment containing stationary SI internal combustion engines or a manufacturer of equipment containing such engines? |
|
|
| What are my compliance requirements if I am an owner or operator of a stationary SI internal combustion engine? |
|
|
| What test methods and other procedures must I use if I am an owner or operator of a stationary SI internal combustion engine? |
|
|
| What are my notification, reporting, and recordkeeping requirements if I am an owner or operator of a stationary SI internal combustion engine? |
|
|
| What parts of the General Provisions apply to me? |
|
|
| What parts of the mobile source provisions apply to me if I am a manufacturer of stationary SI internal combustion engines or a manufacturer of equipment containing such engines? |
|
|
| What definitions apply to this subpart? |
|
|
| Table 1 to Subpart JJJJ of Part 60
--NOX, CO, and VOC Emission Standards for Stationary Non-Emergency SI Engines >eqt;100 HP (Except Gasoline and Rich Burn LPG), Stationary SI Landfill/Digester Gas Engines, and Stationary Emergency Engines >25 HP |
|
|
| Table 4 to Subpart JJJJ of Part 60
--Applicability of Mobile Source Provisions for Manufacturers Participating in the Voluntary Certification Program and Certifying Stationary SI ICE to Emission Standards in Table 1 of Subpart JJJJ |
|
Subpart KKKK--STANDARDS OF PERFORMANCE FOR STATIONARY COMBUSTION TURBINES
|
| What is the purpose of this subpart? |
|
|
| Does this subpart apply to my stationary combustion turbine? |
|
|
| What types of operations are exempt from these standards of performance? |
|
|
| What pollutants are regulated by this subpart? |
|
|
| What emission limits must I meet for nitrogen oxides (NO)? |
|
|
| What emission limits must I meet for NOif my turbine burns both natural gas and distillate oil (or some other combination of fuels)? |
|
|
| What emission limits must I meet for sulfur dioxide (SO2)? |
|
|
| What are my general requirements for complying with this subpart? |
|
|
| How do I demonstrate compliance for NOif I use water or steam injection? |
|
|
| How do I demonstrate continuous compliance for NOif I do not use water or steam injection? |
|
|
| What are the requirements for the continuous emission monitoring system equipment, if I choose to use this option? |
|
|
| How do I use data from the continuous emission monitoring equipment to identify excess emissions? |
|
|
| How do I establish and document a proper parameter monitoring plan? |
|
|
| How do I determine the total sulfur content of the turbine's combustion fuel? |
|
|