 |
|
 |
Home Page > Executive Branch > Code of Federal Regulations > Electronic Code of Federal Regulations

e-CFR Data is current as of February 4, 2010
TITLE 40--Protection of Environment
CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY
SUBCHAPTER C--AIR PROGRAMS
PART 93--DETERMINING CONFORMITY OF FEDERAL ACTIONS TO STATE OR FEDERAL IMPLEMENTATION PLANS
Subpart A--CONFORMITY TO STATE OR FEDERAL IMPLEMENTATION PLANS OF TRANSPORTATION PLANS, PROGRAMS, AND PROJECTS DEVELOPED, FUNDED OR APPROVED UNDER TITLE 23 U.S.C. OR THE FEDERAL TRANSIT LAWS
|
| Frequency of conformity determinations. |
|
|
| Content of transportation plans and timeframe of conformity determinations. |
|
|
| Relationship of transportation plan and TIP conformity with the NEPA process. |
|
|
| Fiscal constraints for transportation plans and TIPs. |
|
|
| Criteria and procedures for determining conformity of transportation plans, programs, and projects: General. |
|
|
| Criteria and procedures: Latest planning assumptions. |
|
|
| Criteria and procedures: Latest emissions model. |
|
|
| Criteria and procedures: Consultation. |
|
|
| Criteria and procedures: Timely implementation of TCMs. |
|
|
| Criteria and procedures: Currently conforming transportation plan and TIP. |
|
|
| Criteria and procedures: Projects from a transportation plan and TIP. |
|
|
| Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots). |
|
|
| Criteria and procedures: Compliance with PM10 and PM2.5 control measures. |
|
|
| Criteria and procedures: Motor vehicle emissions budget. |
|
|
| Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets. |
|
|
| Consequences of control strategy implementation plan failures. |
|
|
| Requirements for adoption or approval of projects by other recipients of funds designated under title 23 U.S.C. or the Federal Transit Laws. |
|
|
| Procedures for determining regional transportation-related emissions. |
|
|
| Procedures for determining localized CO, PM10, and PM2.5 concentrations (hot-spot analysis). |
|
|
| Using the motor vehicle emissions budget in the applicable implementation plan (or implementation plan submission). |
|
|
| Enforceability of design concept and scope and project-level mitigation and control measures. |
|
|
| Projects exempt from regional emissions analyses. |
|
|
| Traffic signal synchronization projects. |
|
|
| Special exemptions from conformity requirements for pilot program areas. |
|
Subpart B--DETERMINING CONFORMITY OF GENERAL FEDERAL ACTIONS TO STATE OR FEDERAL IMPLEMENTATION PLANS
|
| State implementation plan (SIP) revision. |
|
|
| Frequency of conformity determinations. |
|
|
| Criteria for determining conformity of general Federal actions. |
|
|
| Procedures for conformity determinations of general Federal actions. |
|
|
| Mitigation of air quality impacts. |
|
|